If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354233413002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.052388,"lon":-113.214242,"icon":""}]} |
Location: 00/13-34-035-23W4/2 | |
Location Alias: 00/13-34-35-23 W4M | |
Location Alias 2: 00/13-34-035-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 23 | |
Section: 34 | |
County/Municipality: Red Deer County | |
Well Name: RALLYCANADA MIKWAN 13-34-35-23 | |
Operator Name: Rally Canada Resources Ltd. | |
License Number: 0127956 | |
License Date: 1987-08-18 | |
License Status: Suspension | |
Spud Date: 1987-08-18 | |
Final Drill Date: 1987-08-26 | |
Well Total Depth: 1640.00 m | |
Surface Hole Latitude: 52.052388 | |
Surface Hole Longitude: -113.214242 |
Date | Event |
---|---|
1987-08-18 | Obtained License |
1987-08-19 | Surface Casing Operation Performed |
1987-08-25 | Well Log Performed |
1987-08-26 | Finished Drilling |
1987-08-26 | Well Log Performed |
1987-08-27 | Drill Stem Test Performed |
1987-08-28 | Drill Stem Test Performed |
1987-08-29 | Production Casing Operation Performed |
1987-08-29 | Rig Released |
1987-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-03 | Perforation Treatment Performed - Jet Perforation |
1987-09-03 | Plug Back Performed |
1987-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-09 | Perforation Treatment Performed - Jet Perforation |
1987-09-09 | Plug Back Performed |
1987-09-10 | Perforation Treatment Performed - Fractured |
1987-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-16 | Perforation Treatment Performed - Jet Perforation |
1987-09-16 | Plug Back Performed |
1987-09-17 | Perforation Treatment Performed - Fractured |
1988-06-14 | Perforation Treatment Performed - Cement Squeeze |
1988-06-14 | Perforation Treatment Performed - Jet Perforation |
1988-06-17 | Perforation Treatment Performed - Jet Perforation |
1988-06-17 | Well Mode changed to Drilled and Cased |
2000-08-29 | Well Began Production |
2000-08-29 | Well Fluid changed to Gas |
2000-08-29 | Well Mode changed to Flowing |
2002-12-17 | Well Fluid changed to Gas |
2002-12-17 | Well Mode changed to Suspended |
2004-05-18 | Well Fluid changed to Gas |
2004-05-18 | Well Mode changed to Flowing |
2012-06-01 | Well Fluid changed to Gas |
2012-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-09-03 | Perforation | 1603.00 | 1605.00 | 13 |
1987-09-17 | Fracture | 1420.00 | 1422.00 | 0 |
1988-06-14 | Perforation | 802.00 | 803.00 | 13 |
1988-06-14 | Cement Squeeze | 802.00 | 803.00 | 0 |
1988-06-17 | Perforation | 736.00 | 738.00 | 13 |
1988-06-17 | Perforation | 771.50 | 772.50 | 13 |
1987-09-03 | Packing Device Capped w/Cement | 1593.00 | 1601.00 | 0 |
1987-09-03 | Perforation | 1569.00 | 1571.00 | 13 |
1987-09-08 | Acid Treatment | 1569.00 | 1571.00 | 0 |
1987-09-09 | Packing Device Capped w/Cement | 1565.00 | 1568.00 | 0 |
1987-09-09 | Perforation | 1561.00 | 1563.00 | 13 |
1987-09-10 | Fracture | 1561.00 | 1563.00 | 0 |
1987-09-16 | Packing Device Capped w/Cement | 1512.00 | 1520.00 | 0 |
1987-09-16 | Perforation | 1420.00 | 1422.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1850 | 0.0 | 0.0 | 0.0 |
2001 | 3371 | 0.0 | 0.0 | 0.0 |
2004 | 5354 | 0.0 | 0.0 | 0.0 |
2005 | 8607 | 0.0 | 0.0 | 0.0 |
2006 | 8672 | 0.0 | 0.0 | 0.0 |
2007 | 7491 | 0.0 | 0.0 | 0.0 |
2008 | 8083 | 0.0 | 0.0 | 0.0 |
2009 | 8030 | 0.0 | 0.0 | 0.0 |
2010 | 8503 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 3171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]