X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325041305000

Well Details

Well ID: 0325041305000
Loading map...
Location: 00/05-13-032-04W5/0
Location Alias: 00/05-13-32-04 W5M
Location Alias 2: 00/05-13-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 13
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 5-13-32-4
Operator Name: ExxonMobil Canada Energy
License Number: 0016298
License Date: 1958-11-21
License Status: RecCertified
Spud Date: 1958-11-22
Final Drill Date: 1958-12-23
Well Total Depth: 2645.70 m
Surface Hole Latitude: 51.741849
Surface Hole Longitude: -114.446644

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-21 Obtained License
1958-12-23 Finished Drilling
1958-12-23 Well Mode changed to Drilled and Cased
1958-12-24 Production Casing Operation Performed
1958-12-27 Perforation Treatment Performed - Open-Hole Completion
1958-12-30 Well Began Production
1958-12-30 Well Fluid changed to Crude Oil
1958-12-30 Well Mode changed to Flowing
1975-10-29 Well Fluid changed to Crude Oil
1975-10-29 Well Mode changed to Gas Lift
1979-06-30 Perforation Treatment Performed - Jet Perforation
1984-01-19 Well Log Performed
1987-08-07 Well Began Injection
1987-08-07 Well Fluid changed to Water
1987-08-07 Well Type changed to Injection
1987-08-21 Well Log Performed
1989-05-01 Well Fluid changed to Carbon Dioxide
1989-05-01 Well Type changed to Injection
1991-11-19 Well Log Performed
1995-05-03 Well Log Performed
1998-11-01 Well Fluid changed to Carbon Dioxide
1998-11-01 Well Mode changed to Suspended
1998-11-01 Well Type changed to Injection
2004-01-22 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-01-22 Perforation Treatment Performed - Jet Perforation
2004-01-22 Well Log Performed
2004-01-24 Perforation Treatment Performed - Remedial Casing
2004-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-25 Plug Back Performed
2004-01-25 Well Fluid changed to Carbon Dioxide
2004-01-25 Well Log Performed
2004-01-25 Well Mode changed to Abandoned Zone
2004-01-25 Well Type changed to Injection
2004-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-03 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-02-03 Perforation Treatment Performed - Jet Perforation
2004-02-03 Well Log Performed
2004-02-05 Perforation Treatment Performed - Remedial Casing
2004-02-06 Perforation Treatment Performed - Jet Perforation
2004-02-06 Well Log Performed
2004-02-07 Perforation Treatment Performed - Remedial Casing
2004-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-08 Perforation Treatment Performed - Jet Perforation
2004-02-08 Well Log Performed
2004-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-09 Perforation Treatment Performed - Remedial Casing
2004-06-15 Well Abandoned
2004-06-15 Well Fluid changed to Carbon Dioxide
2004-06-15 Well Mode changed to Abandoned
2004-06-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-12-27 Open Hole/Barefoot Completion 2631.90 2645.70 0
2004-02-03 Bridge Plug, No Cement 560.00 560.10 0
2004-02-05 Remedial Casing Cementing 545.00 546.00 0
2004-02-06 Perforation 454.00 455.00 17
2004-02-07 Remedial Casing Cementing 454.00 455.00 0
2004-02-08 Packing Device Capped w/Cement 434.00 442.00 0
2004-02-08 Perforation 285.00 286.00 17
2004-02-09 Remedial Casing Cementing 285.00 286.00 0
2004-02-09 Packing Device Capped w/Cement 263.00 273.00 0
1979-06-30 Perforation 2613.40 2625.60 7
1979-06-30 Perforation 2623.90 2630.00 7
2004-01-22 Perforation 1668.20 1670.20 17
2004-01-22 Bridge Plug, No Cement 1675.20 1675.30 0
2004-01-24 Remedial Casing Cementing 1668.20 1670.20 0
2004-01-25 Packing Device Capped w/Cement 1651.00 1659.00 0
2004-02-02 Packing Device Capped w/Cement 631.00 795.00 0
2004-02-03 Perforation 545.00 546.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 7460 0.0 0.0 0.0
1970 4642 0.0 0.0 0.0
1972 1167 0.0 0.0 0.0
1973 6256 0.0 0.0 0.0
1976 1560 0.0 0.0 0.0
1977 8268 0.0 0.0 0.0
1978 5240 0.0 0.0 0.0
1979 7837 0.0 0.0 0.0
1980 8413 0.0 0.0 0.0
1981 7682 0.0 0.0 0.0
1982 6816 0.0 0.0 0.0
1983 7470 0.0 0.0 0.0
1984 8328 0.0 0.0 0.0
1985 8165 0.0 0.0 0.0
1986 8094 0.0 0.0 0.0
1987 3536 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References