X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325031809000

Well Details

Well ID: 0325031809000
Loading map...
Location: 00/09-18-032-03W5/0
Location Alias: 00/09-18-32-03 W5M
Location Alias 2: 00/09-18-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 18
County/Municipality: Mountain View County
Well Name: MOBIL UNIT 1 HARME 9-18-32-3
Operator Name: ExxonMobil Canada Energy
License Number: 0123479
License Date: 1986-07-16
License Status: RecCertified
Spud Date: 1986-08-04
Final Drill Date: 1986-08-19
Well Total Depth: 2604.00 m
Surface Hole Latitude: 51.744615
Surface Hole Longitude: -114.406849

For data sources see[1][2]

Well History

Date Event
1986-07-16 Obtained License
1986-08-05 Surface Casing Operation Performed
1986-08-19 Finished Drilling
1986-08-19 Well Log Performed
1986-08-19 Well Mode changed to Drilled and Cased
1986-08-20 Well Log Performed
1986-08-21 Well Log Performed
1986-08-22 Production Casing Operation Performed
1986-08-22 Rig Released
1986-09-03 Perforation Treatment Performed - Jet Perforation
1986-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-07 Well Began Production
1986-09-07 Well Fluid changed to Crude Oil
1986-09-07 Well Mode changed to Flowing
1986-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-12 Perforation Treatment Performed - Jet Perforation
1986-09-29 Well Fluid changed to Crude Oil
1986-09-29 Well Mode changed to Suspended
1992-05-06 Well Fluid changed to Gas
1992-05-06 Well Mode changed to Flowing
2000-05-01 Well Fluid changed to Gas
2000-05-01 Well Mode changed to Suspended
2006-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-26 Well Log Performed
2006-03-27 Perforation Treatment Performed - Jet Perforation
2006-03-27 Well Log Performed
2006-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-28 Perforation Treatment Performed - Remedial Casing
2006-03-28 Plug Back Performed
2006-03-28 Well Fluid changed to Gas
2006-03-28 Well Mode changed to Abandoned Zone
2006-08-21 Well Abandoned
2006-08-21 Well Fluid changed to Gas
2006-08-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-03 Perforation 2572.00 2573.00 13
1986-09-03 Perforation 2575.00 2577.00 13
1986-09-05 Acid Treatment 2572.00 2577.00 0
1986-09-12 Perforation 2561.00 2567.50 13
1986-09-12 Acid Treatment 2561.00 2577.00 0
2006-03-26 Packing Device Capped w/Cement 2543.00 2551.00 0
2006-03-27 Perforation 604.00 605.00 17
2006-03-28 Remedial Casing Cementing 604.00 605.00 0
2006-03-28 Packing Device Capped w/Cement 580.00 594.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 51 0.0 0.0 0.0
1992 4241 0.0 0.0 0.0
1993 4763 0.0 0.0 0.0

For data sources see[5]

References