If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354250908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.989458,"lon":-113.505531,"icon":""}]} |
Location: 00/08-09-035-25W4/0 | |
Location Alias: 00/08-09-35-25 W4M | |
Location Alias 2: 00/08-09-035-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 25 | |
Section: 09 | |
County/Municipality: Red Deer County | |
Well Name: CPC RESOURCES THREEHCK 8-9-35-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0325852 | |
License Date: 2005-02-07 | |
License Status: Issued | |
Spud Date: 2005-05-21 | |
Final Drill Date: 2005-05-22 | |
Well Total Depth: 713.00 m | |
Surface Hole Latitude: 51.989458 | |
Surface Hole Longitude: -113.505531 |
Date | Event |
---|---|
2005-02-07 | Obtained License |
2005-05-16 | Surface Casing Operation Performed |
2005-05-21 | Production Casing Operation Performed |
2005-05-22 | Finished Drilling |
2005-05-22 | Rig Released |
2005-05-22 | Well Mode changed to Drilled and Cased |
2005-05-30 | Well Log Performed |
2005-06-12 | Perforation Treatment Performed - Jet Perforation |
2005-06-20 | Perforation Treatment Performed - Fractured |
2005-06-22 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-06-22 | Well Mode changed to Testing |
2005-07-21 | Well Began Production |
2005-07-21 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-07-21 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-06-12 | Perforation | 657.00 | 658.00 | 13 |
2005-06-12 | Perforation | 578.10 | 579.10 | 13 |
2005-06-12 | Perforation | 575.50 | 577.50 | 13 |
2005-06-12 | Perforation | 559.80 | 560.80 | 13 |
2005-06-12 | Perforation | 556.00 | 557.00 | 13 |
2005-06-12 | Perforation | 550.30 | 551.30 | 13 |
2005-06-12 | Perforation | 543.00 | 544.00 | 13 |
2005-06-12 | Perforation | 543.00 | 544.00 | 13 |
2005-06-12 | Perforation | 520.60 | 521.60 | 13 |
2005-06-12 | Perforation | 509.60 | 510.60 | 13 |
2005-06-12 | Perforation | 500.00 | 501.00 | 13 |
2005-06-12 | Perforation | 652.30 | 654.30 | 13 |
2005-06-12 | Perforation | 497.50 | 498.50 | 13 |
2005-06-12 | Perforation | 493.50 | 494.50 | 13 |
2005-06-12 | Perforation | 373.70 | 374.70 | 13 |
2005-06-12 | Perforation | 284.50 | 286.50 | 13 |
2005-06-12 | Perforation | 276.20 | 277.20 | 13 |
2005-06-12 | Perforation | 269.30 | 270.30 | 13 |
2005-06-20 | Fracture | 652.30 | 658.00 | 0 |
2005-06-20 | Fracture | 635.20 | 641.50 | 0 |
2005-06-20 | Fracture | 626.00 | 631.20 | 0 |
2005-06-20 | Fracture | 619.50 | 620.50 | 0 |
2005-06-12 | Perforation | 640.50 | 641.50 | 13 |
2005-06-20 | Fracture | 607.60 | 608.60 | 0 |
2005-06-20 | Fracture | 599.50 | 600.50 | 0 |
2005-06-20 | Fracture | 575.50 | 579.10 | 0 |
2005-06-20 | Fracture | 556.00 | 560.80 | 0 |
2005-06-20 | Fracture | 550.30 | 551.30 | 0 |
2005-06-20 | Fracture | 543.00 | 544.00 | 0 |
2005-06-20 | Fracture | 520.60 | 521.60 | 0 |
2005-06-20 | Fracture | 509.60 | 510.60 | 0 |
2005-06-20 | Fracture | 493.50 | 501.00 | 0 |
2005-06-20 | Fracture | 373.70 | 374.70 | 0 |
2005-06-12 | Perforation | 635.20 | 636.20 | 13 |
2005-06-20 | Fracture | 284.50 | 286.50 | 0 |
2005-06-20 | Fracture | 276.20 | 277.20 | 0 |
2005-06-20 | Fracture | 269.30 | 270.30 | 0 |
2005-06-12 | Perforation | 630.20 | 631.20 | 13 |
2005-06-12 | Perforation | 626.00 | 628.00 | 13 |
2005-06-12 | Perforation | 619.50 | 620.50 | 13 |
2005-06-12 | Perforation | 607.60 | 608.60 | 13 |
2005-06-12 | Perforation | 599.50 | 600.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 4080 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8729 | 0.0 | 0.0 | 0.0 |
2011 | 8636 | 0.0 | 0.0 | 0.0 |
2012 | 8492 | 0.0 | 0.0 | 0.0 |
2013 | 8624 | 0.0 | 0.0 | 0.0 |
2014 | 8737 | 0.0 | 0.0 | 0.0 |
2015 | 8629 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]