X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395083303002

Well Details

Well ID: 0395083303002
Loading map...
Location: 00/03-33-039-08W5/2
Location Alias: 00/03-33-39-08 W5M
Location Alias 2: 00/03-33-039-08 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 08
Section: 33
County/Municipality: Clearwater County
Well Name: WESTROCK FERRIER 3-33-39-8
Operator Name: Enerplus Corporation
License Number: 0079993
License Date: 1979-12-20
License Status: Abandoned
Spud Date: 1980-01-08
Final Drill Date: 1980-02-21
Well Total Depth: 2912.00 m
Surface Hole Latitude: 52.395478
Surface Hole Longitude: -115.098831

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-12-20 Obtained License
1980-02-21 Finished Drilling
1980-02-21 Well Mode changed to Drilled and Cased
1980-02-23 Production Casing Operation Performed
1980-05-20 Perforation Treatment Performed - Jet Perforation
1980-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-28 Perforation Treatment Performed - Jet Perforation
1980-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-05 Perforation Treatment Performed - Jet Perforation
1980-06-06 Perforation Treatment Performed - Fractured
1980-06-08 Perforation Treatment Performed - Fractured
1980-06-20 Perforation Treatment Performed - Cement Squeeze
1980-06-21 Perforation Treatment Performed - Jet Perforation
1980-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-27 Perforation Treatment Performed - Fractured
1980-10-20 Well Began Production
1980-10-20 Well Fluid changed to Crude Oil
1980-10-20 Well Mode changed to Flowing
1990-03-29 Perforation Treatment Performed - Cement Squeeze
1990-03-29 Plug Back Performed
1990-03-29 Well Fluid changed to Crude Oil
1990-03-29 Well Mode changed to Abandoned Zone
1990-04-05 Perforation Treatment Performed - Jet Perforation
1990-04-09 Perforation Treatment Performed - Fractured
1990-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-27 Perforation Treatment Performed - Jet Perforation
1990-07-27 Plug Back Performed
1990-07-28 Perforation Treatment Performed - Fractured
1990-07-31 Well Fluid changed to Crude Oil
1990-07-31 Well Mode changed to Flowing
2002-12-01 Well Fluid changed to Crude Oil
2002-12-01 Well Mode changed to Suspended
2006-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-30 Plug Back Performed
2006-01-30 Well Fluid changed to Crude Oil
2006-01-30 Well Mode changed to Abandoned Zone
2006-01-31 Well Log Performed
2006-02-01 Perforation Treatment Performed - Jet Perforation
2006-02-01 Well Log Performed
2008-09-01 Well Log Performed
2008-09-13 Perforation Treatment Performed - Jet Perforation
2008-09-13 Well Log Performed
2008-09-14 Perforation Treatment Performed - Cement Plug
2008-09-14 Plug Back Performed
2008-09-16 Perforation Treatment Performed - Jet Perforation
2008-09-16 Well Log Performed
2008-09-17 Perforation Treatment Performed - Cement Plug
2008-09-19 Perforation Treatment Performed - Cement Plug
2008-09-21 Perforation Treatment Performed - Jet Perforation
2008-09-21 Perforation Treatment Performed - Remedial Casing
2008-09-21 Well Log Performed
2008-09-23 Well Log Performed
2008-09-24 Well Log Performed
2008-09-27 Perforation Treatment Performed - Jet Perforation
2008-09-27 Perforation Treatment Performed - Remedial Casing
2008-09-27 Well Log Performed
2008-09-28 Perforation Treatment Performed - Jet Perforation
2008-09-28 Perforation Treatment Performed - Remedial Casing
2008-09-28 Well Log Performed
2008-09-29 Perforation Treatment Performed - Jet Perforation
2008-09-29 Perforation Treatment Performed - Remedial Casing
2008-09-29 Well Log Performed
