If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314250613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.632737,"lon":-113.534791,"icon":""}]} |
Location: 00/13-06-031-25W4/0 | |
Location Alias: 00/13-06-31-25 W4M | |
Location Alias 2: 00/13-06-031-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 13-6-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423967 | |
License Date: 2010-09-28 | |
License Status: Amended | |
Spud Date: 2010-11-07 | |
Final Drill Date: 2010-11-08 | |
Well Total Depth: 1178.00 m | |
Surface Hole Latitude: 51.632737 | |
Surface Hole Longitude: -113.534791 |
Date | Event |
---|---|
2010-09-28 | Obtained License |
2010-11-07 | Surface Casing Operation Performed |
2010-11-08 | Direction Drilling Operation Performed - Deviate |
2010-11-08 | Finished Drilling |
2010-11-08 | Well Mode changed to Drilled and Cased |
2010-11-09 | Production Casing Operation Performed |
2010-11-09 | Rig Released |
2010-11-09 | Well Log Performed |
2010-11-26 | Perforation Treatment Performed - Jet Perforation |
2010-12-01 | Perforation Treatment Performed - Fractured |
2010-12-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-04 | Well Mode changed to Testing |
2011-02-15 | Well Began Production |
2011-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-15 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-08 | 725.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-26 | Perforation | 614.20 | 615.20 | 13 |
2010-11-26 | Perforation | 701.50 | 702.50 | 13 |
2010-11-26 | Perforation | 444.20 | 444.70 | 13 |
2010-11-26 | Perforation | 521.30 | 521.80 | 13 |
2010-11-26 | Perforation | 471.10 | 471.60 | 13 |
2010-11-26 | Perforation | 453.60 | 454.10 | 13 |
2010-11-26 | Perforation | 812.80 | 813.80 | 13 |
2010-11-26 | Perforation | 800.70 | 802.70 | 13 |
2010-11-26 | Perforation | 797.50 | 799.00 | 13 |
2010-11-26 | Perforation | 893.20 | 896.20 | 13 |
2010-11-26 | Perforation | 820.30 | 820.80 | 13 |
2010-11-26 | Perforation | 610.10 | 612.10 | 13 |
2010-11-26 | Perforation | 818.00 | 818.50 | 13 |
2010-11-26 | Perforation | 782.50 | 785.50 | 13 |
2010-11-26 | Perforation | 690.20 | 691.70 | 13 |
2010-11-26 | Perforation | 745.30 | 745.80 | 13 |
2010-11-26 | Perforation | 746.50 | 747.50 | 13 |
2010-11-26 | Perforation | 749.00 | 749.50 | 13 |
2010-11-26 | Perforation | 764.10 | 765.60 | 13 |
2010-11-26 | Perforation | 751.40 | 751.90 | 13 |
2010-12-01 | Fracture | 701.50 | 710.50 | 0 |
2010-12-01 | Fracture | 802.30 | 818.50 | 0 |
2010-11-26 | Perforation | 605.20 | 605.70 | 13 |
2010-12-01 | Fracture | 745.30 | 802.70 | 0 |
2010-12-01 | Fracture | 444.20 | 691.70 | 0 |
2010-11-26 | Perforation | 618.00 | 619.00 | 13 |
2010-11-26 | Perforation | 669.40 | 670.40 | 13 |
2010-11-26 | Perforation | 659.80 | 660.80 | 13 |
2010-11-26 | Perforation | 626.60 | 627.10 | 13 |
2010-11-26 | Perforation | 709.00 | 710.50 | 13 |
2010-11-26 | Perforation | 705.00 | 708.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 7666 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]