X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0314271503003"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0314271503003
 
| Well ID: 0314271503003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.6512405, -113.7521622 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.651616, -113.751669 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/03-15-031-27W4/3
 +
|-
 +
| Location Alias: 00/03-15-31-27 W4M
 +
|-
 +
| Location Alias 2: 00/03-15-031-27 W4/03
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 031
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 27
 +
|-
 +
| Section: 15
 +
|-
 +
| County/Municipality: [[Mountain View County,_Alberta|Mountain View County]]
 
|-
 
|-
 
| Well Name: EMBER LPINECK 3-15-31-27
 
| Well Name: EMBER LPINECK 3-15-31-27
 
|-
 
|-
| Operator:
+
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0332878
 
|-
 
|-
 
| License Date: 2005-06-14
 
| License Date: 2005-06-14
 
|-
 
|-
| Final Drilling Date: 2005-06-29
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 1130.0m
+
| Spud Date: 2005-06-25
 
|-
 
|-
| Fluid Type: Not Applicable
+
| Final Drill Date: 2005-06-29
 
|-
 
|-
| Status: Not Applicable
+
| Well Total Depth: 1130.00 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 51.651616
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -113.751669
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-06-14
 +
| Obtained License
 +
|-
 +
| 2005-06-26
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2005-06-29
 +
| Finished Drilling
 +
|-
 +
| 2005-06-29
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2005-06-30
 +
| Production Casing Operation Performed
 
|-
 
|-
| Violations:
+
| 2005-06-30
 +
| Rig Released
 
|-
 
|-
| Latitude: 51.6512405
+
| 2005-07-05
 +
| Well Log Performed
 
|-
 
|-
| Longitude: -113.7521622
+
| 2005-07-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-07-20
 +
| Well Log Performed
 +
|-
 +
| 2005-07-23
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2005-11-16
 +
| Well Began Production
 +
|-
 +
| 2005-11-16
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2005-11-16
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2006-08-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-08-01
 +
| Well Log Performed
 +
|-
 +
| 2006-08-03
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-09-11
 +
| Well Structure changed to Commingled
 +
|-
 +
| 2007-06-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2007-06-30
 +
| Well Log Performed
 +
|-
 +
| 2007-07-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2007-07-08
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2005-07-20
 +
| Perforation
 +
| style="text-align: right;" | 503.00
 +
| style="text-align: right;" | 508.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 523.90
 +
| style="text-align: right;" | 524.40
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 584.00
 +
| style="text-align: right;" | 584.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 672.30
 +
| style="text-align: right;" | 672.80
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 687.00
 +
| style="text-align: right;" | 688.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 719.80
 +
| style="text-align: right;" | 720.80
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 725.80
 +
| style="text-align: right;" | 726.80
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 739.10
 +
| style="text-align: right;" | 740.10
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 748.50
 +
| style="text-align: right;" | 749.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-03
 +
| Fracture
 +
| style="text-align: right;" | 336.60
 +
| style="text-align: right;" | 461.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-08-03
 +
| Fracture
 +
| style="text-align: right;" | 523.90
 +
| style="text-align: right;" | 584.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-07-20
 +
| Perforation
 +
| style="text-align: right;" | 626.00
 +
| style="text-align: right;" | 631.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-03
 +
| Fracture
 +
| style="text-align: right;" | 672.30
 +
| style="text-align: right;" | 749.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 345.00
 +
| style="text-align: right;" | 346.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 362.50
 +
| style="text-align: right;" | 363.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 471.00
 +
| style="text-align: right;" | 472.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 480.20
 +
| style="text-align: right;" | 480.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 575.60
 +
| style="text-align: right;" | 576.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 588.50
 +
| style="text-align: right;" | 589.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 609.20
 +
| style="text-align: right;" | 609.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 640.30
 +
| style="text-align: right;" | 640.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 715.80
 +
| style="text-align: right;" | 716.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2005-07-20
 +
| Perforation
 +
| style="text-align: right;" | 897.00
 +
| style="text-align: right;" | 901.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2007-06-30
 +
| Perforation
 +
| style="text-align: right;" | 750.20
 +
| style="text-align: right;" | 751.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2007-07-01
 +
| Fracture
 +
| style="text-align: right;" | 345.00
 +
| style="text-align: right;" | 369.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-07-01
 +
| Fracture
 +
| style="text-align: right;" | 626.00
 +
| style="text-align: right;" | 631.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-07-08
 +
| Fracture
 +
| style="text-align: right;" | 460.60
 +
| style="text-align: right;" | 480.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2007-07-08
 +
| Fracture
 +
| style="text-align: right;" | 523.90
 +
| style="text-align: right;" | 751.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-07-20
 +
| Perforation
 +
| style="text-align: right;" | 973.00
 +
| style="text-align: right;" | 978.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-07-20
 +
| Perforation
 +
| style="text-align: right;" | 1084.00
 +
| style="text-align: right;" | 1089.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-07-23
 +
| Fracture
 +
| style="text-align: right;" | 503.00
 +
| style="text-align: right;" | 1089.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 336.60
 +
| style="text-align: right;" | 337.10
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 369.30
 +
| style="text-align: right;" | 369.80
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-08-01
 +
| Perforation
 +
| style="text-align: right;" | 460.60
 +
| style="text-align: right;" | 461.60
 +
| style="text-align: right;" | 17
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2005
 +
| style="text-align: right;" | 894
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 5068
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:29, 30 January 2021

