X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0384251406000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0384251406000
 
| Well ID: 0384251406000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.265219, -113.472632 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.265219, -113.472632 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-14-038-25W4/0
 
| Location: 00/06-14-038-25W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/06-14-038-25 W4/00
 
| Location Alias 2: 00/06-14-038-25 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 038
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 14
 
|-
 
|-
 
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
 
| County/Municipality: [[Lacombe County,_Alberta|Lacombe County]]
Line 17: Line 27:
 
| Well Name: NAL JOFFRE 6-14-38-25
 
| Well Name: NAL JOFFRE 6-14-38-25
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[NAL Resources Limited]]
 
|-
 
|-
 
| License Number: 0053564
 
| License Number: 0053564
Line 29: Line 39:
 
| Final Drill Date: 1975-06-10
 
| Final Drill Date: 1975-06-10
 
|-
 
|-
| Well Total Depth: 1441.7 m
+
| Well Total Depth: 1441.70 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.265219
 
| Surface Hole Latitude: 52.265219
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1975-05-13
 +
| Obtained License
 +
|-
 +
| 1975-06-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1975-06-10
 +
| Finished Drilling
 +
|-
 +
| 1975-06-11
 +
| Production Casing Operation Performed
 +
|-
 +
| 1975-06-30
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1975-08-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1977-08-26
 +
| Perforation Treatment Performed - Chemical Squeeze
 +
|-
 +
| 1977-09-30
 +
| Well Began Injection
 +
|-
 +
| 1977-09-30
 +
| Well Fluid changed to Water
 +
|-
 +
| 1977-09-30
 +
| Well Type changed to Injection
 +
|-
 +
| 1993-06-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1993-06-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1993-06-03
 +
| Plug Back Performed
 +
|-
 +
| 1993-06-03
 +
| Well Fluid changed to Water
 +
|-
 +
| 1993-06-03
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1993-06-03
 +
| Well Type changed to Injection
 +
|-
 +
| 1994-11-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-10-26
 +
| Well Log Performed
 +
|-
 +
| 2006-10-27
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-10-27
 +
| Plug Back Performed
 +
|-
 +
| 2006-10-27
 +
| Well Log Performed
 +
|-
 +
| 2006-10-28
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-10-28
 +
| Well Log Performed
 +
|-
 +
| 2006-10-31
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2006-10-31
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-11-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-11-01
 +
| Well Log Performed
 +
|-
 +
| 2006-11-03
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2006-11-03
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2006-11-05
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-11-05
 +
| Well Log Performed
 +
|-
 +
| 2006-11-06
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2006-11-06
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2007-03-24
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 201:
 
| 1975-08-15
 
| 1975-08-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1416.1
+
| style="text-align: right;" | 1416.10
| style="text-align: right;" | 1417.9
+
| style="text-align: right;" | 1417.90
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1975-08-15
 
| 1975-08-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1419.8
+
| style="text-align: right;" | 1419.80
| style="text-align: right;" | 1421.9
+
| style="text-align: right;" | 1421.90
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1975-08-15
 
| 1975-08-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1422.8
+
| style="text-align: right;" | 1422.80
| style="text-align: right;" | 1424.9
+
| style="text-align: right;" | 1424.90
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
|-
 
|-
 
| 1977-08-26
 
| 1977-08-26
| Chemical Squeeze  
+
| Chemical Squeeze
| style="text-align: right;" | 1416.1
+
| style="text-align: right;" | 1416.10
| style="text-align: right;" | 1424.9
+
| style="text-align: right;" | 1424.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-06-03
 
| 1993-06-03
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1391.8
+
| style="text-align: right;" | 1391.80
| style="text-align: right;" | 1399.8
+
| style="text-align: right;" | 1399.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1993-06-03
 
| 1993-06-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1275
+
| style="text-align: right;" | 1275.00
| style="text-align: right;" | 1277
+
| style="text-align: right;" | 1277.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1993-06-03
 
| 1993-06-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 825.5
+
| style="text-align: right;" | 825.50
| style="text-align: right;" | 827.5
+
| style="text-align: right;" | 827.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1994-11-02
 
| 1994-11-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 743.7
+
| style="text-align: right;" | 743.70
| style="text-align: right;" | 745.7
+
| style="text-align: right;" | 745.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2006-10-27
 
| 2006-10-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1262
+
| style="text-align: right;" | 1262.00
| style="text-align: right;" | 1270
+
| style="text-align: right;" | 1270.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-10-27
 
| 2006-10-27
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 727
+
| style="text-align: right;" | 727.00
| style="text-align: right;" | 735
+
| style="text-align: right;" | 735.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-10-28
 
| 2006-10-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 556.5
+
| style="text-align: right;" | 556.50
| style="text-align: right;" | 557.5
+
| style="text-align: right;" | 557.50
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-10-28
 
| 2006-10-28
 
| Perforation
 
| Perforation
| style="text-align: right;" | 503
+
| style="text-align: right;" | 503.00
| style="text-align: right;" | 504
+
| style="text-align: right;" | 504.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-10-31
 
| 2006-10-31
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 503
+
| style="text-align: right;" | 503.00
| style="text-align: right;" | 557.5
+
| style="text-align: right;" | 557.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-10-31
 
| 2006-10-31
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 453
+
| style="text-align: right;" | 453.00
| style="text-align: right;" | 525.5
+
| style="text-align: right;" | 525.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-01
 
| 2006-11-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 405.5
+
| style="text-align: right;" | 405.50
| style="text-align: right;" | 406.5
+
| style="text-align: right;" | 406.50
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-11-01
 
| 2006-11-01
 
| Perforation
 
| Perforation
| style="text-align: right;" | 393
+
| style="text-align: right;" | 393.00
| style="text-align: right;" | 394
+
| style="text-align: right;" | 394.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-11-03
 
