X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364041916000

Well Details

Well ID: 0364041916000
Loading map...
Location: 00/16-19-036-04W4/0
Location Alias: 00/16-19-36-04 W4M
Location Alias 2: 00/16-19-036-04 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 04
Section: 19
County/Municipality: Special Areas No. 4
Well Name: SURGE ENERGY HZ PROVOST 16-19-36-4
Operator Name: Surge Energy Inc.
License Number: 0496659
License Date: 2019-11-27
License Status: Amended
Spud Date: 2020-01-11
Final Drill Date: 2020-01-27
Well Total Depth: 2458.00 m
Surface Hole Latitude: 52.110407
Surface Hole Longitude: -110.580499

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-24 Savanna Drilling Corp. 431 Resumption

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-24 507.90 Deviate (5 - 79 degrees)
2020-01-25 964.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-11 Multi-Stage Fracture 2424.50 2424.60 0
2020-02-11 Multi-Stage Fracture 2369.20 2369.30 0
2020-02-11 Multi-Stage Fracture 2314.80 2314.90 0
2020-02-11 Multi-Stage Fracture 2259.90 2260.00 0
2020-02-11 Multi-Stage Fracture 2206.70 2206.80 0
2020-02-11 Multi-Stage Fracture 2151.90 2152.00 0
2020-02-12 Multi-Stage Fracture 2096.90 2097.00 0
2020-02-12 Multi-Stage Fracture 2041.90 2042.00 0
2020-02-12 Multi-Stage Fracture 1986.60 1986.70 0
2020-02-12 Multi-Stage Fracture 1931.40 1931.50 0
2020-02-12 Multi-Stage Fracture 1876.60 1876.70 0
2020-02-12 Multi-Stage Fracture 1821.40 1821.50 0
2020-02-12 Multi-Stage Fracture 1766.50 1766.60 0
2020-02-12 Multi-Stage Fracture 1711.30 1711.40 0
2020-02-12 Multi-Stage Fracture 1656.20 1656.30 0
2020-02-12 Multi-Stage Fracture 1601.40 1601.50 0
2020-02-12 Multi-Stage Fracture 1546.40 1546.50 0
2020-02-12 Multi-Stage Fracture 1491.10 1491.20 0
2020-02-12 Multi-Stage Fracture 1436.80 1436.90 0
2020-02-12 Multi-Stage Fracture 1383.00 1383.10 0
2020-02-12 Multi-Stage Fracture 1327.70 1327.80 0
2020-02-12 Multi-Stage Fracture 1272.00 1272.10 0
2020-02-12 Multi-Stage Fracture 1217.10 1217.20 0
2020-02-12 Multi-Stage Fracture 1162.40 1162.50 0
2020-02-12 Multi-Stage Fracture 1107.30 1107.40 0
2020-02-12 Multi-Stage Fracture 1066.30 1066.40 0
2020-02-12 Multi-Stage Fracture 1024.90 1025.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 923 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-29 No Incident Encountered 0.00 0.00
2020-02-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References