2008-10-02 Well Log Performed
2008-10-03 Well Log Performed
2008-10-04 Perforation Treatment Performed - Jet Perforation
2008-10-04 Perforation Treatment Performed - Remedial Casing
2008-10-29 Well Log Performed
2008-11-01 Perforation Treatment Performed - Jet Perforation
2008-11-01 Well Log Performed
2008-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-11-02 Perforation Treatment Performed - Remedial Casing
2008-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-04 Well Log Performed
2008-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-20 Perforation 2883.00 2884.20 13
1980-06-21 Perforation 2246.50 2249.00 7
1980-06-24 Acid Treatment 2246.00 2249.00 0
1980-06-27 Fracture 2246.00 2249.00 0
1990-03-29 Cement Squeeze 2246.00 2249.00 0
1990-04-05 Perforation 2880.50 2884.50 13
1990-04-09 Fracture 2880.50 2884.50 0
1990-07-27 Perforation 2246.00 2250.00 13
1990-07-27 Packing Device Capped w/Cement 2847.00 2859.00 0
1990-07-28 Fracture 2246.00 2250.00 0
2006-01-30 Packing Device Capped w/Cement 2222.00 2230.00 0
1980-05-21 Acid Treatment 2883.00 2884.20 0
2006-02-01 Perforation 1774.00 1779.00 14
2008-09-13 Perforation 1825.00 1826.00 7
2008-09-13 Perforation 1803.00 1804.00 7
2008-09-13 Perforation 1746.00 1747.00 7
2008-09-13 Perforation 1705.00 1706.00 7
2008-09-13 Perforation 1606.00 1607.00 7
2008-09-13 Perforation 1592.00 1593.00 7
2008-09-13 Perforation 1534.00 1535.00 7
2008-09-13 Perforation 1523.00 1524.00 7
2008-09-13 Perforation 1385.00 1386.00 7
1980-05-28 Perforation 2766.50 2770.50 6
2008-09-14 Cement Plug 1453.20 1841.90 0
2008-09-16 Perforation 1237.00 1238.00 7
2008-09-16 Perforation 1185.00 1186.00 7
2008-09-16 Perforation 1178.00 1179.00 7
2008-09-16 Perforation 1165.00 1166.00 7
2008-09-16 Perforation 1134.00 1135.00 7
2008-09-16 Perforation 1081.00 1082.00 7
2008-09-16 Perforation 1060.00 1061.00 7
2008-09-16 Perforation 1017.00 1018.00 7
2008-09-16 Perforation 917.00 918.00 7
1980-05-29 Acid Treatment 2766.50 2770.50 0
2008-09-17 Cement Plug 1251.50 1453.20 0
2008-09-19 Cement Plug 904.10 1251.50 0
2008-09-21 Perforation 680.00 681.00 7
2008-09-21 Remedial Casing Cementing 680.00 681.00 0
2008-09-27 Perforation 400.00 401.00 7
2008-09-27 Remedial Casing Cementing 400.00 401.00 0
2008-09-28 Perforation 375.00 376.00 7
2008-09-28 Remedial Casing Cementing 375.00 376.00 0
2008-09-29 Perforation 340.00 341.00 7
2008-09-29 Remedial Casing Cementing 340.00 341.00 0
1980-06-05 Perforation 2734.00 2736.00 13
2008-10-04 Perforation 319.00 319.30 36
2008-10-04 Perforation 313.00 313.30 36
2008-10-04 Remedial Casing Cementing 313.00 319.30 0
2008-11-01 Perforation 824.00 825.00 13
2008-11-01 Perforation 824.30 824.60 99
2008-11-02 Acid Treatment 824.00 825.00 0
2008-11-02 Remedial Casing Cementing 824.00 825.00 0
2008-11-04 Packing Device Capped w/Cement 327.00 335.00 0
1980-06-05 Perforation 2736.70 2738.00 13
1980-06-06 Fracture 2734.00 2738.00 0
1980-06-08 Fracture 2734.00 2738.00 0
1980-06-20 Cement Squeeze 2734.00 2770.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1701 0.0 0.0 0.0
1981 3181 0.0 0.0 0.0
1982 5053 0.0 0.0 0.0
1983 8528 0.0 0.0 0.0
1984 8165 0.0 0.0 0.0
1985 8603 0.0 0.0 0.0
1986 8429 0.0 0.0 0.0
1987 8274 0.0 0.0 0.0
1988 8598 0.0 0.0 0.0
1989 8619 0.0 0.0 0.0
1990 4006 0.0 0.0 0.0
1991 6899 0.0 0.0 0.0
1992 5495 0.0 0.0 0.0
1993 4272 0.0 0.0 0.0
1994 4122 0.0 0.0 0.0
1995 8565 0.0 0.0 0.0
1996 4650 0.0 0.0 0.0
1997 6645 0.0 0.0 0.0
1998 8165 0.0 0.0 0.0
1999 6060 0.0 0.0 0.0
2000 5475 0.0 0.0 0.0
2001 7378 0.0 0.0 0.0
2002 4747 0.0 0.0 0.0

For data sources see[5]

References