X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335071106000

Well Details

Well ID: 0335071106000
Loading map...
Location: 00/06-11-033-07W5/0
Location Alias: 00/06-11-33-07 W5M
Location Alias 2: 00/06-11-033-07 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 07
Section: 11
County/Municipality: Mountain View County
Well Name: PC 7-11DR RICINUS 6-11-33-7
Operator Name: TAQA North Ltd.
License Number: 0340491
License Date: 2005-10-19
License Status: Amended
Spud Date: 2005-11-17
Final Drill Date: 2005-12-13
Well Total Depth: 3237.00 m
Surface Hole Latitude: 51.816442
Surface Hole Longitude: -114.884745

For data sources see[1][2]

Well History

Date Event
2005-10-19 Obtained License
2005-11-17 Lost Circulation Occurred
2005-11-21 Surface Casing Operation Performed
2005-11-28 Direction Drilling Operation Performed - Deviate
2005-12-08 Kick Occurred
2005-12-13 Finished Drilling
2005-12-13 Well Mode changed to Drilled and Cased
2005-12-14 Well Log Performed
2005-12-17 Production Casing Operation Performed
2005-12-18 Rig Released
2006-07-18 Well Log Performed
2006-07-20 Perforation Treatment Performed - Jet Perforation
2006-07-25 Perforation Treatment Performed - Fractured
2006-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-04 Well Log Performed
2006-08-05 Perforation Treatment Performed - Jet Perforation
2006-08-05 Well Log Performed
2006-08-08 Perforation Treatment Performed - Fractured
2006-08-08 Well Log Performed
2006-08-10 Well Log Performed
2006-08-11 Perforation Treatment Performed - Jet Perforation
2006-08-16 Perforation Treatment Performed - Fractured
2006-08-20 Well Log Performed
2007-02-01 Well Began Production
2007-02-01 Well Fluid changed to Gas
2007-02-01 Well Mode changed to Flowing
2007-12-04 Well Log Performed
2015-04-01 Well Fluid changed to Gas
2015-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-11-28 1550.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-07-20 Perforation 3160.00 3162.00 17
2006-07-20 Perforation 3164.50 3169.50 17
2006-07-25 Fracture 3160.00 3169.50 0
2006-08-04 Packing Device Capped w/Cement 3108.00 3110.00 0
2006-08-05 Perforation 2983.00 2986.50 17
2006-08-05 Perforation 3003.50 3009.50 17
2006-08-08 Fracture 2983.00 3009.50 0
2006-08-11 Perforation 2849.50 2855.50 17
2006-08-16 Fracture 2849.50 2855.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7548 0.0 0.0 0.0
2008 8336 0.0 0.0 0.0
2009 8204 0.0 0.0 0.0
2010 7414 0.0 0.0 0.0
2011 8703 0.0 0.0 0.0
2012 8475 0.0 0.0 0.0
2013 8699 0.0 0.0 0.0
2014 8646 0.0 0.0 0.0
2015 8715 0.0 0.0 0.0
2016 8442 0.0 0.0 0.0
2017 7499 0.0 0.0 0.0
2018 8094 0.0 0.0 0.0
2019 7654 0.0 0.0 0.0
2020 2076 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-11-17 Lost Circulation 33.00 80.00
2005-12-08 Kick 2980.00 3064.00

For data sources see[7]

References