X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374222913000

Well Details

Well ID: 0374222913000
Loading map...
Location: 00/13-29-037-22W4/0
Location Alias: 00/13-29-37-22 W4M
Location Alias 2: 00/13-29-037-22 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 22
Section: 29
County/Municipality: Red Deer County
Well Name: KAISER MIKWAN 13-29-37-22
Operator Name: Obsidian Energy Ltd.
License Number: 0073630
License Date: 1978-12-22
License Status: Suspension
Spud Date: 1979-01-25
Final Drill Date: 1979-02-02
Well Total Depth: 1531.00 m
Surface Hole Latitude: 52.212886
Surface Hole Longitude: -113.118929

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-22 Obtained License
1979-01-31 Lost Circulation Occurred
1979-02-02 Finished Drilling
1979-02-03 Drill Stem Test Performed
1979-02-03 Well Log Performed
1979-02-04 Drill Stem Test Performed
1979-02-05 Production Casing Operation Performed
1979-02-26 Perforation Treatment Performed - Jet Perforation
1979-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-08 Perforation Treatment Performed - Jet Perforation
1979-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-21 Perforation Treatment Performed - Fractured
1979-09-03 Well Mode changed to Drilled and Cased
1983-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-01 Well Began Production
1986-12-01 Well Fluid changed to Gas
1986-12-01 Well Mode changed to Flowing
2017-12-01 Well Fluid changed to Gas
2017-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-26 Perforation 1492.50 1494.00 10
1979-02-27 Acid Treatment 1492.50 1494.00 0
1979-03-08 Perforation 1475.50 1476.50 7
1979-03-08 Perforation 1481.50 1482.50 7
1979-03-09 Acid Treatment 1475.50 1482.50 0
1979-07-21 Fracture 1475.50 1482.50 0
1983-11-28 Packing Device Capped w/Cement 1493.20 1495.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4300 0.0 0.0 0.0
1988 2058 0.0 0.0 0.0
1989 8415 0.0 0.0 0.0
1990 7913 0.0 0.0 0.0
1991 8445 0.0 0.0 0.0
1992 8449 0.0 0.0 0.0
1993 8368 0.0 0.0 0.0
1994 8103 0.0 0.0 0.0
1995 8398 0.0 0.0 0.0
1996 7464 0.0 0.0 0.0
1997 7160 0.0 0.0 0.0
1998 7124 0.0 0.0 0.0
1999 7978 0.0 0.0 0.0
2000 7663 0.0 0.0 0.0
2001 7319 0.0 0.0 0.0
2002 8507 0.0 0.0 0.0
2003 8187 0.0 0.0 0.0
2004 7752 0.0 0.0 0.0
2005 7500 0.0 0.0 0.0
2006 7574 0.0 0.0 0.0
2007 8458 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8486 0.0 0.0 0.0
2010 8661 0.0 0.0 0.0
2011 8640 0.0 0.0 0.0
2012 8358 0.0 0.0 0.0
2013 8317 0.0 0.0 0.0
2014 8647 0.0 0.0 0.0
2015 8544 0.0 0.0 0.0
2016 697 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-01-31 Lost Circulation 1472.00 1472.00

For data sources see[6]

References