If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384170108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.237119,"lon":-112.295481,"icon":""}]} |
Location: 00/08-01-038-17W4/0 | |
Location Alias: 00/08-01-38-17 W4M | |
Location Alias 2: 00/08-01-038-17 W4/00 | |
Province: Alberta | |
County/Municipality: County of Stettler No. 6 | |
Well Name: LOGIC ENERGY HALKIRK 8-1-38-17 | |
Operator Name: | |
License Number: 0121858 | |
License Date: 1986-01-28 | |
License Status: Abandoned | |
Spud Date: 1986-02-05 | |
Final Drill Date: 1986-02-17 | |
Well Total Depth: 1431 m | |
Surface Hole Latitude: 52.237119 | |
Surface Hole Longitude: -112.295481 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-05-26 | Perforation | 1371 | 1373 | 13 |
1986-05-27 | Acid Treatment | 1371 | 1373 | 0 |
1986-06-25 | Packing Device Capped w/Cement | 1352 | 1360 | 0 |
1986-06-26 | Perforation | 1227.5 | 1231 | 13 |
2009-03-12 | Packing Device Capped w/Cement | 1215.3 | 1223.3 | 0 |
2011-06-10 | Cement Plug | 495.5 | 617 | 0 |
2011-06-13 | Perforation | 490 | 491 | 14 |
2011-06-14 | Remedial Casing Cementing | 490 | 491 | 0 |
2011-06-14 | Packing Device Capped w/Cement | 477 | 485 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 1874 | 45.4 | 0.0 | 1.7 |
1987 | 8328 | 149.7 | 0.0 | 1.4 |
1988 | 8256 | 149.5 | 0.0 | 12.9 |
1989 | 8096 | 105.8 | 0.0 | 2.1 |
1990 | 7057 | 60.6 | 0.0 | 2.4 |
1991 | 7875 | 145.8 | 0.0 | 2.7 |
1992 | 8374 | 152.7 | 0.0 | 2.5 |
1993 | 8476 | 138.9 | 0.0 | 0.3 |
1994 | 7875 | 85.3 | 0.0 | 9.5 |
1995 | 6246 | 45.2 | 0.0 | 6.4 |
1996 | 621 | 1.0 | 0.0 | 0.7 |
1997 | 24 | 0.1 | 0.0 | 0.0 |
For data sources see[4]