If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424013411030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.662318,"lon":-110.069725,"icon":""}]} |
Location: 03/11-34-042-01W4/0 | |
Location Alias: 03/11-34-42-01 W4M | |
Location Alias 2: 03/11-34-042-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 01 | |
Section: 34 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: BP ET AL CHAUVS 11-34CY-42-1 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0129485 | |
License Date: 1987-10-21 | |
License Status: RecCertified | |
Spud Date: 1987-11-01 | |
Final Drill Date: 1987-11-03 | |
Well Total Depth: 573.00 m | |
Surface Hole Latitude: 52.662318 | |
Surface Hole Longitude: -110.069725 |
Date | Event |
---|---|
1987-10-21 | Obtained License |
1987-11-02 | Surface Casing Operation Performed |
1987-11-03 | Finished Drilling |
1987-11-03 | Well Mode changed to Drilled and Cased |
1987-11-04 | Production Casing Operation Performed |
1987-11-04 | Rig Released |
1987-12-19 | Perforation Treatment Performed - Open-Hole Completion |
1988-01-01 | Well Began Production |
1988-01-01 | Well Fluid changed to Crude Oil |
1988-01-01 | Well Mode changed to Pumping |
1988-03-23 | Well Log Performed |
1991-07-11 | Well Fluid changed to Crude Oil |
1991-07-11 | Well Mode changed to Suspended |
1992-03-01 | Well Fluid changed to Crude Oil |
1992-03-01 | Well Mode changed to Pumping |
1997-09-18 | Well Log Performed |
1997-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-09-19 | Plug Back Performed |
1997-09-23 | Well Abandoned |
1997-09-23 | Well Fluid changed to Crude Oil |
1997-09-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-12-19 | Open Hole/Barefoot Completion | 566.50 | 573.00 | 0 |
1997-09-19 | Packing Device Capped w/Cement | 544.00 | 552.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 6967 | 0.0 | 0.0 | 0.0 |
1989 | 942 | 0.0 | 0.0 | 0.0 |
1990 | 2138 | 0.0 | 0.0 | 0.0 |
1991 | 24 | 0.0 | 0.0 | 0.0 |
1992 | 330 | 0.0 | 0.0 | 0.0 |
For data sources see[5]