X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0344041510000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0344041510000
 
| Well ID: 0344041510000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.922654, -110.487361 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.922654, -110.487361 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-15-034-04W4/0
 
| Location: 00/10-15-034-04W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-15-034-04 W4/00
 
| Location Alias 2: 00/10-15-034-04 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 
|-
 
|-
| County/Municipality: [[Special Area No. 4,_Alberta|Special Area No. 4]]
+
| Township: 034
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 04
 +
|-
 +
| Section: 15
 +
|-
 +
| County/Municipality: [[Special Areas No. 4,_Alberta|Special Areas No. 4]]
 
|-
 
|-
 
| Well Name: ACL PROVOST 10-15-34-4
 
| Well Name: ACL PROVOST 10-15-34-4
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Karve Energy Inc.]]
 
|-
 
|-
 
| License Number: 0247349
 
| License Number: 0247349
Line 29: Line 39:
 
| Final Drill Date: 2001-01-09
 
| Final Drill Date: 2001-01-09
 
|-
 
|-
| Well Total Depth: 926 m
+
| Well Total Depth: 926.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 51.922654
 
| Surface Hole Latitude: 51.922654
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2000-12-16
 +
| Obtained License
 +
|-
 +
| 2001-01-07
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2001-01-07
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2001-01-09
 +
| Finished Drilling
 +
|-
 +
| 2001-01-10
 +
| Production Casing Operation Performed
 +
|-
 +
| 2001-01-10
 +
| Rig Released
 +
|-
 +
| 2001-01-10
 +
| Well Log Performed
 +
|-
 +
| 2001-01-10
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2001-01-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-01-19
 +
| Well Log Performed
 +
|-
 +
| 2001-01-20
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-01-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-01-20
 +
| Plug Back Performed
 +
|-
 +
| 2001-01-20
 +
| Well Log Performed
 +
|-
 +
| 2001-01-20
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2001-01-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-01-21
 +
| Plug Back Performed
 +
|-
 +
| 2001-01-21
 +
| Well Log Performed
 +
|-
 +
| 2001-01-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-01-23
 +
| Well Log Performed
 +
|-
 +
| 2001-01-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2001-01-24
 +
| Plug Back Performed
 +
|-
 +
| 2001-01-24
 +
| Well Log Performed
 +
|-
 +
| 2001-02-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-02-02
 +
| Well Log Performed
 +
|-
 +
| 2001-02-03
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 2001-02-03
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2001-02-08
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-02-08
 +
| Well Log Performed
 +
|-
 +
| 2001-02-09
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2001-02-17
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-02-17
 +
| Well Log Performed
 +
|-
 +
| 2001-02-18
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2001-02-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-02-26
 +
| Well Log Performed
 +
|-
 +
| 2001-02-27
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2001-03-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2001-03-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2001-03-12
 +
| Well Log Performed
 +
|-
 +
| 2001-04-25
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2018-12-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2018-12-12
 +
| Plug Back Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 211:
 
|-
 
|-
 
| 2001-01-07
 
| 2001-01-07
| style="text-align: right;" | 172
+
| style="text-align: right;" | 172.00
 
+
| Deviate (5 - 79 degrees)
 
|-
 
|-
 
|}
 
|}
Line 70: Line 218:
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 83: Line 231:
 
| 2001-01-19
 
| 2001-01-19
 
| Perforation
 
| Perforation
| style="text-align: right;" | 893.5
+
| style="text-align: right;" | 893.50
| style="text-align: right;" | 895
+
| style="text-align: right;" | 895.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-01-20
 
| 2001-01-20
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 882
+
| style="text-align: right;" | 882.00
| style="text-align: right;" | 892
+
| style="text-align: right;" | 892.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-01-20
 
| 2001-01-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 876
+
| style="text-align: right;" | 876.00
| style="text-align: right;" | 880
+
| style="text-align: right;" | 880.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-01-21
 
| 2001-01-21
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 865
+
| style="text-align: right;" | 865.00
| style="text-align: right;" | 875
+
| style="text-align: right;" | 875.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-01-23
 
| 2001-01-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 867
+
| style="text-align: right;" | 867.00
| style="text-align: right;" | 870
+
| style="text-align: right;" | 870.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-01-24
 
| 2001-01-24
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 854
+
| style="text-align: right;" | 854.00
| style="text-align: right;" | 864
+
| style="text-align: right;" | 864.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-02
 
| 2001-02-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 604
+
| style="text-align: right;" | 604.00
| style="text-align: right;" | 605
+
| style="text-align: right;" | 605.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2001-02-03
 
| 2001-02-03
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 604
+
| style="text-align: right;" | 604.00
| style="text-align: right;" | 605
+
| style="text-align: right;" | 605.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-03
 
| 2001-02-03
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 604
+
| style="text-align: right;" | 604.00
| style="text-align: right;" | 605
+
| style="text-align: right;" | 605.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-08
 
| 2001-02-08
 
| Perforation
 
| Perforation
| style="text-align: right;" | 449.5
+
| style="text-align: right;" | 449.50
| style="text-align: right;" | 450.5
+
| style="text-align: right;" | 450.50
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2001-02-09
 
| 2001-02-09
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 449.5
+
| style="text-align: right;" | 449.50
| style="text-align: right;" | 450.5
+
| style="text-align: right;" | 450.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-17
 
| 2001-02-17
 
| Perforation
 
| Perforation
| style="text-align: right;" | 269
+
| style="text-align: right;" | 269.00
| style="text-align: right;" | 269.3
+
| style="text-align: right;" | 269.30
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2001-02-18
 
