If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364233314004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.14026,"lon":-113.236798,"icon":""}]} |
Location: 00/14-33-036-23W4/4 | |
Location Alias: 00/14-33-36-23 W4M | |
Location Alias 2: 00/14-33-036-23 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 23 | |
Section: 33 | |
County/Municipality: Red Deer County | |
Well Name: EMBER MIKWAN 14-33-36-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0403212 | |
License Date: 2008-11-03 | |
License Status: Issued | |
Spud Date: 2009-01-28 | |
Final Drill Date: 2009-01-29 | |
Well Total Depth: 876.00 m | |
Surface Hole Latitude: 52.140260 | |
Surface Hole Longitude: -113.236798 |
Date | Event |
---|---|
2008-11-03 | Obtained License |
2009-01-28 | Surface Casing Operation Performed |
2009-01-29 | Finished Drilling |
2009-01-29 | Well Mode changed to Drilled and Cased |
2009-01-30 | Production Casing Operation Performed |
2009-01-30 | Rig Released |
2009-02-04 | Well Log Performed |
2009-02-18 | Perforation Treatment Performed - Jet Perforation |
2009-02-19 | Perforation Treatment Performed - Fractured |
2011-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-06 | Plug Back Performed |
2011-01-07 | Well Log Performed |
2011-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-08 | Plug Back Performed |
2011-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-26 | Perforation Treatment Performed - Jet Perforation |
2011-03-26 | Plug Back Performed |
2011-03-27 | Perforation Treatment Performed - Fractured |
2011-07-26 | Well Began Production |
2011-07-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-07-26 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-18 | Perforation | 456.00 | 460.00 | 13 |
2009-02-19 | Fracture | 456.00 | 460.00 | 0 |
2009-02-19 | Fracture | 329.00 | 333.00 | 0 |
2009-02-19 | Fracture | 470.00 | 473.00 | 0 |
2009-02-19 | Fracture | 585.00 | 586.00 | 0 |
2009-02-19 | Fracture | 574.00 | 576.00 | 0 |
2009-02-19 | Fracture | 626.00 | 627.00 | 0 |
2011-01-06 | Packing Device Capped w/Cement | 812.00 | 820.00 | 0 |
2011-03-08 | Packing Device Capped w/Cement | 615.00 | 623.00 | 0 |
2011-03-26 | Perforation | 403.10 | 405.10 | 13 |
2011-03-26 | Perforation | 397.90 | 398.90 | 13 |
2009-02-18 | Perforation | 470.00 | 473.00 | 13 |
2011-03-26 | Perforation | 416.90 | 417.40 | 13 |
2011-03-26 | Perforation | 411.10 | 411.60 | 13 |
2011-03-26 | Perforation | 393.40 | 393.90 | 13 |
2011-03-26 | Perforation | 336.70 | 337.70 | 13 |
2011-03-26 | Perforation | 271.20 | 272.20 | 13 |
2011-03-26 | Perforation | 377.50 | 378.00 | 13 |
2011-03-26 | Perforation | 350.80 | 351.30 | 13 |
2011-03-26 | Perforation | 419.10 | 419.60 | 13 |
2011-03-26 | Perforation | 463.00 | 464.00 | 13 |
2011-03-26 | Perforation | 448.40 | 448.90 | 13 |
2009-02-18 | Perforation | 329.00 | 333.00 | 13 |
2011-03-26 | Packing Device Capped w/Cement | 562.00 | 570.00 | 0 |
2011-03-26 | Perforation | 466.20 | 467.70 | 13 |
2011-03-26 | Perforation | 436.10 | 436.60 | 13 |
2011-03-26 | Perforation | 430.20 | 430.70 | 13 |
2011-03-26 | Perforation | 443.50 | 445.00 | 13 |
2011-03-26 | Perforation | 439.30 | 439.80 | 13 |
2011-03-27 | Fracture | 271.20 | 467.70 | 0 |
2011-03-27 | Fracture | 329.00 | 473.00 | 0 |
2009-02-18 | Perforation | 386.00 | 389.00 | 13 |
2009-02-18 | Perforation | 574.00 | 576.00 | 13 |
2009-02-18 | Perforation | 585.00 | 586.00 | 13 |
2009-02-18 | Perforation | 828.00 | 831.00 | 20 |
2009-02-18 | Perforation | 626.00 | 627.00 | 13 |
2009-02-19 | Fracture | 386.00 | 389.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3816 | 0.0 | 0.0 | 0.0 |
2012 | 8780 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8708 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]