X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325043011000

Well Details

Well ID: 0325043011000
Loading map...
Location: 00/11-30-032-04W5/0
Location Alias: 00/11-30-32-04 W5M
Location Alias 2: 00/11-30-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 30
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 11-30-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0017599
License Date: 1959-08-19
License Status: Issued
Spud Date: 1959-09-09
Final Drill Date: 1959-10-06
Well Total Depth: 2795.00 m
Surface Hole Latitude: 51.775017
Surface Hole Longitude: -114.558299

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-19 Obtained License
1959-10-06 Finished Drilling
1959-10-06 Well Mode changed to Drilled and Cased
1959-10-09 Production Casing Operation Performed
1959-10-20 Perforation Treatment Performed - Open-Hole Completion
1959-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-25 Well Began Production
1959-10-25 Well Fluid changed to Crude Oil
1959-10-25 Well Mode changed to Flowing
1973-08-26 Perforation Treatment Performed - Jet Perforation
1973-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-02 Well Fluid changed to Crude Oil
1975-06-02 Well Mode changed to Pumping
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Flowing
1985-07-21 Well Fluid changed to Crude Oil
1985-07-21 Well Mode changed to Pumping
1991-09-26 Perforation Treatment Performed - Open-Hole Completion
1991-09-27 Perforation Treatment Performed - Jet Perforation
1991-09-27 Well Log Performed
1991-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-10-20 Open Hole/Barefoot Completion 2777.30 2783.70 0
1959-10-23 Acid Treatment 2777.30 2783.70 0
1973-08-26 Perforation 2774.30 2776.10 13
1973-08-28 Acid Treatment 2774.30 2776.10 0
1991-09-26 Open Hole/Barefoot Completion 2777.30 2795.00 0
1991-09-27 Perforation 2774.30 2776.10 13
1991-09-30 Acid Treatment 2774.30 2795.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1967 402 0.0 0.0 0.0
1968 737 0.0 0.0 0.0
1969 7749 0.0 0.0 0.0
1970 4769 0.0 0.0 0.0
1971 5514 0.0 0.0 0.0
1972 6072 0.0 0.0 0.0
1974 6886 0.0 0.0 0.0
1975 8241 0.0 0.0 0.0
1976 8088 0.0 0.0 0.0
1977 3532 0.0 0.0 0.0
1978 4 0.0 0.0 0.0
1980 6284 0.0 0.0 0.0
1981 8477 0.0 0.0 0.0
1982 8525 0.0 0.0 0.0
1983 7253 0.0 0.0 0.0
1984 6740 0.0 0.0 0.0
1985 7708 0.0 0.0 0.0
1986 8208 0.0 0.0 0.0
1987 7850 0.0 0.0 0.0
1988 8091 0.0 0.0 0.0
1989 8207 0.0 0.0 0.0
1990 8310 0.0 0.0 0.0
1991 8341 0.0 0.0 0.0
1992 8126 0.0 0.0 0.0
1993 8744 0.0 0.0 0.0
1994 8153 0.0 0.0 0.0
1995 8636 0.0 0.0 0.0
1996 8116 0.0 0.0 0.0
1997 8747 0.0 0.0 0.0
1998 8511 0.0 0.0 0.0
1999 8162 0.0 0.0 0.0
2000 8504 0.0 0.0 0.0
2001 8743 0.0 0.0 0.0
2002 7606 0.0 0.0 0.0
2003 7709 0.0 0.0 0.0
2004 8749 0.0 0.0 0.0
2005 7579 0.0 0.0 0.0
2006 6900 0.0 0.0 0.0
2007 8332 0.0 0.0 0.0
2008 7457 0.0 0.0 0.0
2009 7625 0.0 0.0 0.0
2010 3264 0.0 0.0 0.0
2011 2360 0.0 0.0 0.0
2012 7477 0.0 0.0 0.0
2013 8614 0.0 0.0 0.0
2014 7472 0.0 0.0 0.0
2015 6659 0.0 0.0 0.0
2016 8610 0.0 0.0 0.0
2017 8125 0.0 0.0 0.0
2018 6466 0.0 0.0 0.0
2019 7959 0.0 0.0 0.0
2020 1183 0.0 0.0 0.0

For data sources see[5]

References