X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384030506B00

Well Details

Well ID: 0384030506B00
Loading map...
Location: B0/06-05-038-03W4/0
Location Alias: B0/06-05-38-03 W4M
Location Alias 2: B0/06-05-038-03 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 03
Section: 05
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 1B0 PROVOST 6-5-38-3
Operator Name: West Lake Energy Corp.
License Number: 0146485
License Date: 1990-11-23
License Status: Suspension
Spud Date: 1990-12-09
Final Drill Date: 1990-12-12
Well Total Depth: 904.00 m
Surface Hole Latitude: 52.234166
Surface Hole Longitude: -110.403790

For data sources see[1][2]

Well History

Date Event
1990-11-23 Obtained License
1990-12-10 Surface Casing Operation Performed
1990-12-11 Direction Drilling Operation Performed - Deviate
1990-12-12 Finished Drilling
1990-12-12 Well Log Performed
1990-12-12 Well Mode changed to Drilled and Cased
1990-12-13 Production Casing Operation Performed
1990-12-13 Rig Released
1990-12-14 Well Log Performed
1991-01-05 Well Log Performed
1991-01-17 Well Log Performed
1991-01-18 Well Began Production
1991-01-18 Well Fluid changed to Crude Oil
1991-01-18 Well Mode changed to Pumping
1991-07-17 Perforation Treatment Performed - Jet Perforation
1998-05-29 Well Log Performed
1998-06-09 Well Log Performed
1998-07-20 Well Began Injection
1998-07-20 Well Fluid changed to Water
1998-07-20 Well Type changed to Disposal
2012-03-28 Perforation Treatment Performed - Jet Perforation
2012-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-21 Plug Back Performed
2012-07-21 Well Fluid changed to Water
2012-07-21 Well Mode changed to Abandoned Zone
2012-07-21 Well Type changed to Disposal
2012-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-22 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-12-11 220.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-07-17 Perforation 868.50 872.50 13
2012-03-28 Perforation 872.50 882.50 20
2012-07-21 Packing Device Capped w/Cement 845.00 853.00 0
2012-07-21 Packing Device Capped w/Cement 479.00 487.00 0
2012-07-22 Packing Device Capped w/Cement 313.00 321.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 7079 0.0 0.0 0.0
1992 8589 0.0 0.0 0.0
1993 8447 0.0 0.0 0.0
1994 7246 0.0 0.0 0.0
1995 8641 0.0 0.0 0.0
1996 7987 0.0 0.0 0.0
1997 7803 0.0 0.0 0.0
1998 420 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-31 No Incident Encountered 0.00 0.00
2012-07-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References