X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0424232404002"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0424232404002
 
| Well ID: 0424232404002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.6246376, -113.1927771 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.624635, -113.191830 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: ACL UNIT BASHAW 4-24-42-23
+
| Location: 00/04-24-042-23W4/2
 
|-
 
|-
| Operator:
+
| Location Alias: 00/04-24-42-23 W4M
 +
|-
 +
| Location Alias 2: 00/04-24-042-23 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 042
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 23
 +
|-
 +
| Section: 24
 +
|-
 +
| County/Municipality: [[Ponoka County,_Alberta|Ponoka County]]
 +
|-
 +
| Well Name: SUPREME BASHAW 4-24-42-23
 +
|-
 +
| Operator Name: [[Supreme Energy Inc.]]
 +
|-
 +
| License Number: 0024011
 
|-
 
|-
 
| License Date: 1963-03-25
 
| License Date: 1963-03-25
 
|-
 
|-
| Final Drilling Date: 1963-05-14
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1963-04-24
 +
|-
 +
| Final Drill Date: 1963-05-14
 +
|-
 +
| Well Total Depth: 1759.30 m
 +
|-
 +
| Surface Hole Latitude: 52.624635
 +
|-
 +
| Surface Hole Longitude: -113.191830
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1963-03-25
 +
| Obtained License
 +
|-
 +
| 1963-05-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-05-14
 +
| Finished Drilling
 +
|-
 +
| 1963-05-14
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1963-05-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-05-17
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-05-18
 +
| Drill Stem Test Performed
 +
|-
 +
| 1963-05-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1963-05-19
 +
| Production Casing Operation Performed
 +
|-
 +
| 1963-07-16
 +
| Perforation Treatment Performed - Selective Bullet Perforations
 +
|-
 +
| 1963-08-01
 +
| Well Began Production
 +
|-
 +
| 1963-08-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1963-08-01
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1963-08-15
 +
| Perforation Treatment Performed - Nitrogen Treatment
 +
|-
 +
| 1964-01-16
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-01-16
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1964-01-16
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1964-01-22
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 1964-01-26
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-01-28
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1964-01-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-01-31
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-02-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1964-02-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-02-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1964-03-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1966-03-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1966-03-06
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1966-03-07
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1984-11-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 
|-
 
|-
| Total Depth: 1759.3m
+
| 1984-11-20
 +
| Plug Back Performed
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1984-11-21
 +
| Well Log Performed
 
|-
 
|-
| Status: Abandoned Zone
+
| 1984-11-23
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Well Type: Not Applicable
+
| 1986-01-22
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Configuration: Vertical
+
| 1986-01-24
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Violations:
+
| 1986-08-15
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Latitude: 52.6246376
+
| 1986-08-15
 +
| Plug Back Performed
 
|-
 
|-
| Longitude: -113.1927771
+
| 1986-08-19
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1963-05-19
 +
| Perforation
 +
| style="text-align: right;" | 1708.70
 +
| style="text-align: right;" | 1711.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1964-01-28
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1736.80
 +
| style="text-align: right;" | 1737.10
 +
| style="text-align: right;" | 10
 +
|-
 +
| 1964-01-30
 +
| Acid Treatment
 +
| style="text-align: right;" | 1736.80
 +
| style="text-align: right;" | 1737.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-01-31
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1736.80
 +
| style="text-align: right;" | 1737.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-02-01
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1736.80
 +
| style="text-align: right;" | 1737.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-02-03
 +
| Perforation
 +
| style="text-align: right;" | 1738.30
 +
| style="text-align: right;" | 1738.60
 +
| style="text-align: right;" | 10
 +
|-
 +
| 1964-02-03
 +
| Acid Treatment
 +
| style="text-align: right;" | 1738.30
 +
| style="text-align: right;" | 1738.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-03-03
 +
| Acid Treatment
 +
| style="text-align: right;" | 1738.30
 +
| style="text-align: right;" | 1738.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1966-03-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1738.30
 +
| style="text-align: right;" | 1738.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1966-03-06
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1708.70
 +
| style="text-align: right;" | 1711.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1966-03-07
 +
| Acid Wash
 +
| style="text-align: right;" | 1708.70
 +
| style="text-align: right;" | 1711.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-07-16
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 1679.80
 +
| style="text-align: right;" | 1682.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-11-20
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1689.00
 +
| style="text-align: right;" | 1689.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-11-23
 +
| Perforation
 +
| style="text-align: right;" | 1485.60
 +
| style="text-align: right;" | 1487.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-01-22
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1485.60
 +
| style="text-align: right;" | 1487.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-01-24
 +
| Perforation
 +
| style="text-align: right;" | 1459.40
 +
| style="text-align: right;" | 1461.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-01-24
 +
| Perforation
 +
| style="text-align: right;" | 1461.90
 +
| style="text-align: right;" | 1462.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1986-08-15
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1459.40
 +
| style="text-align: right;" | 1462.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-08-19
 +
| Perforation
 +
| style="text-align: right;" | 1708.70
 +
| style="text-align: right;" | 1711.80
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1963-07-16
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 1684.90
 +
| style="text-align: right;" | 1686.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-07-16
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 1687.40
 +
| style="text-align: right;" | 1690.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-07-16
 +
| Selective Bullet Perforations
 +
| style="text-align: right;" | 1696.20
 +
| style="text-align: right;" | 1701.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1963-08-15
 +
| Nitrogen Treatment
 +
| style="text-align: right;" | 1679.80
 +
| style="text-align: right;" | 1701.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-01-16
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1679.80
 +
| style="text-align: right;" | 1701.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-01-22
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1736.10
 +
| style="text-align: right;" | 1736.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-01-26
 +
| Acid Treatment
 +
| style="text-align: right;" | 1736.10
 +
| style="text-align: right;" | 1736.10
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:22, 19 January 2021

