If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0385041514020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.274722,"lon":-114.49085,"icon":""}]} |
Location: 02/14-15-038-04W5/0 | |
Location Alias: 02/14-15-38-04 W5M | |
Location Alias 2: 02/14-15-038-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 5 | |
Range: 04 | |
Section: 15 | |
County/Municipality: Clearwater County | |
Well Name: CVE MEDRIV 14-15-38-4 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0158862 | |
License Date: 1993-06-07 | |
License Status: RecCertified | |
Spud Date: 1993-06-13 | |
Final Drill Date: 1993-06-21 | |
Well Total Depth: 2415.00 m | |
Surface Hole Latitude: 52.274722 | |
Surface Hole Longitude: -114.490850 |
Date | Event |
---|---|
1993-06-07 | Obtained License |
1993-06-14 | Surface Casing Operation Performed |
1993-06-21 | Finished Drilling |
1993-06-21 | Well Log Performed |
1993-06-21 | Well Mode changed to Drilled and Cased |
1993-06-22 | Well Log Performed |
1993-06-23 | Drill Stem Test Performed |
1993-06-24 | Drill Stem Test Performed |
1993-06-27 | Production Casing Operation Performed |
1993-06-27 | Rig Released |
1993-07-09 | Well Log Performed |
1993-07-10 | Perforation Treatment Performed - Jet Perforation |
1993-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-07-13 | Plug Back Performed |
1993-07-13 | Well Log Performed |
1993-07-14 | Perforation Treatment Performed - Jet Perforation |
1993-07-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-07-18 | Perforation Treatment Performed - Chemical Squeeze |
1993-07-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-07-20 | Well Log Performed |
1993-07-21 | Perforation Treatment Performed - Jet Perforation |
1993-07-25 | Perforation Treatment Performed - Fractured |
1993-08-08 | Well Began Production |
1993-08-08 | Well Fluid changed to Crude Oil |
1993-08-08 | Well Mode changed to Flowing |
1997-08-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-27 | Plug Back Performed |
1997-08-27 | Well Log Performed |
1997-08-29 | Perforation Treatment Performed - Jet Perforation |
1997-08-29 | Well Log Performed |
1997-09-02 | Perforation Treatment Performed - Fractured |
1997-09-06 | Perforation Treatment Performed - Jet Perforation |
1997-09-06 | Well Log Performed |
1997-09-07 | Perforation Treatment Performed - Cement Squeeze |
1997-09-07 | Plug Back Performed |
1997-09-13 | Perforation Treatment Performed - Jet Perforation |
1997-09-13 | Perforation Treatment Performed - Remedial Casing |
1997-09-24 | Well Abandoned |
1997-09-24 | Well Fluid changed to Crude Oil |
1997-09-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-07-10 | Perforation | 2353.50 | 2356.50 | 13 |
1993-07-20 | Packing Device Capped w/Cement | 2309.50 | 2311.00 | 0 |
1993-07-21 | Perforation | 2300.00 | 2305.00 | 13 |
1993-07-25 | Fracture | 2300.00 | 2305.00 | 0 |
1997-08-27 | Packing Device Capped w/Cement | 2287.00 | 2295.00 | 0 |
1997-08-29 | Perforation | 2265.50 | 2267.50 | 17 |
1997-09-02 | Fracture | 2265.50 | 2267.50 | 0 |
1997-09-06 | Perforation | 2264.50 | 2266.50 | 20 |
1997-09-07 | Cement Squeeze | 2264.50 | 2266.50 | 0 |
1997-09-13 | Perforation | 482.00 | 483.00 | 13 |
1997-09-13 | Remedial Casing Cementing | 482.00 | 483.00 | 0 |
1993-07-10 | Perforation | 2360.00 | 2361.50 | 13 |
1993-07-11 | Acid Treatment | 2353.50 | 2361.50 | 0 |
1993-07-13 | Packing Device Capped w/Cement | 2342.00 | 2350.00 | 0 |
1993-07-14 | Perforation | 2312.50 | 2314.00 | 13 |
1993-07-14 | Perforation | 2315.50 | 2319.00 | 13 |
1993-07-14 | Perforation | 2322.50 | 2325.50 | 13 |
1993-07-15 | Acid Treatment | 2312.50 | 2323.50 | 0 |
1993-07-18 | Chemical Squeeze | 2312.50 | 2325.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 3480 | 0.0 | 0.0 | 0.0 |
1994 | 8644 | 0.0 | 0.0 | 0.0 |
1995 | 7887 | 0.0 | 0.0 | 0.0 |
1997 | 937 | 0.0 | 0.0 | 0.0 |
For data sources see[5]