X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364041905C02

Well Details

Well ID: 0364041905C02
Loading map...
Location: C0/05-19-036-04W4/2
Location Alias: C0/05-19-36-04 W4M
Location Alias 2: C0/05-19-036-04 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 04
Section: 19
County/Municipality: Special Areas No. 4
Well Name: 935247 ET AL PROVO 5-19-36-4
Operator Name: Surge Energy Inc.
License Number: 0148217
License Date: 1991-03-01
License Status: Issued
Spud Date: 1991-10-03
Final Drill Date: 1991-10-05
Well Total Depth: 880.00 m
Surface Hole Latitude: 52.105576
Surface Hole Longitude: -110.574800

For data sources see[1][2]

Well History

Date Event
1991-03-01 Obtained License
1991-10-04 Surface Casing Operation Performed
1991-10-05 Finished Drilling
1991-10-05 Well Log Performed
1991-10-05 Well Mode changed to Drilled and Cased
1991-10-06 Production Casing Operation Performed
1991-10-06 Rig Released
1991-10-15 Perforation Treatment Performed - Jet Perforation
1991-10-15 Well Log Performed
2001-12-08 Perforation Treatment Performed - Jet Perforation
2001-12-12 Well Began Production
2001-12-12 Well Fluid changed to Crude Oil
2001-12-12 Well Mode changed to Pumping
2010-08-31 Well Fluid changed to Crude Oil
2010-08-31 Well Mode changed to Suspended
2011-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-18 Plug Back Performed
2011-05-18 Well Fluid changed to Crude Oil
2011-05-18 Well Log Performed
2011-05-18 Well Mode changed to Abandoned Zone
2011-05-19 Perforation Treatment Performed - Jet Perforation
2011-05-19 Well Log Performed
2011-05-28 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-10-15 Perforation 857.50 858.50 19
2001-12-08 Perforation 846.00 848.00 17
2011-05-18 Packing Device Capped w/Cement 846.10 854.10 0
2011-05-18 Packing Device Capped w/Cement 832.00 840.00 0
2011-05-19 Perforation 800.00 801.50 17
2011-05-19 Perforation 806.00 807.00 17
2011-05-19 Perforation 809.00 810.50 17
2011-05-19 Perforation 814.00 815.00 17
2011-05-28 Multi-Stage Fracture 800.00 815.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 532 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8651 0.0 0.0 0.0
2004 8331 0.0 0.0 0.0
2005 3827 0.0 0.0 0.0

For data sources see[5]

References