Well Details

Well ID: 0424232404002
Loading map...
Location: 00/04-24-042-23W4/2
Location Alias: 00/04-24-42-23 W4M
Location Alias 2: 00/04-24-042-23 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 24
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 4-24-42-23
Operator Name: Supreme Energy Inc.
License Number: 0024011
License Date: 1963-03-25
License Status: Issued
Spud Date: 1963-04-24
Final Drill Date: 1963-05-14
Well Total Depth: 1759.30 m
Surface Hole Latitude: 52.624635
Surface Hole Longitude: -113.191830

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-25 Obtained License
1963-05-11 Drill Stem Test Performed
1963-05-14 Finished Drilling
1963-05-14 Well Mode changed to Drilled and Cased
1963-05-16 Drill Stem Test Performed
1963-05-17 Drill Stem Test Performed
1963-05-18 Drill Stem Test Performed
1963-05-19 Perforation Treatment Performed - Jet Perforation
1963-05-19 Production Casing Operation Performed
1963-07-16 Perforation Treatment Performed - Selective Bullet Perforations
1963-08-01 Well Began Production
1963-08-01 Well Fluid changed to Crude Oil
1963-08-01 Well Mode changed to Pumping
1963-08-15 Perforation Treatment Performed - Nitrogen Treatment
1964-01-16 Perforation Treatment Performed - Cement Squeeze
1964-01-16 Well Fluid changed to Crude Oil
1964-01-16 Well Mode changed to Abandoned Zone
1964-01-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-28 Perforation Treatment Performed - Bullet Perforation
1964-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-31 Perforation Treatment Performed - Cement Squeeze
1964-02-01 Perforation Treatment Performed - Cement Squeeze
1964-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-02-03 Perforation Treatment Performed - Jet Perforation
1964-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-04 Perforation Treatment Performed - Cement Squeeze
1966-03-06 Perforation Treatment Performed - Bullet Perforation
1966-03-07 Perforation Treatment Performed - Acid Wash - No Pressure
1984-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-20 Plug Back Performed
1984-11-21 Well Log Performed
1984-11-23 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Cement Squeeze
1986-01-24 Perforation Treatment Performed - Jet Perforation
1986-08-15 Perforation Treatment Performed - Cement Squeeze
1986-08-15 Plug Back Performed
1986-08-19 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-19 Perforation 1708.70 1711.80 7
1964-01-28 Bullet Perforation 1736.80 1737.10 10
1964-01-30 Acid Treatment 1736.80 1737.10 0
1964-01-31 Cement Squeeze 1736.80 1737.10 0
1964-02-01 Cement Squeeze 1736.80 1737.10 0
1964-02-03 Perforation 1738.30 1738.60 10
1964-02-03 Acid Treatment 1738.30 1738.60 0
1964-03-03 Acid Treatment 1738.30 1738.60 0
1966-03-04 Cement Squeeze 1738.30 1738.60 0
1966-03-06 Bullet Perforation 1708.70 1711.80 7
1966-03-07 Acid Wash 1708.70 1711.80 0
1963-07-16 Selective Bullet Perforations 1679.80 1682.50 0
1984-11-20 Packing Device Capped w/Cement 1689.00 1689.00 0
1984-11-23 Perforation 1485.60 1487.40 13
1986-01-22 Cement Squeeze 1485.60 1487.40 0
1986-01-24 Perforation 1459.40 1461.50 13
1986-01-24 Perforation 1461.90 1462.80 13
1986-08-15 Cement Squeeze 1459.40 1462.80 0
1986-08-19 Perforation 1708.70 1711.80 7
1963-07-16 Selective Bullet Perforations 1684.90 1686.80 0
1963-07-16 Selective Bullet Perforations 1687.40 1690.40 0
1963-07-16 Selective Bullet Perforations 1696.20 1701.40 0
1963-08-15 Nitrogen Treatment 1679.80 1701.40 0
1964-01-16 Cement Squeeze 1679.80 1701.40 0
1964-01-22 Hydra Jet Perforation 1736.10 1736.10 0
1964-01-26 Acid Treatment 1736.10 1736.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0

For data sources see[5]

References