X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314263007020

Well Details

Well ID: 0314263007020
Loading map...
Location: 02/07-30-031-26W4/0
Location Alias: 02/07-30-31-26 W4M
Location Alias 2: 02/07-30-031-26 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 26
Section: 30
County/Municipality: Mountain View County
Well Name: HURON RES HZ 102 WORKMAN 7-30-31-26
Operator Name: Huron Resources Corp.
License Number: 0492288
License Date: 2018-11-26
License Status: Issued
Spud Date: 2019-01-04
Final Drill Date: 2019-01-27
Well Total Depth: 4648.00 m
Surface Hole Latitude: 51.664283
Surface Hole Longitude: -113.654102

For data sources see[1][2]

Well History

Date Event
2018-11-26 Obtained License
2019-01-05 Surface Casing Operation Performed
2019-01-08 Direction Drilling Operation Performed - Deviate
2019-01-11 Direction Drilling Operation Performed - Horizontal
2019-01-27 Finished Drilling
2019-01-27 Well Mode changed to Drilled and Cased
2019-01-28 Production Casing Operation Performed
2019-01-28 Well Log Performed
2019-01-29 Rig Released
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-13 Perforation Treatment Performed - Jet Perforation
2019-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-14 Perforation Treatment Performed - Jet Perforation
2019-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-15 Perforation Treatment Performed - Jet Perforation
2019-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-17 Well Fluid changed to Crude Oil
2019-03-17 Well Mode changed to Drilling and Completing
2019-04-26 Well Began Production
2019-04-26 Well Fluid changed to Crude Oil
2019-04-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-03 Ironhand Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-08 1900.60 Deviate (5 - 79 degrees)
2019-01-11 2329.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-12 Multi-Stage Fracture 4591.00 4606.10 0
2019-03-13 Perforation 3980.70 3981.70 12
2019-03-13 Perforation 3940.00 3941.00 12
2019-03-13 Multi-Stage Fracture 3940.00 3981.70 0
2019-03-13 Perforation 3818.10 3819.10 12
2019-03-13 Perforation 3858.70 3859.70 12
2019-03-13 Multi-Stage Fracture 3818.10 3859.70 0
2019-03-13 Perforation 3717.00 3718.00 12
2019-03-13 Perforation 3720.00 3721.00 12
2019-03-14 Multi-Stage Fracture 3717.00 3721.00 0
2019-03-14 Perforation 3593.30 3594.30 12
2019-03-12 Perforation 4465.20 4466.20 20
2019-03-14 Perforation 3596.30 3597.30 12
2019-03-14 Multi-Stage Fracture 3593.30 3597.30 0
2019-03-14 Perforation 3472.20 3473.20 12
2019-03-14 Perforation 3469.20 3470.20 12
2019-03-14 Multi-Stage Fracture 3469.20 3473.20 0
2019-03-14 Perforation 3345.10 3346.10 12
2019-03-14 Perforation 3348.10 3349.10 12
2019-03-14 Multi-Stage Fracture 3345.10 3349.10 0
2019-03-15 Perforation 3208.00 3209.00 12
2019-03-15 Perforation 3249.00 3250.00 12
2019-03-13 Multi-Stage Fracture 4465.20 4466.20 0
2019-03-15 Multi-Stage Fracture 3208.00 3250.00 0
2019-03-15 Perforation 3087.00 3088.00 12
2019-03-15 Perforation 3128.00 3129.00 12
2019-03-15 Multi-Stage Fracture 3087.00 3129.00 0
2019-03-15 Perforation 2964.60 2965.60 12
2019-03-15 Perforation 3005.30 3006.30 12
2019-03-15 Multi-Stage Fracture 2964.60 3006.30 0
2019-03-15 Perforation 2883.30 2884.30 12
2019-03-15 Perforation 2842.70 2843.70 12
2019-03-15 Multi-Stage Fracture 2842.70 2884.30 0
2019-03-13 Perforation 4341.10 4342.10 20
2019-03-15 Perforation 2761.40 2762.40 12
2019-03-15 Perforation 2720.80 2721.80 12
2019-03-15 Multi-Stage Fracture 2720.80 2762.40 0
2019-03-15 Perforation 2639.50 2640.50 12
2019-03-15 Perforation 2598.80 2599.80 12
2019-03-15 Multi-Stage Fracture 2598.80 2640.50 0
2019-03-15 Perforation 2476.90 2477.90 12
2019-03-15 Perforation 2517.60 2518.60 12
2019-03-15 Multi-Stage Fracture 2476.90 2518.60 0
2019-03-15 Perforation 2358.00 2359.00 12
2019-03-13 Multi-Stage Fracture 4341.10 4342.10 0
2019-03-15 Perforation 2355.00 2356.00 12
2019-03-15 Multi-Stage Fracture 2355.00 2359.00 0
2019-03-13 Perforation 4217.00 4218.00 20
2019-03-13 Multi-Stage Fracture 4217.00 4218.00 0
2019-03-13 Perforation 4092.80 4093.80 20
2019-03-13 Multi-Stage Fracture 4092.80 4093.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-12 2019-03-15 2,213 3,257 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 15.4521 N/A
water Not Available 100 40.7092 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0072 N/A
dibromoacetonitrile 3252-43-5 100 0.0072 N/A
non-hazardous ingredients Not Available 100 0.0072 N/A
polyethylene glycol 25322-68-3 100 0.0072 N/A
sodium bromide 7647-15-6 100 0.0072 N/A
pH- 2 Trican Buffer acetic acid 64-19-7 100 1.7849 N/A
water Not Available 100 1.7849 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0158 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0209 N/A
potassium iodide 7681-11-0 100 0.0209 N/A
propargyl alcohol 107-19-7 100 0.0209 N/A
propargyl alcohol derivative 38172-91-7 100 0.0209 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0207 N/A
propylene glycol 57-55-6 100 0.0207 N/A
FR-1s Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0547 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0419 N/A
SI-10 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0243 N/A
ASA-31 Trican Surfactant amines. tallow alkyl. ethoxylated 61791-26-2 100 0.2868 N/A
dipropylene glycol monomethyl ether 34590-94-8 100 0.2868 N/A
isopropanol 67-63-0 100 0.2868 N/A
quat. ammonium compounds. dicoco alkyldimethyl. chorides 61789-77-3 100 0.2868 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-04 2019-03-09 Central Water Distribution Facility 269
2019-03-03 2019-03-12 Central Water Distribution Facility 1374
2019-03-04 2019-03-14 Municipal Water 524
2019-02-22 2019-03-15 Municipal Water 555
2019-02-22 2019-03-09 Municipal Water 505
2019-03-03 2019-03-16 Municipal Water 425
2019-03-14 2019-03-14 Municipal Water 32

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4758 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-27 No Incident Encountered 0.00 0.00
2019-03-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References