X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0314261704002"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0314261704002
 
| Well ID: 0314261704002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.6507956, -113.6634035 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.651533, -113.662605 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/04-17-031-26W4/2
 +
|-
 +
| Location Alias: 00/04-17-31-26 W4M
 +
|-
 +
| Location Alias 2: 00/04-17-031-26 W4/02
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 031
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 17
 +
|-
 +
| County/Municipality: [[Mountain View County,_Alberta|Mountain View County]]
 
|-
 
|-
 
| Well Name: EMBER WORKMAN 4-17-31-26
 
| Well Name: EMBER WORKMAN 4-17-31-26
 
|-
 
|-
| Operator:
+
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0327939
 
|-
 
|-
 
| License Date: 2005-03-11
 
| License Date: 2005-03-11
 
|-
 
|-
| Final Drilling Date: 2005-08-05
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2005-08-01
 +
|-
 +
| Final Drill Date: 2005-08-05
 +
|-
 +
| Well Total Depth: 1084.00 m
 +
|-
 +
| Surface Hole Latitude: 51.651533
 +
|-
 +
| Surface Hole Longitude: -113.662605
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Total Depth: 1084.0m
+
| 2005-03-11
 +
| Obtained License
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2005-05-27
 +
| Well Log Performed
 
|-
 
|-
| Status: Not Applicable
+
| 2005-08-02
 +
| Lost Circulation Occurred
 
|-
 
|-
| Well Type: Not Applicable
+
| 2005-08-02
 +
| Surface Casing Operation Performed
 
|-
 
|-
| Configuration: Vertical
+
| 2005-08-05
 +
| Finished Drilling
 
|-
 
|-
| Violations:
+
| 2005-08-05
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Latitude: 51.6507956
+
| 2005-08-06
 +
| Production Casing Operation Performed
 
|-
 
|-
| Longitude: -113.6634035
+
| 2005-08-06
 +
| Rig Released
 +
|-
 +
| 2005-08-06
 +
| Well Log Performed
 +
|-
 +
| 2005-08-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-08-13
 +
| Well Log Performed
 +
|-
 +
| 2005-08-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-08-30
 +
| Well Log Performed
 +
|-
 +
| 2005-09-01
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-05-18
 +
| Well Log Performed
 +
|-
 +
| 2006-05-19
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2006-05-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2006-06-19
 +
| Well Log Performed
 +
|-
 +
| 2017-04-05
 +
| Well Structure changed to Commingled
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 796.00
 +
| style="text-align: right;" | 801.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-09-01
 +
| Fracture
 +
| style="text-align: right;" | 381.00
 +
| style="text-align: right;" | 637.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 285.10
 +
| style="text-align: right;" | 286.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 293.10
 +
| style="text-align: right;" | 293.60
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 326.00
 +
| style="text-align: right;" | 326.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 415.80
 +
| style="text-align: right;" | 416.30
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 428.20
 +
| style="text-align: right;" | 428.70
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 443.80
 +
| style="text-align: right;" | 444.30
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 546.00
 +
| style="text-align: right;" | 547.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 556.60
 +
| style="text-align: right;" | 557.10
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 604.40
 +
| style="text-align: right;" | 605.40
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 817.50
 +
| style="text-align: right;" | 820.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 623.90
 +
| style="text-align: right;" | 624.40
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 630.40
 +
| style="text-align: right;" | 630.90
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 648.10
 +
| style="text-align: right;" | 650.10
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 686.10
 +
| style="text-align: right;" | 687.60
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 691.30
 +
| style="text-align: right;" | 691.80
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 695.00
 +
| style="text-align: right;" | 696.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 700.50
 +
| style="text-align: right;" | 701.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 704.60
 +
| style="text-align: right;" | 705.60
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 711.00
 +
| style="text-align: right;" | 711.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-19
 +
| Perforation
 +
| style="text-align: right;" | 713.30
 +
| style="text-align: right;" | 713.80
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 838.00
 +
| style="text-align: right;" | 839.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2006-05-20
 +
| Fracture
 +
| style="text-align: right;" | 285.10
 +
| style="text-align: right;" | 326.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-20
 +
| Fracture
 +
| style="text-align: right;" | 415.80
 +
| style="text-align: right;" | 557.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-20
 +
| Fracture
 +
| style="text-align: right;" | 604.40
 +
| style="text-align: right;" | 630.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2006-05-20
 +
| Fracture
 +
| style="text-align: right;" | 648.00
 +
| style="text-align: right;" | 713.80
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 934.00
 +
| style="text-align: right;" | 937.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 381.00
 +
| style="text-align: right;" | 385.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 584.00
 +
| style="text-align: right;" | 585.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-13
 +
| Perforation
 +
| style="text-align: right;" | 632.00
 +
| style="text-align: right;" | 637.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-08-30
 +
| Perforation
 +
| style="text-align: right;" | 1024.00
 +
| style="text-align: right;" | 1027.00
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2005-09-01
 +
| Fracture
 +
| style="text-align: right;" | 796.00
 +
| style="text-align: right;" | 937.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2005-08-02
 +
| Lost Circulation
 +
| style="text-align: right;" | 85.00
 +
| style="text-align: right;" | 134.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 18:14, 30 January 2021

