X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324273107000

Well Details

Well ID: 0324273107000
Loading map...
Location: 00/07-31-032-27W4/0
Location Alias: 00/07-31-32-27 W4M
Location Alias 2: 00/07-31-032-27 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 27
Section: 31
County/Municipality: Mountain View County
Well Name: BLACK CRANE 100 STEWART 7-31-32-27
Operator Name: Black Crane Energy Corp.
License Number: 0489470
License Date: 2018-06-05
License Status: Amended
Spud Date: 2018-07-02
Final Drill Date: 2018-07-07
Well Total Depth: 4453.00 m
Surface Hole Latitude: 51.808457
Surface Hole Longitude: -113.818851

For data sources see[1][2]

Well History

Date Event
2018-06-05 Obtained License
2018-07-04 Surface Casing Operation Performed
2018-07-06 Direction Drilling Operation Performed - Deviate
2018-07-07 Direction Drilling Operation Performed - Horizontal
2018-07-07 Finished Drilling
2018-07-07 Well Log Performed
2018-07-07 Well Mode changed to Drilled and Cased
2018-07-08 Intermediate Casing Operation Performed
2018-07-19 Well Log Performed
2018-07-23 Production Casing Operation Performed
2018-07-24 Rig Released
2018-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-26 Well Began Production
2018-08-26 Well Fluid changed to Crude Oil
2018-08-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-06 1723.10 Deviate (5 - 79 degrees)
2018-07-07 2127.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-12 Multi-Stage Fracture 4401.40 4401.50 0
2018-08-12 Multi-Stage Fracture 3721.30 3721.40 0
2018-08-12 Multi-Stage Fracture 3637.90 3638.00 0
2018-08-12 Multi-Stage Fracture 3554.70 3554.80 0
2018-08-12 Multi-Stage Fracture 3482.60 3482.70 0
2018-08-12 Multi-Stage Fracture 3410.40 3410.50 0
2018-08-12 Multi-Stage Fracture 3349.40 3349.50 0
2018-08-12 Multi-Stage Fracture 3266.20 3266.30 0
2018-08-12 Multi-Stage Fracture 3194.40 3194.50 0
2018-08-12 Multi-Stage Fracture 3110.90 3111.00 0
2018-08-12 Multi-Stage Fracture 3027.40 3027.50 0
2018-08-12 Multi-Stage Fracture 4341.10 4341.20 0
2018-08-13 Multi-Stage Fracture 2945.90 2946.00 0
2018-08-13 Multi-Stage Fracture 2861.90 2862.00 0
2018-08-13 Multi-Stage Fracture 2781.00 2781.10 0
2018-08-13 Multi-Stage Fracture 2699.40 2699.50 0
2018-08-13 Multi-Stage Fracture 2616.90 2617.00 0
2018-08-13 Multi-Stage Fracture 2536.20 2536.30 0
2018-08-13 Multi-Stage Fracture 2453.00 2453.10 0
2018-08-13 Multi-Stage Fracture 2369.70 2369.80 0
2018-08-13 Multi-Stage Fracture 2297.90 2298.00 0
2018-08-13 Multi-Stage Fracture 2237.00 2237.10 0
2018-08-12 Multi-Stage Fracture 4269.10 4269.20 0
2018-08-13 Multi-Stage Fracture 2187.50 2187.60 0
2018-08-12 Multi-Stage Fracture 4219.40 4219.50 0
2018-08-12 Multi-Stage Fracture 4136.20 4136.30 0
2018-08-12 Multi-Stage Fracture 4055.90 4056.00 0
2018-08-12 Multi-Stage Fracture 3959.20 3959.30 0
2018-08-12 Multi-Stage Fracture 3876.30 3876.40 0
2018-08-12 Multi-Stage Fracture 3782.30 3782.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-12 2018-08-13 1,999 4,221 N/A
2 2018-08-13 2018-08-13 1,999 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 87.1932 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.3442 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 8.6284 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.9455 N/A
Water 7732-18-5 100 0.9455 N/A
SAB-1 Acid Blend Step Energy Services Acid Acetic Acid 64-19-7 100 0.0104 N/A
Ethylene Glycol 107-21-1 100 0.0104 N/A
Methyl Alcohol 67-56-1 100 0.0104 N/A
Non Hazardous Ingredients Not Available 100 0.0104 N/A
Propan-2-ol 67-63-0 100 0.0104 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0071 N/A
Methyl Alcohol 67-56-1 100 0.0071 N/A
Non-Hazardous Ingredients Not Available 100 0.0071 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0096 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0797 N/A
Non-Hazardous Ingredients Not Available 100 0.0797 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.0369 N/A
Water 7732-18-5 100 0.0369 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.2235 N/A
SAS-7 (Anti-Sludge) Step Energy Services Surfactant Benzenesulfonic acid. C10-16-alkyl derivatives 68584-22-5 100 0.0047 N/A
Non-Hazardous Ingredients Not Available 100 0.0047 N/A
Propylene Glycol 57-55-6 100 0.0047 N/A
SNE-8 (Non-Emulsifier) Step Energy Services Surfactant Alkyl Aryl Sulfonic Acid Not Available 100 0.078 N/A
Alkyl Sulfate Not Available 100 0.078 N/A
Methanol 67-56-1 100 0.078 N/A
Polyalkylhydroxyl Alcohol Not Available 100 0.078 N/A
2 SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0117 N/A
Non-Hazardous Ingredients Not Available 100 0.0117 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0117 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 734 0.0 0.0 0.0
2019 2751 0.0 0.0 0.0
2020 1780 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-25 No Incident Encountered 0.00 0.00
2018-08-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References