| 2006-11-03
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 393
+
| style="text-align: right;" | 393.00
| style="text-align: right;" | 406.5
+
| style="text-align: right;" | 406.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-03
 
| 2006-11-03
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 237.8
+
| style="text-align: right;" | 237.80
| style="text-align: right;" | 453
+
| style="text-align: right;" | 453.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-05
 
| 2006-11-05
 
| Perforation
 
| Perforation
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
| style="text-align: right;" | 229
+
| style="text-align: right;" | 229.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2006-11-06
 
| 2006-11-06
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 228
+
| style="text-align: right;" | 228.00
| style="text-align: right;" | 229
+
| style="text-align: right;" | 229.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006-11-06
 
| 2006-11-06
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 156
+
| style="text-align: right;" | 156.00
| style="text-align: right;" | 237.8
+
| style="text-align: right;" | 237.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 202: Line 329:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 237: Line 378:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 6437.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1978
 
| 1978
Line 243: Line 384:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 47387.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1979
 
| 1979
Line 249: Line 390:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 92554.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1980
 
| 1980
Line 255: Line 396:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 79575.5
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1981
 
| 1981
Line 261: Line 402:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 86620.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1982
 
| 1982
Line 267: Line 408:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 37799.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1983
 
| 1983
Line 273: Line 414:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 4366.4
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1984
 
| 1984
Line 279: Line 420:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 6743.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1985
 
| 1985
Line 285: Line 426:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 23801.6
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1986
 
| 1986
Line 291: Line 432:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 15382.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1987
 
| 1987
Line 297: Line 438:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 26610.7
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1988
 
| 1988
Line 303: Line 444:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 28914.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1989
 
| 1989
Line 309: Line 450:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 17808.9
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1990
 
| 1990
Line 315: Line 456:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 23950.2
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1991
 
| 1991
Line 321: Line 462:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 9595.0
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
| 1992
 
| 1992
Line 327: Line 468:
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 2545.8
+
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 333: Line 474:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 13:41, 9 July 2020

Well Details

Well ID: 0384251406000
Loading map...
Location: 00/06-14-038-25W4/0
Location Alias: 00/06-14-38-25 W4M
Location Alias 2: 00/06-14-038-25 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 25
Section: 14
County/Municipality: Lacombe County
Well Name: NAL JOFFRE 6-14-38-25
Operator Name: NAL Resources Limited
License Number: 0053564
License Date: 1975-05-13
License Status: Abandoned
Spud Date: 1975-06-04
Final Drill Date: 1975-06-10
Well Total Depth: 1441.70 m
Surface Hole Latitude: 52.265219
Surface Hole Longitude: -113.472632

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-05-13 Obtained License
1975-06-09 Drill Stem Test Performed
1975-06-10 Finished Drilling
1975-06-11 Production Casing Operation Performed
1975-06-30 Well Mode changed to Drilled and Cased
1975-08-15 Perforation Treatment Performed - Jet Perforation
1977-08-26 Perforation Treatment Performed - Chemical Squeeze
1977-09-30 Well Began Injection
1977-09-30 Well Fluid changed to Water
1977-09-30 Well Type changed to Injection
1993-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-03 Perforation Treatment Performed - Jet Perforation
1993-06-03 Plug Back Performed
1993-06-03 Well Fluid changed to Water
1993-06-03 Well Mode changed to Abandoned Zone
1993-06-03 Well Type changed to Injection
1994-11-02 Perforation Treatment Performed - Jet Perforation
2006-10-26 Well Log Performed
2006-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-27 Plug Back Performed
2006-10-27 Well Log Performed
2006-10-28 Perforation Treatment Performed - Jet Perforation
2006-10-28 Well Log Performed
2006-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-31 Perforation Treatment Performed - Remedial Casing
2006-11-01 Perforation Treatment Performed - Jet Perforation
2006-11-01 Well Log Performed
2006-11-03 Perforation Treatment Performed - Cement Plug
2006-11-03 Perforation Treatment Performed - Remedial Casing
2006-11-05 Perforation Treatment Performed - Jet Perforation
2006-11-05 Well Log Performed
2006-11-06 Perforation Treatment Performed - Cement Plug
2006-11-06 Perforation Treatment Performed - Remedial Casing
2007-03-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-08-15 Perforation 1416.10 1417.90 7
1975-08-15 Perforation 1419.80 1421.90 7
1975-08-15 Perforation 1422.80 1424.90 7
1977-08-26 Chemical Squeeze 1416.10 1424.90 0
1993-06-03 Packing Device Capped w/Cement 1391.80 1399.80 0
1993-06-03 Perforation 1275.00 1277.00 13
1993-06-03 Perforation 825.50 827.50 13
1994-11-02 Perforation 743.70 745.70 13
2006-10-27 Packing Device Capped w/Cement 1262.00 1270.00 0
2006-10-27 Packing Device Capped w/Cement 727.00 735.00 0
2006-10-28 Perforation 556.50 557.50 20
2006-10-28 Perforation 503.00 504.00 20
2006-10-31 Remedial Casing Cementing 503.00 557.50 0
2006-10-31 Packing Device Capped w/Cement 453.00 525.50 0
2006-11-01 Perforation 405.50 406.50 20
2006-11-01 Perforation 393.00 394.00 20
2006-11-03 Remedial Casing Cementing 393.00 406.50 0
2006-11-03 Cement Plug 237.80 453.00 0
2006-11-05 Perforation 228.00 229.00 20
2006-11-06 Remedial Casing Cementing 228.00 229.00 0
2006-11-06 Cement Plug 156.00 237.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[5]

References