X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0354250911002"

m
m
 
Line 201: Line 201:
 
| style="text-align: right;" | 1726.10
 
| style="text-align: right;" | 1726.10
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1977-06-09
 
| Perforation
 
| style="text-align: right;" | 1733.10
 
| style="text-align: right;" | 1735.20
 
| style="text-align: right;" | 7
 
|-
 
| 1977-06-09
 
| Perforation
 
| style="text-align: right;" | 1737.70
 
| style="text-align: right;" | 1742.50
 
| style="text-align: right;" | 7
 
|-
 
| 1977-06-09
 
| Perforation
 
| style="text-align: right;" | 1748.00
 
| style="text-align: right;" | 1748.90
 
| style="text-align: right;" | 7
 
|-
 
| 1977-06-10
 
| Acid Treatment
 
| style="text-align: right;" | 1724.30
 
| style="text-align: right;" | 1748.90
 
| style="text-align: right;" | 0
 
|-
 
| 1986-07-17
 
| Acid Treatment
 
| style="text-align: right;" | 1724.30
 
| style="text-align: right;" | 1748.90
 
| style="text-align: right;" | 0
 
|-
 
| 1986-07-27
 
| Perforation
 
| style="text-align: right;" | 1755.00
 
| style="text-align: right;" | 1756.00
 
| style="text-align: right;" | 6
 
|-
 
| 1986-07-28
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 1755.00
 
| style="text-align: right;" | 1756.00
 
| style="text-align: right;" | 0
 
|-
 
| 1986-07-29
 
| Perforation
 
| style="text-align: right;" | 1713.00
 
| style="text-align: right;" | 1714.00
 
| style="text-align: right;" | 6
 
 
|-
 
|-
 
| 1986-07-29
 
| 1986-07-29
Line 303: Line 255:
 
| style="text-align: right;" | 1735.20
 
| style="text-align: right;" | 1735.20
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1977-06-09
 +
| Perforation
 +
| style="text-align: right;" | 1733.10
 +
| style="text-align: right;" | 1735.20
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-06-09
 +
| Perforation
 +
| style="text-align: right;" | 1737.70
 +
| style="text-align: right;" | 1742.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-06-09
 +
| Perforation
 +
| style="text-align: right;" | 1748.00
 +
| style="text-align: right;" | 1748.90
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1977-06-10
 +
| Acid Treatment
 +
| style="text-align: right;" | 1724.30
 +
| style="text-align: right;" | 1748.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-07-17
 +
| Acid Treatment
 +
| style="text-align: right;" | 1724.30
 +
| style="text-align: right;" | 1748.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-07-27
 +
| Perforation
 +
| style="text-align: right;" | 1755.00
 +
| style="text-align: right;" | 1756.00
 +
| style="text-align: right;" | 6
 +
|-
 +
| 1986-07-28
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 1755.00
 +
| style="text-align: right;" | 1756.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1986-07-29
 +
| Perforation
 +
| style="text-align: right;" | 1713.00
 +
| style="text-align: right;" | 1714.00
 +
| style="text-align: right;" | 6
 
|-
 
|-
 
|}
 
|}
Line 420: Line 420:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 13:40, 31 January 2021

Well Details

Well ID: 0354250911002
Loading map...
Location: 00/11-09-035-25W4/2
Location Alias: 00/11-09-35-25 W4M
Location Alias 2: 00/11-09-035-25 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 25
Section: 09
County/Municipality: Red Deer County
Well Name: PINE CLIFF THREEHCK 11-9-35-25
Operator Name: Pine Cliff Energy Ltd.
License Number: 0063318
License Date: 1977-03-25
License Status: Issued
Spud Date: 1977-05-10
Final Drill Date: 1977-05-21
Well Total Depth: 1815.40 m
Surface Hole Latitude: 51.992768
Surface Hole Longitude: -113.521881

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-03-25 Obtained License
1977-05-21 Drill Stem Test Performed
1977-05-21 Finished Drilling
1977-05-21 Well Mode changed to Drilled and Cased
1977-05-22 Drill Stem Test Performed
1977-05-23 Production Casing Operation Performed
1977-06-09 Perforation Treatment Performed - Jet Perforation
1977-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-06 Well Log Performed
1986-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-24 Well Log Performed
1986-07-26 Well Log Performed
1986-07-27 Perforation Treatment Performed - Jet Perforation
1986-07-28 Perforation Treatment Performed - Remedial Casing
1986-07-29 Perforation Treatment Performed - Jet Perforation
1986-07-30 Perforation Treatment Performed - Remedial Casing
1986-08-03 Perforation Treatment Performed - Fractured
1998-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-28 Perforation Treatment Performed - Jet Perforation
1998-09-28 Plug Back Performed
1998-09-28 Well Log Performed
1998-09-30 Well Began Production
1998-09-30 Well Fluid changed to Gas
1998-09-30 Well Mode changed to Flowing
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Suspended
2001-08-01 Well Fluid changed to Gas
2001-08-01 Well Mode changed to Flowing
2009-03-26 Perforation Treatment Performed - Cement Squeeze
2009-03-26 Plug Back Performed
2009-03-26 Well Fluid changed to Gas
2009-03-26 Well Mode changed to Abandoned Zone
2009-03-31 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-09 Perforation 1724.30 1726.10 7
1986-07-29 Perforation 1709.00 1710.00 6
1986-07-30 Remedial Casing Cementing 1709.00 1714.00 0
1986-08-03 Fracture 1724.30 1748.90 0
1998-09-28 Packing Device Capped w/Cement 1697.00 1705.00 0
1998-09-28 Perforation 842.50 844.50 17
2009-03-26 Cement Squeeze 842.50 844.50 0
2009-03-31 Perforation 1737.70 1742.50 7
2009-03-31 Perforation 1724.30 1726.10 7
2009-03-31 Perforation 1733.10 1735.20 7
1977-06-09 Perforation 1733.10 1735.20 7
1977-06-09 Perforation 1737.70 1742.50 7
1977-06-09 Perforation 1748.00 1748.90 7
1977-06-10 Acid Treatment 1724.30 1748.90 0
1986-07-17 Acid Treatment 1724.30 1748.90 0
1986-07-27 Perforation 1755.00 1756.00 6
1986-07-28 Remedial Casing Cementing 1755.00 1756.00 0
1986-07-29 Perforation 1713.00 1714.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 1903 0.0 0.0 0.0
1999 722 0.0 0.0 0.0
2001 3400 0.0 0.0 0.0
2002 8382 0.0 0.0 0.0
2003 7855 0.0 0.0 0.0
2004 842 0.0 0.0 0.0
2005 5618 0.0 0.0 0.0
2006 8423 0.0 0.0 0.0

For data sources see[5]

References