X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023108000

Well Details

Well ID: 0424023108000
Loading map...
Location: 00/08-31-042-02W4/0
Location Alias: 00/08-31-42-02 W4M
Location Alias 2: 00/08-31-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 31
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN CHAUVS 8-31-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0090217
License Date: 1981-05-20
License Status: RecCertified
Spud Date: 1981-05-27
Final Drill Date: 1981-05-30
Well Total Depth: 672.00 m
Surface Hole Latitude: 52.657437
Surface Hole Longitude: -110.273399

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-05-20 Obtained License
1981-05-29 Kick Occurred
1981-05-30 Finished Drilling
1981-05-30 Well Mode changed to Drilled and Cased
1981-05-31 Production Casing Operation Performed
1981-06-09 Perforation Treatment Performed - Jet Perforation
1981-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-06-11 Perforation Treatment Performed - Jet Perforation
1981-06-17 Perforation Treatment Performed - Fractured
1981-07-01 Well Began Production
1981-07-01 Well Fluid changed to Crude Oil
1981-07-01 Well Mode changed to Pumping
1981-09-01 Well Fluid changed to Crude Oil
1981-09-01 Well Mode changed to Suspended
2000-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-11 Perforation Treatment Performed - Jet Perforation
2000-01-11 Plug Back Performed
2000-01-12 Perforation Treatment Performed - Cement Plug
2000-01-12 Perforation Treatment Performed - Remedial Casing
2000-01-13 Well Abandoned
2000-01-13 Well Fluid changed to Crude Oil
2000-01-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-06-09 Perforation 660.00 663.00 7
1981-06-10 Packing Device Capped w/Cement 647.00 655.00 0
1981-06-11 Perforation 617.50 619.00 7
1981-06-11 Perforation 621.50 623.00 7
1981-06-17 Fracture 617.50 623.00 0
2000-01-11 Packing Device Capped w/Cement 599.00 607.00 0
2000-01-11 Perforation 435.00 436.00 14
2000-01-12 Remedial Casing Cementing 435.00 436.00 0
2000-01-12 Cement Plug 400.00 436.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 936 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-05-29 Kick 504.00 504.00

For data sources see[6]

References