Well Details

Well ID: 0314261704002
Loading map...
Location: 00/04-17-031-26W4/2
Location Alias: 00/04-17-31-26 W4M
Location Alias 2: 00/04-17-031-26 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 26
Section: 17
County/Municipality: Mountain View County
Well Name: EMBER WORKMAN 4-17-31-26
Operator Name: Ember Resources Inc.
License Number: 0327939
License Date: 2005-03-11
License Status: Issued
Spud Date: 2005-08-01
Final Drill Date: 2005-08-05
Well Total Depth: 1084.00 m
Surface Hole Latitude: 51.651533
Surface Hole Longitude: -113.662605

For data sources see[1][2]

Well History

Date Event
2005-03-11 Obtained License
2005-05-27 Well Log Performed
2005-08-02 Lost Circulation Occurred
2005-08-02 Surface Casing Operation Performed
2005-08-05 Finished Drilling
2005-08-05 Well Mode changed to Drilled and Cased
2005-08-06 Production Casing Operation Performed
2005-08-06 Rig Released
2005-08-06 Well Log Performed
2005-08-13 Perforation Treatment Performed - Jet Perforation
2005-08-13 Well Log Performed
2005-08-30 Perforation Treatment Performed - Jet Perforation
2005-08-30 Well Log Performed
2005-09-01 Perforation Treatment Performed - Fractured
2006-05-18 Well Log Performed
2006-05-19 Perforation Treatment Performed - Jet Perforation
2006-05-20 Perforation Treatment Performed - Fractured
2006-06-19 Well Log Performed
2017-04-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-13 Perforation 796.00 801.00 17
2005-09-01 Fracture 381.00 637.00 0
2006-05-19 Perforation 285.10 286.50 17
2006-05-19 Perforation 293.10 293.60 17
2006-05-19 Perforation 326.00 326.50 17
2006-05-19 Perforation 415.80 416.30 17
2006-05-19 Perforation 428.20 428.70 17
2006-05-19 Perforation 443.80 444.30 17
2006-05-19 Perforation 546.00 547.00 17
2006-05-19 Perforation 556.60 557.10 17
2006-05-19 Perforation 604.40 605.40 17
2005-08-13 Perforation 817.50 820.00 17
2006-05-19 Perforation 623.90 624.40 17
2006-05-19 Perforation 630.40 630.90 17
2006-05-19 Perforation 648.10 650.10 17
2006-05-19 Perforation 686.10 687.60 17
2006-05-19 Perforation 691.30 691.80 17
2006-05-19 Perforation 695.00 696.00 17
2006-05-19 Perforation 700.50 701.50 17
2006-05-19 Perforation 704.60 705.60 17
2006-05-19 Perforation 711.00 711.50 17
2006-05-19 Perforation 713.30 713.80 17
2005-08-13 Perforation 838.00 839.00 17
2006-05-20 Fracture 285.10 326.50 0
2006-05-20 Fracture 415.80 557.10 0
2006-05-20 Fracture 604.40 630.90 0
2006-05-20 Fracture 648.00 713.80 0
2005-08-13 Perforation 934.00 937.00 17
2005-08-13 Perforation 381.00 385.00 17
2005-08-13 Perforation 584.00 585.00 17
2005-08-13 Perforation 632.00 637.00 17
2005-08-30 Perforation 1024.00 1027.00 17
2005-09-01 Fracture 796.00 937.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-08-02 Lost Circulation 85.00 134.00

For data sources see[5]

References