If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344242108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.932032,"lon":-113.336947,"icon":""}]} |
Location: 00/08-21-034-24W4/0 | |
Location Alias: 00/08-21-34-24 W4M | |
Location Alias 2: 00/08-21-034-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 24 | |
Section: 21 | |
County/Municipality: Kneehill County | |
Well Name: EMBER HUXLEY 8-21-34-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411339 | |
License Date: 2009-07-08 | |
License Status: Amended | |
Spud Date: 2010-01-03 | |
Final Drill Date: 2010-01-21 | |
Well Total Depth: 958.00 m | |
Surface Hole Latitude: 51.932032 | |
Surface Hole Longitude: -113.336947 |
Date | Event |
---|---|
2009-07-08 | Obtained License |
2010-01-03 | Lost Circulation Occurred |
2010-01-04 | Surface Casing Operation Performed |
2010-01-21 | Finished Drilling |
2010-01-21 | Lost Circulation Occurred |
2010-01-21 | Well Mode changed to Drilled and Cased |
2010-01-22 | Production Casing Operation Performed |
2010-01-22 | Rig Released |
2010-01-27 | Well Log Performed |
2010-02-05 | Perforation Treatment Performed - Jet Perforation |
2010-02-07 | Perforation Treatment Performed - Jet Perforation |
2010-02-08 | Perforation Treatment Performed - Fractured |
2010-02-10 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-02-10 | Well Mode changed to Testing |
2010-02-23 | Well Began Production |
2010-02-23 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-02-23 | Well Mode changed to Flowing |
2010-03-09 | Well Log Performed |
2012-04-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-04-07 | Well Mode changed to Suspended |
2012-10-02 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-10-02 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-05 | Perforation | 885.50 | 886.50 | 13 |
2010-02-07 | Perforation | 316.90 | 317.40 | 13 |
2010-02-07 | Perforation | 338.80 | 339.30 | 13 |
2010-02-07 | Perforation | 390.40 | 391.40 | 13 |
2010-02-07 | Perforation | 384.50 | 385.50 | 13 |
2010-02-07 | Perforation | 584.00 | 587.00 | 13 |
2010-02-07 | Perforation | 606.70 | 607.20 | 13 |
2010-02-07 | Perforation | 593.00 | 594.00 | 13 |
2010-02-07 | Perforation | 602.30 | 602.80 | 13 |
2010-02-07 | Perforation | 599.60 | 600.10 | 13 |
2010-02-07 | Perforation | 513.30 | 514.30 | 13 |
2010-02-05 | Perforation | 895.90 | 897.90 | 13 |
2010-02-07 | Perforation | 500.20 | 501.70 | 13 |
2010-02-07 | Perforation | 547.20 | 548.20 | 13 |
2010-02-07 | Perforation | 573.00 | 574.00 | 13 |
2010-02-07 | Perforation | 557.10 | 558.10 | 13 |
2010-02-08 | Fracture | 316.90 | 574.00 | 0 |
2010-02-08 | Fracture | 584.00 | 607.20 | 0 |
2010-02-07 | Perforation | 453.30 | 454.30 | 13 |
2010-02-07 | Perforation | 406.70 | 407.20 | 13 |
2010-02-07 | Perforation | 457.00 | 458.00 | 13 |
2010-02-07 | Perforation | 495.80 | 497.30 | 13 |
2010-02-07 | Perforation | 462.60 | 463.10 | 13 |
2010-02-07 | Perforation | 401.90 | 402.90 | 13 |
2010-02-07 | Perforation | 321.80 | 322.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7511 | 0.0 | 0.0 | 0.0 |
2011 | 8591 | 0.0 | 0.0 | 0.0 |
2012 | 4495 | 0.0 | 0.0 | 0.0 |
2013 | 8627 | 0.0 | 0.0 | 0.0 |
2014 | 8500 | 0.0 | 0.0 | 0.0 |
2015 | 8641 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 7680 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-01-03 | Lost Circulation | 4.00 | 85.00 |
2010-01-21 | Lost Circulation | 112.00 | 112.00 |
For data sources see[6]