X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0364053415020"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0364053415020
 
| Well ID: 0364053415020
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.1410867, -110.63306 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.141189, -110.647066 | width=100% | height=100% }}
 +
|-
 +
| Location: 02/15-34-036-05W4/0
 +
|-
 +
| Location Alias: 02/15-34-36-05 W4M
 +
|-
 +
| Location Alias 2: 02/15-34-036-05 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 036
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 05
 +
|-
 +
| Section: 34
 +
|-
 +
| County/Municipality: [[Special Areas No. 4,_Alberta|Special Areas No. 4]]
 
|-
 
|-
 
| Well Name: SURGE ENERGY 102 PROVOST 15-34-36-5
 
| Well Name: SURGE ENERGY 102 PROVOST 15-34-36-5
 
|-
 
|-
| Operator:
+
| Operator Name: [[Surge Energy Inc.]]
 +
|-
 +
| License Number: 0440569
 
|-
 
|-
 
| License Date: 2011-12-07
 
| License Date: 2011-12-07
 
|-
 
|-
| Final Drilling Date: 2012-06-03
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 2012-05-29
 +
|-
 +
| Final Drill Date: 2012-06-03
 +
|-
 +
| Well Total Depth: 1850.00 m
 +
|-
 +
| Surface Hole Latitude: 52.141189
 +
|-
 +
| Surface Hole Longitude: -110.647066
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-12-07
 +
| Obtained License
 +
|-
 +
| 2012-05-30
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-05-30
 +
| Well Log Performed
 +
|-
 +
| 2012-05-31
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-06-01
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-06-03
 +
| Finished Drilling
 +
|-
 +
| 2012-06-03
 +
| Well Log Performed
 +
|-
 +
| 2012-06-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-06-04
 +
| Production Casing Operation Performed
 +
|-
 +
| 2012-06-07
 +
| Rig Released
 +
|-
 +
| 2012-06-09
 +
| Well Log Performed
 +
|-
 +
| 2012-06-10
 +
| Well Log Performed
 +
|-
 +
| 2012-06-13
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-06-14
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-06-18
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2012-06-19
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2012-07-02
 +
| Well Began Production
 +
|-
 +
| 2012-07-02
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2012-07-02
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2013-11-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2013-11-01
 +
| Well Mode changed to Suspended
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-05-31
 +
| style="text-align: right;" | 540.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-06-01
 +
| style="text-align: right;" | 1009.90
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-06-13
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1796.70
 +
| style="text-align: right;" | 1796.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1334.50
 +
| style="text-align: right;" | 1334.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1282.30
 +
| style="text-align: right;" | 1282.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1230.60
 +
| style="text-align: right;" | 1230.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1178.40
 +
| style="text-align: right;" | 1178.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1126.20
 +
| style="text-align: right;" | 1126.30
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1850.0m
+
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1074.00
 +
| style="text-align: right;" | 1074.10
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2012-06-18
 +
| Perforation
 +
| style="text-align: right;" | 679.00
 +
| style="text-align: right;" | 679.50
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Status: Suspended
+
| 2012-06-18
 +
| Perforation
 +
| style="text-align: right;" | 531.00
 +
| style="text-align: right;" | 531.50
 +
| style="text-align: right;" | 14
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-06-19
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 531.00
 +
| style="text-align: right;" | 679.50
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 2012-06-13
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1751.90
 +
| style="text-align: right;" | 1752.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Violations:
+
| 2012-06-13
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1699.70
 +
| style="text-align: right;" | 1699.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 52.1410867
+
| 2012-06-13
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1647.50
 +
| style="text-align: right;" | 1647.60
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -110.63306
+
| 2012-06-13
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1595.40
 +
| style="text-align: right;" | 1595.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-13
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1543.20
 +
| style="text-align: right;" | 1543.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1491.00
 +
| style="text-align: right;" | 1491.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1438.70
 +
| style="text-align: right;" | 1438.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-06-14
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 1386.80
 +
| style="text-align: right;" | 1386.90
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 1367
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-06-07
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2012-07-01
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:39, 17 January 2021

Well Details

Well ID: 0364053415020
Loading map...
Location: 02/15-34-036-05W4/0
Location Alias: 02/15-34-36-05 W4M
Location Alias 2: 02/15-34-036-05 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 05
Section: 34
County/Municipality: Special Areas No. 4
Well Name: SURGE ENERGY 102 PROVOST 15-34-36-5
Operator Name: Surge Energy Inc.
License Number: 0440569
License Date: 2011-12-07
License Status: Suspension
Spud Date: 2012-05-29
Final Drill Date: 2012-06-03
Well Total Depth: 1850.00 m
Surface Hole Latitude: 52.141189
Surface Hole Longitude: -110.647066

For data sources see[1][2]

Well History

Date Event
2011-12-07 Obtained License
2012-05-30 Surface Casing Operation Performed
2012-05-30 Well Log Performed
2012-05-31 Direction Drilling Operation Performed - Deviate
2012-06-01 Direction Drilling Operation Performed - Horizontal
2012-06-03 Finished Drilling
2012-06-03 Well Log Performed
2012-06-03 Well Mode changed to Drilled and Cased
2012-06-04 Production Casing Operation Performed
2012-06-07 Rig Released
2012-06-09 Well Log Performed
2012-06-10 Well Log Performed
2012-06-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-18 Perforation Treatment Performed - Jet Perforation
2012-06-19 Perforation Treatment Performed - Remedial Casing
2012-07-02 Well Began Production
2012-07-02 Well Fluid changed to Crude Oil
2012-07-02 Well Mode changed to Pumping
2013-11-01 Well Fluid changed to Crude Oil
2013-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-05-31 540.00 Deviate (5 - 79 degrees)
2012-06-01 1009.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-13 Multi-Stage Fracture 1796.70 1796.80 0
2012-06-14 Multi-Stage Fracture 1334.50 1334.60 0
2012-06-14 Multi-Stage Fracture 1282.30 1282.40 0
2012-06-14 Multi-Stage Fracture 1230.60 1230.70 0
2012-06-14 Multi-Stage Fracture 1178.40 1178.50 0
2012-06-14 Multi-Stage Fracture 1126.20 1126.30 0
2012-06-14 Multi-Stage Fracture 1074.00 1074.10 0
2012-06-18 Perforation 679.00 679.50 14
2012-06-18 Perforation 531.00 531.50 14
2012-06-19 Remedial Casing Cementing 531.00 679.50 0
2012-06-13 Multi-Stage Fracture 1751.90 1752.00 0
2012-06-13 Multi-Stage Fracture 1699.70 1699.80 0
2012-06-13 Multi-Stage Fracture 1647.50 1647.60 0
2012-06-13 Multi-Stage Fracture 1595.40 1595.50 0
2012-06-13 Multi-Stage Fracture 1543.20 1543.30 0
2012-06-14 Multi-Stage Fracture 1491.00 1491.10 0
2012-06-14 Multi-Stage Fracture 1438.70 1438.80 0
2012-06-14 Multi-Stage Fracture 1386.80 1386.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1367 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-07 No Incident Encountered 0.00 0.00
2012-07-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References