X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314181602002

Well Details

Well ID: 0314181602002
Loading map...
Location: 00/02-16-031-18W4/2
Location Alias: 00/02-16-31-18 W4M
Location Alias 2: 00/02-16-031-18 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 18
Section: 16
County/Municipality: Starland County
Well Name: CELTIC MICHICHI 2-16-31-18
Operator Name: XTO Energy Canada ULC
License Number: 0243612
License Date: 2000-10-26
License Status: Suspension
Spud Date: 2000-10-30
Final Drill Date: 2000-11-03
Well Total Depth: 1392.00 m
Surface Hole Latitude: 51.651985
Surface Hole Longitude: -112.492372

For data sources see[1][2]

Well History

Date Event
2000-10-26 Obtained License
2000-10-31 Surface Casing Operation Performed
2000-11-03 Finished Drilling
2000-11-03 Well Log Performed
2000-11-03 Well Mode changed to Drilled and Cased
2000-11-05 Production Casing Operation Performed
2000-11-05 Rig Released
2000-11-14 Well Log Performed
2000-11-17 Perforation Treatment Performed - Jet Perforation
2000-11-17 Well Log Performed
2000-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-30 Plug Back Performed
2000-11-30 Well Log Performed
2000-12-05 Perforation Treatment Performed - Jet Perforation
2000-12-05 Well Log Performed
2000-12-06 Perforation Treatment Performed - Fractured
2001-02-01 Well Began Production
2001-02-01 Well Fluid changed to Gas
2001-02-01 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Gas
2013-11-01 Well Mode changed to Suspended
2014-06-11 Well Fluid changed to Gas
2014-06-11 Well Mode changed to Flowing
2015-06-01 Well Fluid changed to Gas
2015-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-17 Perforation 1367.00 1374.00 14
2000-11-17 Perforation 1360.00 1364.00 14
2000-11-18 Acid Treatment 1360.00 1374.00 0
2000-11-26 Acid Treatment 1360.00 1374.00 0
2000-11-30 Packing Device Capped w/Cement 1342.00 1350.00 0
2000-12-05 Perforation 1310.00 1315.00 14
2000-12-06 Fracture 1310.00 1315.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2493 0.0 0.0 0.0
2002 4097 0.0 0.0 0.0
2003 6518 0.0 0.0 0.0
2004 6031 0.0 0.0 0.0
2005 5722 0.0 0.0 0.0
2006 7594 0.0 0.0 0.0
2007 8204 0.0 0.0 0.0
2008 8168 0.0 0.0 0.0
2009 8457 0.0 0.0 0.0
2010 8336 0.0 0.0 0.0
2011 5255 0.0 0.0 0.0
2012 4592 0.0 0.0 0.0
2014 432 0.0 0.0 0.0
2015 1 0.0 0.0 0.0

For data sources see[5]

References