X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425080115003

Well Details

Well ID: 0425080115003
Loading map...
Location: 00/15-01-042-08W5/3
Location Alias: 00/15-01-42-08 W5M
Location Alias 2: 00/15-01-042-08 W5/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 01
County/Municipality: Clearwater County
Well Name: CABRE ET AL WILLGR 15-1-42-8
Operator Name: Enerplus Corporation
License Number: 0241021
License Date: 2000-08-17
License Status: Issued
Spud Date: 2000-08-24
Final Drill Date: 2000-09-17
Well Total Depth: 2700.00 m
Surface Hole Latitude: 52.592463
Surface Hole Longitude: -115.021465

For data sources see[1][2]

Well History

Date Event
2000-08-17 Obtained License
2000-08-31 Surface Casing Operation Performed
2000-09-09 Direction Drilling Operation Performed - Deviate
2000-09-17 Finished Drilling
2000-09-17 Well Mode changed to Drilled and Cased
2000-09-18 Well Log Performed
2000-09-19 Drill Stem Test Performed
2000-09-20 Drill Stem Test Performed
2000-09-21 Production Casing Operation Performed
2000-09-22 Rig Released
2000-10-02 Perforation Treatment Performed - Jet Perforation
2000-10-02 Well Log Performed
2000-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-05 Perforation Treatment Performed - Jet Perforation
2000-10-07 Perforation Treatment Performed - Fractured
2000-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-10 Plug Back Performed
2000-10-10 Well Log Performed
2000-10-11 Perforation Treatment Performed - Jet Perforation
2000-10-13 Perforation Treatment Performed - Fractured
2001-01-16 Well Began Production
2001-01-16 Well Fluid changed to Gas
2001-01-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-09-09 2112.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-02 Perforation 2566.50 2567.50 17
2000-10-03 Acid Treatment 2566.50 2567.50 0
2000-10-05 Perforation 2550.50 2553.00 17
2000-10-07 Fracture 2550.50 2553.00 0
2000-10-10 Packing Device Capped w/Cement 2537.00 2545.00 0
2000-10-11 Perforation 2500.50 2504.00 17
2000-10-13 Fracture 2500.50 2504.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4900 0.0 0.0 0.0
2002 7823 0.0 0.0 0.0
2003 6938 0.0 0.0 0.0
2004 6615 0.0 0.0 0.0
2005 7712 0.0 0.0 0.0
2006 8713 0.0 0.0 0.0
2007 8758 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8706 0.0 0.0 0.0
2010 8503 0.0 0.0 0.0
2011 8572 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 6744 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7446 0.0 0.0 0.0
2019 5842 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References