If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334232808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.859663,"lon":-113.196952,"icon":""}]} |
Location: 00/08-28-033-23W4/0 | |
Location Alias: 00/08-28-33-23 W4M | |
Location Alias 2: 00/08-28-033-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 23 | |
Section: 28 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 8-28-33-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0452969 | |
License Date: 2012-12-28 | |
License Status: Issued | |
Spud Date: 2013-02-01 | |
Final Drill Date: 2013-02-02 | |
Well Total Depth: 523.00 m | |
Surface Hole Latitude: 51.859663 | |
Surface Hole Longitude: -113.196952 |
Date | Event |
---|---|
2012-12-28 | Obtained License |
2013-02-01 | Surface Casing Operation Performed |
2013-02-02 | Finished Drilling |
2013-02-02 | Production Casing Operation Performed |
2013-02-02 | Rig Released |
2013-02-02 | Well Mode changed to Drilled and Cased |
2013-02-11 | Well Log Performed |
2013-02-21 | Perforation Treatment Performed - Jet Perforation |
2013-02-22 | Perforation Treatment Performed - Fractured |
2013-02-26 | Well Began Production |
2013-02-26 | Well Fluid changed to Coalbed Methane-Coals Only |
2013-02-26 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-02-01 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
2013-02-03 | Precision Drilling Corporation | 136 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-02-21 | Perforation | 462.80 | 463.70 | 13 |
2013-02-21 | Perforation | 327.10 | 330.90 | 13 |
2013-02-21 | Perforation | 281.00 | 281.70 | 13 |
2013-02-21 | Perforation | 279.80 | 280.60 | 13 |
2013-02-21 | Perforation | 232.10 | 232.60 | 13 |
2013-02-21 | Perforation | 220.10 | 220.50 | 13 |
2013-02-21 | Perforation | 214.00 | 215.00 | 13 |
2013-02-22 | Fracture | 220.10 | 463.70 | 0 |
2013-02-21 | Perforation | 461.30 | 462.30 | 13 |
2013-02-21 | Perforation | 459.10 | 459.50 | 13 |
2013-02-21 | Perforation | 396.00 | 396.90 | 13 |
2013-02-21 | Perforation | 394.20 | 395.30 | 13 |
2013-02-21 | Perforation | 383.80 | 384.40 | 13 |
2013-02-21 | Perforation | 381.70 | 383.10 | 13 |
2013-02-21 | Perforation | 357.00 | 357.90 | 13 |
2013-02-21 | Perforation | 347.60 | 348.60 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-22 | 2013-02-22 | N/A | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 100 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 7404 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
2020 | 726 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-02-02 | No Incident Encountered | 0.00 | 0.00 |
2013-02-21 | No Incident Encountered | 0.00 | 0.00 |
2013-02-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]