X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364053612030

Well Details

Well ID: 0364053612030
Loading map...
Location: 03/12-36-036-05W4/0
Location Alias: 03/12-36-36-05 W4M
Location Alias 2: 03/12-36-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 36
County/Municipality: Special Areas No. 4
Well Name: CRESCENT POINT PROVO 12-36-36-5
Operator Name: Surge Energy Inc.
License Number: 0196788
License Date: 1997-01-16
License Status: Abandoned
Spud Date: 1997-02-15
Final Drill Date: 1997-02-17
Well Total Depth: 864.00 m
Surface Hole Latitude: 52.136867
Surface Hole Longitude: -110.596402

For data sources see[1][2]

Well History

Date Event
1997-01-16 Obtained License
1997-02-16 Surface Casing Operation Performed
1997-02-17 Finished Drilling
1997-02-17 Well Mode changed to Drilled and Cased
1997-02-18 Production Casing Operation Performed
1997-02-18 Rig Released
1997-02-18 Well Log Performed
1997-02-26 Perforation Treatment Performed - Cement Squeeze
1997-03-17 Perforation Treatment Performed - Cement Squeeze
1997-03-17 Perforation Treatment Performed - Jet Perforation
1997-03-19 Perforation Treatment Performed - Jet Perforation
1997-03-24 Well Began Production
1997-03-24 Well Fluid changed to Crude Oil
1997-03-24 Well Mode changed to Pumping
2000-05-04 Well Fluid changed to Crude Oil
2000-05-04 Well Mode changed to Suspended
2000-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-30 Plug Back Performed
2000-06-30 Well Fluid changed to Crude Oil
2000-06-30 Well Mode changed to Abandoned Zone
2000-07-01 Perforation Treatment Performed - Jet Perforation
2017-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-05-31 Plug Back Performed
2017-07-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-26 Cement Squeeze 645.00 850.00 0
1997-03-17 Perforation 836.50 838.00 13
1997-03-17 Cement Squeeze 836.50 838.00 0
1997-03-19 Perforation 834.00 835.30 18
2000-06-30 Packing Device Capped w/Cement 833.00 836.00 0
2000-07-01 Perforation 822.00 825.00 17
2017-05-31 Packing Device Capped w/Cement 808.90 817.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6202 0.0 0.0 0.0
1998 7485 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References