X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365031804020

Well Details

Well ID: 0365031804020
Loading map...
Location: 02/04-18-036-03W5/0
Location Alias: 02/04-18-36-03 W5M
Location Alias 2: 02/04-18-036-03 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 18
County/Municipality: Red Deer County
Well Name: KEYERA LANAWAY 4-18-36-3
Operator Name: Keyera Energy Ltd.
License Number: 0105623
License Date: 1984-02-01
License Status: Abandoned
Spud Date: 1984-02-07
Final Drill Date: 1984-03-18
Well Total Depth: 3154.00 m
Surface Hole Latitude: 52.089385
Surface Hole Longitude: -114.426297

For data sources see[1][2]

Well History

Date Event
1984-02-01 Obtained License
1984-02-07 Direction Drilling Operation Performed - 98
1984-03-13 Well Log Performed
1984-03-18 Finished Drilling
1984-03-19 Well Log Performed
1984-04-03 Lost Circulation Occurred
1984-04-03 Production Casing Operation Performed
1984-07-17 Well Log Performed
1984-07-18 Perforation Treatment Performed - Jet Perforation
1984-07-18 Well Log Performed
1984-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-22 Well Log Performed
1984-07-24 Perforation Treatment Performed - Cement Squeeze
1984-07-24 Well Log Performed
1984-07-25 Perforation Treatment Performed - Jet Perforation
1984-07-26 Perforation Treatment Performed - Cement Squeeze
1984-07-27 Perforation Treatment Performed - Jet Perforation
1984-07-28 Perforation Treatment Performed - Cement Squeeze
1984-07-30 Well Log Performed
1984-07-31 Perforation Treatment Performed - Jet Perforation
1984-08-06 Well Log Performed
1984-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-17 Perforation Treatment Performed - Cement Plug
1984-08-17 Well Log Performed
1984-08-18 Perforation Treatment Performed - Cement Squeeze
1984-08-28 Well Log Performed
1984-08-29 Perforation Treatment Performed - Jet Perforation
1984-08-30 Perforation Treatment Performed - Cement Squeeze
1984-08-31 Perforation Treatment Performed - Cement Squeeze
1984-09-01 Well Log Performed
1984-09-02 Perforation Treatment Performed - Jet Perforation
1984-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-19 Perforation Treatment Performed - Cement Squeeze
1984-09-20 Well Log Performed
1984-09-21 Perforation Treatment Performed - Jet Perforation
1984-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-29 Well Log Performed
1984-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-30 Perforation Treatment Performed - Jet Perforation
1984-09-30 Well Mode changed to Drilled and Cased
1984-10-01 Perforation Treatment Performed - Cement Squeeze
1984-10-01 Well Log Performed
1984-10-02 Perforation Treatment Performed - Cement Squeeze
1984-10-02 Perforation Treatment Performed - Jet Perforation
1984-10-04 Perforation Treatment Performed - Cement Squeeze
1984-10-04 Well Log Performed
1994-11-26 Well Log Performed
1995-02-08 Well Log Performed
1995-02-08 Well Mode changed to Abandoned and Whipstocked
1998-12-04 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-02-07 2640.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-18 Perforation 2974.00 2977.00 13
1984-08-14 Acid Treatment 2952.00 2961.00 0
1984-08-17 Cement Plug 2847.00 2937.00 0
1984-08-18 Cement Squeeze 2952.00 2966.00 0
1984-08-29 Perforation 2835.00 2835.50 13
1984-08-29 Perforation 2874.00 2874.50 13
1984-08-30 Cement Squeeze 2835.00 2874.50 0
1984-08-31 Cement Squeeze 2835.00 2874.50 0
1984-09-02 Perforation 2847.00 2849.00 13
1984-09-02 Perforation 2852.00 2854.00 13
1984-09-02 Perforation 2859.50 2861.50 13
1984-07-20 Acid Treatment 2974.00 2977.00 0
1984-09-02 Perforation 2863.50 2867.50 13
1984-09-03 Acid Treatment 2847.00 2867.50 0
1984-09-19 Cement Squeeze 2847.00 2867.50 0
1984-09-21 Perforation 2847.00 2849.00 13
1984-09-21 Perforation 2852.00 2854.00 13
1984-09-23 Acid Treatment 2847.00 2854.00 0
1984-09-30 Packing Device Capped w/Cement 2823.00 2831.00 0
1984-09-30 Perforation 2620.00 2621.00 13
1984-09-30 Perforation 2629.00 2630.00 13
1984-10-01 Cement Squeeze 2620.00 2630.00 0
1984-07-24 Cement Squeeze 2974.00 2977.00 0
1984-10-02 Perforation 2090.00 2091.00 13
1984-10-02 Perforation 2350.00 2351.00 13
1984-10-02 Cement Squeeze 2090.00 2351.00 0
1984-10-04 Cement Squeeze 2090.00 2091.00 0
1984-07-25 Perforation 2914.50 2915.00 13
1984-07-25 Perforation 2965.50 2966.00 13
1984-07-26 Cement Squeeze 2914.50 2966.00 0
1984-07-27 Perforation 2932.50 2933.00 13
1984-07-28 Cement Squeeze 2914.50 2933.00 0
1984-07-31 Perforation 2952.00 2961.00 13

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-04-03 Lost Circulation 3154.00 3154.00

For data sources see[6]

References