X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355072811000

Well Details

Well ID: 0355072811000
Loading map...
Location: 00/11-28-035-07W5/0
Location Alias: 00/11-28-35-07 W5M
Location Alias 2: 00/11-28-035-07 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 28
County/Municipality: Clearwater County
Well Name: SHININGBANK ETAL CAROLINE 11-28-35-7
Operator Name: TAQA North Ltd.
License Number: 0055872
License Date: 1975-11-20
License Status: Issued
Spud Date: 1975-11-23
Final Drill Date: 1976-01-28
Well Total Depth: 2849.90 m
Surface Hole Latitude: 52.038099
Surface Hole Longitude: -114.946097

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-20 Obtained License
1975-12-07 Lost Circulation Occurred
1975-12-21 Kick Occurred
1976-01-26 Drill Stem Test Performed
1976-01-28 Finished Drilling
1976-01-28 Well Mode changed to Drilled and Cased
1976-01-29 Drill Stem Test Performed
1976-01-30 Liner Casing Operation Performed
1976-03-03 Perforation Treatment Performed - Jet Perforation
1976-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-06 Perforation Treatment Performed - Fractured
1976-03-16 Well Began Production
1976-03-16 Well Fluid changed to Crude Oil
1976-03-16 Well Mode changed to Flowing
1976-07-21 Perforation Treatment Performed - Jet Perforation
1976-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-23 Well Fluid changed to Crude Oil
1976-07-23 Well Mode changed to Flowing
1976-08-19 Perforation Treatment Performed - Cement Squeeze
1976-09-12 Perforation Treatment Performed - Jet Perforation
1976-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-17 Well Fluid changed to Crude Oil
1976-10-17 Well Mode changed to Pumping
1977-11-01 Well Fluid changed to Crude Oil
1977-11-01 Well Mode changed to Suspended
1984-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-02-01 Plug Back Performed
1984-02-01 Well Fluid changed to Crude Oil
1984-02-01 Well Mode changed to Abandoned Zone
1989-07-31 Well Log Performed
1989-08-01 Well Log Performed
1989-08-09 Perforation Treatment Performed - Jet Perforation
1989-08-09 Well Log Performed
1989-08-10 Perforation Treatment Performed - Fractured
1989-08-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-03 Perforation 2819.40 2820.60 7
1984-02-01 Packing Device Capped w/Cement 2563.00 2563.00 0
1989-08-09 Perforation 2541.40 2545.80 16
1989-08-10 Fracture 2541.40 2545.80 0
1976-03-03 Perforation 2821.20 2825.50 7
1976-03-05 Acid Treatment 2819.40 2825.50 0
1976-03-06 Fracture 2819.40 2825.50 0
1976-07-21 Perforation 2541.40 2545.10 7
1976-07-22 Acid Treatment 2541.40 2545.10 0
1976-08-19 Cement Squeeze 2541.40 2545.10 0
1976-09-12 Perforation 2541.40 2545.10 7
1976-09-13 Acid Treatment 2541.40 2545.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3305 0.0 0.0 0.0
1977 4162 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-12-07 Lost Circulation 1774.00 1846.50
1975-12-21 Kick 2011.70 2011.70

For data sources see[6]

References