If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0384013212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.310773,"lon":-110.119508,"icon":""}]} |
Location: 00/12-32-038-01W4/0 | |
Location Alias: 00/12-32-38-01 W4M | |
Location Alias 2: 00/12-32-038-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 038 | |
Meridian: 4 | |
Range: 01 | |
Section: 32 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 12-32-38-1 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0364944 | |
License Date: 2006-10-25 | |
License Status: Suspension | |
Spud Date: 2006-11-19 | |
Final Drill Date: 2006-11-21 | |
Well Total Depth: 822.00 m | |
Surface Hole Latitude: 52.310773 | |
Surface Hole Longitude: -110.119508 |
Date | Event |
---|---|
2006-10-25 | Obtained License |
2006-11-20 | Surface Casing Operation Performed |
2006-11-21 | Finished Drilling |
2006-11-21 | Well Mode changed to Drilled and Cased |
2006-11-22 | Well Log Performed |
2006-11-23 | Production Casing Operation Performed |
2006-11-23 | Rig Released |
2007-05-27 | Perforation Treatment Performed - Jet Perforation |
2007-05-27 | Well Log Performed |
2007-06-01 | Well Began Production |
2007-06-01 | Well Fluid changed to Crude Oil |
2007-06-01 | Well Mode changed to Pumping |
2013-07-03 | Well Fluid changed to Crude Oil |
2013-07-03 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-05-27 | Perforation | 730.00 | 734.00 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 4579 | 0.0 | 0.0 | 0.0 |
2008 | 7211 | 0.0 | 0.0 | 0.0 |
2009 | 1584 | 0.0 | 0.0 | 0.0 |
2010 | 4834 | 0.0 | 0.0 | 0.0 |
2011 | 7760 | 0.0 | 0.0 | 0.0 |
2012 | 3787 | 0.0 | 0.0 | 0.0 |
2013 | 1134 | 0.0 | 0.0 | 0.0 |
For data sources see[5]