If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0344092016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.92648,"lon":-111.237435,"icon":""}]} |
Location: 00/16-20-034-09W4/0 | |
Location Alias: 00/16-20-34-09 W4M | |
Location Alias 2: 00/16-20-034-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 034 | |
Meridian: 4 | |
Range: 09 | |
Section: 20 | |
County/Municipality: Special Areas No. 4 | |
Well Name: GRL HZ 1-20 PROVOST 16-20-34-9 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0446760 | |
License Date: 2012-06-22 | |
License Status: Suspension | |
Spud Date: 2012-07-30 | |
Final Drill Date: 2012-08-06 | |
Well Total Depth: 2260.00 m | |
Surface Hole Latitude: 51.926480 | |
Surface Hole Longitude: -111.237435 |
Date | Event |
---|---|
2012-06-22 | Obtained License |
2012-07-30 | Surface Casing Operation Performed |
2012-07-30 | Well Log Performed |
2012-07-31 | Direction Drilling Operation Performed - Horizontal |
2012-08-01 | Intermediate Casing Operation Performed |
2012-08-06 | Finished Drilling |
2012-08-06 | Liner Casing Operation Performed |
2012-08-06 | Well Mode changed to Drilled and Cased |
2012-08-07 | Rig Released |
2012-08-19 | Well Log Performed |
2012-08-23 | Perforation Treatment Performed - Jet Perforation |
2012-08-28 | Perforation Treatment Performed - Jet Perforation |
2012-08-29 | Perforation Treatment Performed - Jet Perforation |
2012-09-22 | Perforation Treatment Performed - Fractured |
2012-09-23 | Perforation Treatment Performed - Fractured |
2012-09-24 | Perforation Treatment Performed - Fractured |
2012-10-11 | Perforation Treatment Performed - Fractured |
2012-11-15 | Well Began Production |
2012-11-15 | Well Fluid changed to Crude Oil |
2012-11-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-30 | Savanna Drilling Corp. | 428 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-31 | 614.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-23 | Perforation | 2237.00 | 2237.50 | 14 |
2012-08-28 | Perforation | 1777.00 | 1777.50 | 14 |
2012-08-28 | Perforation | 1722.50 | 1723.00 | 14 |
2012-08-28 | Perforation | 1676.00 | 1676.50 | 14 |
2012-08-29 | Perforation | 1642.00 | 1642.50 | 14 |
2012-08-29 | Perforation | 1616.00 | 1616.50 | 14 |
2012-08-29 | Perforation | 1521.50 | 1522.00 | 14 |
2012-08-29 | Perforation | 1490.00 | 1490.50 | 14 |
2012-08-29 | Perforation | 1424.00 | 1424.50 | 14 |
2012-08-29 | Perforation | 1387.50 | 1388.00 | 14 |
2012-08-29 | Perforation | 1345.00 | 1345.50 | 14 |
2012-08-23 | Perforation | 2102.00 | 2102.50 | 14 |
2012-08-29 | Perforation | 1274.00 | 1274.50 | 14 |
2012-08-29 | Perforation | 1232.00 | 1232.50 | 14 |
2012-08-29 | Perforation | 1200.00 | 1200.50 | 14 |
2012-08-29 | Perforation | 1153.00 | 1153.50 | 14 |
2012-08-29 | Perforation | 1115.00 | 1115.50 | 14 |
2012-08-29 | Perforation | 1088.00 | 1088.50 | 14 |
2012-08-29 | Perforation | 1060.00 | 1060.50 | 14 |
2012-09-22 | Fracture | 2040.00 | 2040.50 | 0 |
2012-09-22 | Fracture | 1840.00 | 1840.50 | 0 |
2012-09-22 | Fracture | 1722.50 | 1723.00 | 0 |
2012-08-23 | Perforation | 2069.50 | 2070.00 | 14 |
2012-09-23 | Fracture | 1616.00 | 1616.50 | 0 |
2012-09-23 | Fracture | 1521.50 | 1522.00 | 0 |
2012-09-23 | Fracture | 1490.00 | 1490.50 | 0 |
2012-09-23 | Fracture | 1424.00 | 1424.50 | 0 |
2012-09-23 | Fracture | 1387.50 | 1388.00 | 0 |
2012-09-23 | Fracture | 1345.00 | 1345.50 | 0 |
2012-09-24 | Fracture | 1060.00 | 1060.50 | 0 |
2012-10-11 | Fracture | 1232.00 | 1232.50 | 0 |
2012-10-11 | Fracture | 1200.00 | 1200.50 | 0 |
2012-10-11 | Fracture | 1153.00 | 1153.50 | 0 |
2012-08-23 | Perforation | 2040.00 | 2040.50 | 14 |
2012-10-11 | Fracture | 1115.00 | 1115.50 | 0 |
2012-10-11 | Fracture | 1088.00 | 1088.50 | 0 |
2012-08-23 | Perforation | 2002.00 | 2002.50 | 14 |
2012-08-23 | Perforation | 1958.50 | 1959.00 | 14 |
2012-08-23 | Perforation | 1935.50 | 1936.00 | 14 |
2012-08-28 | Perforation | 1840.00 | 1840.50 | 14 |
2012-08-28 | Perforation | 1810.00 | 1810.50 | 14 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1108 | 0.0 | 0.0 | 0.0 |
2013 | 8340 | 0.0 | 0.0 | 0.0 |
2014 | 8262 | 0.0 | 0.0 | 0.0 |
2015 | 7410 | 0.0 | 0.0 | 0.0 |
2016 | 4764 | 0.0 | 0.0 | 0.0 |
2017 | 3864 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-30 | No Incident Encountered | 0.00 | 0.00 |
2012-11-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]