X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354262916000

Well Details

Well ID: 0354262916000
Loading map...
Location: 00/16-29-035-26W4/0
Location Alias: 00/16-29-35-26 W4M
Location Alias 2: 00/16-29-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 29
County/Municipality: Red Deer County
Well Name: Vantage THREEHCK 16-29-35-26
Operator Name: Vantage Point Resources Inc.
License Number: 0112101
License Date: 1984-12-28
License Status: Suspension
Spud Date: 1985-01-03
Final Drill Date: 1985-01-11
Well Total Depth: 1880.00 m
Surface Hole Latitude: 52.037956
Surface Hole Longitude: -113.676592

For data sources see[1][2]

Well History

Date Event
1984-12-28 Obtained License
1985-01-04 Lost Circulation Occurred
1985-01-04 Surface Casing Operation Performed
1985-01-11 Finished Drilling
1985-01-11 Well Log Performed
1985-01-13 Drill Stem Test Performed
1985-01-14 Drill Stem Test Performed
1985-01-15 Drill Stem Test Performed
1985-01-16 Drill Stem Test Performed
1985-01-17 Drill Stem Test Performed
1985-01-18 Drill Stem Test Performed
1985-01-19 Production Casing Operation Performed
1985-01-19 Rig Released
1985-01-19 Well Mode changed to Drilled and Cased
1985-08-07 Well Log Performed
1985-08-09 Perforation Treatment Performed - Jet Perforation
1985-08-09 Well Log Performed
1985-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-12 Perforation Treatment Performed - Jet Perforation
1985-08-12 Well Log Performed
1985-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-15 Perforation Treatment Performed - Jet Perforation
1985-08-15 Well Log Performed
1985-10-19 Perforation Treatment Performed - Fractured
1989-06-01 Well Began Production
1989-06-01 Well Fluid changed to Gas
1989-06-01 Well Mode changed to Flowing
2012-06-15 Well Fluid changed to Gas
2012-06-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-09 Perforation 1814.00 1816.00 13
1985-08-10 Acid Treatment 1814.00 1816.00 0
1985-08-12 Packing Device Capped w/Cement 1802.00 1810.00 0
1985-08-12 Perforation 1039.50 1042.00 13
1985-08-14 Acid Treatment 1039.50 1042.00 0
1985-08-15 Packing Device Capped w/Cement 1029.00 1037.00 0
1985-08-15 Perforation 1000.50 1005.50 13
1985-10-19 Fracture 1000.50 1005.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 4110 0.0 0.0 0.0
1990 5123 0.0 0.0 0.0
1991 4817 0.0 0.0 0.0
1992 5497 0.0 0.0 0.0
1993 5325 0.0 0.0 0.0
1994 4244 0.0 0.0 0.0
1995 4685 0.0 0.0 0.0
1996 5465 0.0 0.0 0.0
1997 3665 0.0 0.0 0.0
1998 5831 0.0 0.0 0.0
2002 7133 0.0 0.0 0.0
2003 5020 0.0 0.0 0.0
2004 7410 0.0 0.0 0.0
2005 6861 0.0 0.0 0.0
2006 7486 0.0 0.0 0.0
2007 8591 0.0 0.0 0.0
2008 7602 0.0 0.0 0.0
2009 8085 0.0 0.0 0.0
2010 8567 0.0 0.0 0.0
2011 8544 0.0 0.0 0.0
2012 2543 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-01-04 Lost Circulation 20.00 20.00

For data sources see[6]

References