| 2001-02-18
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 269
+
| style="text-align: right;" | 269.00
| style="text-align: right;" | 269.3
+
| style="text-align: right;" | 269.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-02-26
 
| 2001-02-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 184
+
| style="text-align: right;" | 184.00
| style="text-align: right;" | 184.3
+
| style="text-align: right;" | 184.30
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
 
|-
 
|-
 
| 2001-02-27
 
| 2001-02-27
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 184
+
| style="text-align: right;" | 184.00
| style="text-align: right;" | 184.3
+
| style="text-align: right;" | 184.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-03-09
 
| 2001-03-09
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 184
+
| style="text-align: right;" | 184.00
| style="text-align: right;" | 184.3
+
| style="text-align: right;" | 184.30
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001-03-12
 
| 2001-03-12
 
| Perforation
 
| Perforation
| style="text-align: right;" | 840.5
+
| style="text-align: right;" | 840.50
| style="text-align: right;" | 842.5
+
| style="text-align: right;" | 842.50
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 2001-04-25
 
| 2001-04-25
| Fracture  
+
| Fracture
| style="text-align: right;" | 840.5
+
| style="text-align: right;" | 840.50
| style="text-align: right;" | 842.5
+
| style="text-align: right;" | 842.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018-12-12
 
| 2018-12-12
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 827
+
| style="text-align: right;" | 827.00
| style="text-align: right;" | 835
+
| style="text-align: right;" | 835.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 199: Line 347:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 232: Line 394:
 
|}-->
 
|}-->
  
<!--== Occurences ==
+
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 239: Line 401:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 2018-12-12
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Alberta]][[Category:Wells]]
 
[[Category:Alberta]][[Category:Wells]]

Revision as of 19:02, 12 July 2020

Well Details

Well ID: 0344041510000
Loading map...
Location: 00/10-15-034-04W4/0
Location Alias: 00/10-15-34-04 W4M
Location Alias 2: 00/10-15-034-04 W4/00
Country: Canada
Province: Alberta
Township: 034
Meridian: 4
Range: 04
Section: 15
County/Municipality: Special Areas No. 4
Well Name: ACL PROVOST 10-15-34-4
Operator Name: Karve Energy Inc.
License Number: 0247349
License Date: 2000-12-16
License Status: Suspension
Spud Date: 2001-01-06
Final Drill Date: 2001-01-09
Well Total Depth: 926.00 m
Surface Hole Latitude: 51.922654
Surface Hole Longitude: -110.487361

For data sources see[1][2]

Well History

Date Event
2000-12-16 Obtained License
2001-01-07 Direction Drilling Operation Performed - Deviate
2001-01-07 Surface Casing Operation Performed
2001-01-09 Finished Drilling
2001-01-10 Production Casing Operation Performed
2001-01-10 Rig Released
2001-01-10 Well Log Performed
2001-01-10 Well Mode changed to Drilled and Cased
2001-01-19 Perforation Treatment Performed - Jet Perforation
2001-01-19 Well Log Performed
2001-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-20 Perforation Treatment Performed - Jet Perforation
2001-01-20 Plug Back Performed
2001-01-20 Well Log Performed
2001-01-20 Well Mode changed to Abandoned Zone
2001-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-21 Plug Back Performed
2001-01-21 Well Log Performed
2001-01-23 Perforation Treatment Performed - Jet Perforation
2001-01-23 Well Log Performed
2001-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-24 Plug Back Performed
2001-01-24 Well Log Performed
2001-02-02 Perforation Treatment Performed - Jet Perforation
2001-02-02 Well Log Performed
2001-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-03 Perforation Treatment Performed - Remedial Casing
2001-02-08 Perforation Treatment Performed - Jet Perforation
2001-02-08 Well Log Performed
2001-02-09 Perforation Treatment Performed - Remedial Casing
2001-02-17 Perforation Treatment Performed - Jet Perforation
2001-02-17 Well Log Performed
2001-02-18 Perforation Treatment Performed - Remedial Casing
2001-02-26 Perforation Treatment Performed - Jet Perforation
2001-02-26 Well Log Performed
2001-02-27 Perforation Treatment Performed - Remedial Casing
2001-03-09 Perforation Treatment Performed - Cement Squeeze
2001-03-12 Perforation Treatment Performed - Jet Perforation
2001-03-12 Well Log Performed
2001-04-25 Perforation Treatment Performed - Fractured
2018-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-12-12 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-01-07 172.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-19 Perforation 893.50 895.00 17
2001-01-20 Packing Device Capped w/Cement 882.00 892.00 0
2001-01-20 Perforation 876.00 880.00 17
2001-01-21 Packing Device Capped w/Cement 865.00 875.00 0
2001-01-23 Perforation 867.00 870.00 17
2001-01-24 Packing Device Capped w/Cement 854.00 864.00 0
2001-02-02 Perforation 604.00 605.00 14
2001-02-03 Acid Treatment 604.00 605.00 0
2001-02-03 Remedial Casing Cementing 604.00 605.00 0
2001-02-08 Perforation 449.50 450.50 14
2001-02-09 Remedial Casing Cementing 449.50 450.50 0
2001-02-17 Perforation 269.00 269.30 14
2001-02-18 Remedial Casing Cementing 269.00 269.30 0
2001-02-26 Perforation 184.00 184.30 14
2001-02-27 Remedial Casing Cementing 184.00 184.30 0
2001-03-09 Cement Squeeze 184.00 184.30 0
2001-03-12 Perforation 840.50 842.50 17
2001-04-25 Fracture 840.50 842.50 0
2018-12-12 Packing Device Capped w/Cement 827.00 835.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References