X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325042311000

Well Details

Well ID: 0325042311000
Loading map...
Location: 00/11-23-032-04W5/0
Location Alias: 00/11-23-32-04 W5M
Location Alias 2: 00/11-23-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 23
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 11-23-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0020608
License Date: 1961-04-04
License Status: Abandoned
Spud Date: 1961-04-28
Final Drill Date: 1961-05-29
Well Total Depth: 2683.80 m
Surface Hole Latitude: 51.759567
Surface Hole Longitude: -114.463915

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-04-04 Obtained License
1961-05-29 Finished Drilling
1961-05-29 Well Mode changed to Drilled and Cased
1961-05-31 Production Casing Operation Performed
1961-06-02 Perforation Treatment Performed - Open-Hole Completion
1961-06-05 Well Began Production
1961-06-05 Well Fluid changed to Crude Oil
1961-06-05 Well Mode changed to Flowing
1962-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-02 Perforation Treatment Performed - Jet Perforation
1972-11-29 Well Began Injection
1972-11-29 Well Fluid changed to Water
1972-11-29 Well Type changed to Injection
1987-10-21 Perforation Treatment Performed - Acid Wash - No Pressure
1987-10-22 Perforation Treatment Performed - Acid Wash - No Pressure
1987-12-11 Well Log Performed
1989-10-01 Well Fluid changed to Carbon Dioxide
1989-10-01 Well Type changed to Injection
1998-06-30 Well Fluid changed to Carbon Dioxide
1998-06-30 Well Mode changed to Suspended
1998-06-30 Well Type changed to Injection
2005-05-11 Well Log Performed
2005-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-12 Perforation Treatment Performed - Jet Perforation
2005-05-12 Plug Back Performed
2005-05-12 Well Fluid changed to Carbon Dioxide
2005-05-12 Well Log Performed
2005-05-12 Well Mode changed to Abandoned Zone
2005-05-12 Well Type changed to Injection
2005-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-17 Perforation Treatment Performed - Remedial Casing
2005-05-17 Plug Back Performed
2005-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-18 Perforation Treatment Performed - Jet Perforation
2005-05-18 Perforation Treatment Performed - Remedial Casing
2005-05-18 Plug Back Performed
2005-05-18 Well Log Performed
2005-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-24 Perforation Treatment Performed - Jet Perforation
2005-05-24 Plug Back Performed
2005-05-24 Well Log Performed
2005-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-25 Perforation Treatment Performed - Remedial Casing
2005-05-25 Plug Back Performed
2005-10-03 Well Abandoned
2005-10-03 Well Fluid changed to Carbon Dioxide
2005-10-03 Well Mode changed to Abandoned
2005-10-03 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-02 Open Hole/Barefoot Completion 2642.90 2683.80 0
2005-05-18 Perforation 1683.00 1684.00 17
2005-05-18 Remedial Casing Cementing 1683.00 1684.00 0
2005-05-18 Packing Device Capped w/Cement 1659.00 1673.00 0
2005-05-24 Packing Device Capped w/Cement 527.00 577.00 0
2005-05-24 Perforation 330.00 331.00 17
2005-05-25 Remedial Casing Cementing 330.00 331.00 0
2005-05-25 Packing Device Capped w/Cement 298.00 320.00 0
1962-03-29 Acid Treatment 2642.90 2683.80 0
1972-11-02 Perforation 2639.10 2642.60 13
1987-10-21 Acid Wash 2639.10 2642.60 0
1987-10-22 Acid Wash 2639.10 2683.80 0
2005-05-12 Packing Device Capped w/Cement 2619.00 2627.00 0
2005-05-12 Perforation 2210.00 2211.00 17
2005-05-17 Remedial Casing Cementing 2210.00 2211.00 0
2005-05-17 Packing Device Capped w/Cement 2184.00 2200.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 718 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 5868 0.0 0.0 0.0
1970 1364 0.0 0.0 0.0
1971 511 0.0 0.0 0.0
1972 4910 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0

For data sources see[5]

References