If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0404030308B00 | | Well ID: 0404030308B00 | ||
− | | style="height=100%; align=center" rowspan="21" | {{#display_map: 52.410470, -110. | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 52.410470, -110.347540 | width=100% | height=100% }} |
|- | |- | ||
| Location: B0/08-03-040-03W4/0 | | Location: B0/08-03-040-03W4/0 | ||
Line 43: | Line 43: | ||
| Surface Hole Latitude: 52.410470 | | Surface Hole Latitude: 52.410470 | ||
|- | |- | ||
− | | Surface Hole Longitude: -110. | + | | Surface Hole Longitude: -110.347540 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
Line 213: | Line 213: | ||
| style="text-align: right;" | 854.00 | | style="text-align: right;" | 854.00 | ||
| style="text-align: right;" | 13 | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2008-05-25 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 803.50 | ||
+ | | style="text-align: right;" | 805.00 | ||
+ | | style="text-align: right;" | 20 | ||
+ | |- | ||
+ | | 2008-05-26 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 799.00 | ||
+ | | style="text-align: right;" | 801.00 | ||
+ | | style="text-align: right;" | 20 | ||
+ | |- | ||
+ | | 2016-07-27 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 783.00 | ||
+ | | style="text-align: right;" | 792.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1992-11-17 | | 1992-11-17 | ||
Line 260: | Line 278: | ||
| style="text-align: right;" | 838.00 | | style="text-align: right;" | 838.00 | ||
| style="text-align: right;" | 846.00 | | style="text-align: right;" | 846.00 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 412: | Line 412: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0404030308B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.41047,"lon":-110.34754,"icon":""}]} |
Location: B0/08-03-040-03W4/0 | |
Location Alias: B0/08-03-40-03 W4M | |
Location Alias 2: B0/08-03-040-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 03 | |
Section: 03 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: SURGE ENERGY PROVOST 8-3-40-3 | |
Operator Name: Surge Energy Inc. | |
License Number: 0154349 | |
License Date: 1992-11-03 | |
License Status: Abandoned | |
Spud Date: 1992-11-11 | |
Final Drill Date: 1992-11-14 | |
Well Total Depth: 916.00 m | |
Surface Hole Latitude: 52.410470 | |
Surface Hole Longitude: -110.347540 |
Date | Event |
---|---|
1992-11-03 | Obtained License |
1992-11-12 | Direction Drilling Operation Performed - Deviate |
1992-11-12 | Surface Casing Operation Performed |
1992-11-14 | Finished Drilling |
1992-11-14 | Production Casing Operation Performed |
1992-11-14 | Rig Released |
1992-11-14 | Well Log Performed |
1992-11-14 | Well Mode changed to Drilled and Cased |
1992-11-16 | Perforation Treatment Performed - Jet Perforation |
1992-11-17 | Perforation Treatment Performed - Jet Perforation |
1992-11-24 | Well Began Production |
1992-11-24 | Well Fluid changed to Crude Oil |
1992-11-24 | Well Mode changed to Pumping |
1992-12-04 | Well Log Performed |
2000-04-01 | Well Fluid changed to Crude Oil |
2000-04-01 | Well Mode changed to Suspended |
2004-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-03-05 | Perforation Treatment Performed - Jet Perforation |
2008-03-05 | Well Log Performed |
2008-03-06 | Perforation Treatment Performed - Cement Squeeze |
2008-03-06 | Plug Back Performed |
2008-03-06 | Well Fluid changed to Crude Oil |
2008-03-06 | Well Mode changed to Abandoned Zone |
2008-05-24 | Perforation Treatment Performed - Jet Perforation |
2008-05-24 | Well Log Performed |
2008-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-05-25 | Perforation Treatment Performed - Jet Perforation |
2008-05-25 | Plug Back Performed |
2008-05-25 | Well Log Performed |
2008-05-26 | Perforation Treatment Performed - Jet Perforation |
2008-05-26 | Well Log Performed |
2016-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2016-07-27 | Plug Back Performed |
2016-07-27 | Well Log Performed |
2016-10-04 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1992-11-12 | 293.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-11-16 | Perforation | 853.00 | 854.00 | 13 |
2008-05-25 | Perforation | 803.50 | 805.00 | 20 |
2008-05-26 | Perforation | 799.00 | 801.00 | 20 |
2016-07-27 | Packing Device Capped w/Cement | 783.00 | 792.00 | 0 |
1992-11-17 | Perforation | 855.50 | 856.50 | 13 |
2004-09-10 | Packing Device Capped w/Cement | 838.50 | 846.50 | 0 |
2008-03-05 | Perforation | 853.00 | 854.00 | 13 |
2008-03-05 | Perforation | 855.50 | 856.50 | 13 |
2008-03-06 | Cement Squeeze | 853.00 | 854.00 | 0 |
2008-03-06 | Cement Squeeze | 855.50 | 856.50 | 0 |
2008-05-24 | Perforation | 848.80 | 850.00 | 20 |
2008-05-25 | Packing Device Capped w/Cement | 838.00 | 846.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 935 | 0.0 | 0.0 | 0.0 |
1993 | 8627 | 0.0 | 0.0 | 0.0 |
1994 | 8668 | 0.0 | 0.0 | 0.0 |
1995 | 8695 | 0.0 | 0.0 | 0.0 |
1996 | 8685 | 0.0 | 0.0 | 0.0 |
1997 | 8621 | 0.0 | 0.0 | 0.0 |
1998 | 8712 | 0.0 | 0.0 | 0.0 |
1999 | 8715 | 0.0 | 0.0 | 0.0 |
2000 | 1026 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-07-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]