Well Details

Well ID: 0314271503003
Loading map...
Location: 00/03-15-031-27W4/3
Location Alias: 00/03-15-31-27 W4M
Location Alias 2: 00/03-15-031-27 W4/03
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 27
Section: 15
County/Municipality: Mountain View County
Well Name: EMBER LPINECK 3-15-31-27
Operator Name: Ember Resources Inc.
License Number: 0332878
License Date: 2005-06-14
License Status: Issued
Spud Date: 2005-06-25
Final Drill Date: 2005-06-29
Well Total Depth: 1130.00 m
Surface Hole Latitude: 51.651616
Surface Hole Longitude: -113.751669

For data sources see[1][2]

Well History

Date Event
2005-06-14 Obtained License
2005-06-26 Surface Casing Operation Performed
2005-06-29 Finished Drilling
2005-06-29 Well Mode changed to Drilled and Cased
2005-06-30 Production Casing Operation Performed
2005-06-30 Rig Released
2005-07-05 Well Log Performed
2005-07-20 Perforation Treatment Performed - Jet Perforation
2005-07-20 Well Log Performed
2005-07-23 Perforation Treatment Performed - Fractured
2005-11-16 Well Began Production
2005-11-16 Well Fluid changed to Gas
2005-11-16 Well Mode changed to Flowing
2006-08-01 Perforation Treatment Performed - Jet Perforation
2006-08-01 Well Log Performed
2006-08-03 Perforation Treatment Performed - Fractured
2006-09-11 Well Structure changed to Commingled
2007-06-30 Perforation Treatment Performed - Jet Perforation
2007-06-30 Well Log Performed
2007-07-01 Perforation Treatment Performed - Fractured
2007-07-08 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-20 Perforation 503.00 508.00 17
2006-08-01 Perforation 523.90 524.40 17
2006-08-01 Perforation 584.00 584.50 17
2006-08-01 Perforation 672.30 672.80 17
2006-08-01 Perforation 687.00 688.00 17
2006-08-01 Perforation 719.80 720.80 17
2006-08-01 Perforation 725.80 726.80 17
2006-08-01 Perforation 739.10 740.10 17
2006-08-01 Perforation 748.50 749.00 17
2006-08-03 Fracture 336.60 461.60 0
2006-08-03 Fracture 523.90 584.50 0
2005-07-20 Perforation 626.00 631.00 17
2006-08-03 Fracture 672.30 749.00 0
2007-06-30 Perforation 345.00 346.00 13
2007-06-30 Perforation 362.50 363.00 13
2007-06-30 Perforation 471.00 472.00 13
2007-06-30 Perforation 480.20 480.70 13
2007-06-30 Perforation 575.60 576.10 13
2007-06-30 Perforation 588.50 589.00 13
2007-06-30 Perforation 609.20 609.70 13
2007-06-30 Perforation 640.30 640.80 13
2007-06-30 Perforation 715.80 716.30 13
2005-07-20 Perforation 897.00 901.00 17
2007-06-30 Perforation 750.20 751.20 13
2007-07-01 Fracture 345.00 369.80 0
2007-07-01 Fracture 626.00 631.00 0
2007-07-08 Fracture 460.60 480.70 0
2007-07-08 Fracture 523.90 751.20 0
2005-07-20 Perforation 973.00 978.00 17
2005-07-20 Perforation 1084.00 1089.00 17
2005-07-23 Fracture 503.00 1089.00 0
2006-08-01 Perforation 336.60 337.10 17
2006-08-01 Perforation 369.30 369.80 17
2006-08-01 Perforation 460.60 461.60 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 894 0.0 0.0 0.0
2006 5068 0.0 0.0 0.0

For data sources see[5]

References