If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304253303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.608323,"lon":-113.466811,"icon":""}]} |
Location: 00/03-33-030-25W4/0 | |
Location Alias: 00/03-33-30-25 W4M | |
Location Alias 2: 00/03-33-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 33 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 3-33-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423277 | |
License Date: 2010-09-07 | |
License Status: Issued | |
Spud Date: 2010-12-02 | |
Final Drill Date: 2010-12-07 | |
Well Total Depth: 960.00 m | |
Surface Hole Latitude: 51.608323 | |
Surface Hole Longitude: -113.466811 |
Date | Event |
---|---|
2010-09-07 | Obtained License |
2010-12-02 | Surface Casing Operation Performed |
2010-12-07 | Finished Drilling |
2010-12-07 | Production Casing Operation Performed |
2010-12-07 | Rig Released |
2010-12-07 | Well Mode changed to Drilled and Cased |
2010-12-13 | Well Log Performed |
2011-01-17 | Perforation Treatment Performed - Jet Perforation |
2011-02-24 | Perforation Treatment Performed - Fractured |
2011-02-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-27 | Well Mode changed to Testing |
2011-03-05 | Well Began Production |
2011-03-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-17 | Perforation | 481.70 | 482.20 | 13 |
2011-01-17 | Perforation | 493.70 | 494.70 | 13 |
2011-01-17 | Perforation | 362.00 | 364.00 | 13 |
2011-01-17 | Perforation | 501.00 | 502.50 | 13 |
2011-01-17 | Perforation | 466.20 | 467.20 | 13 |
2011-01-17 | Perforation | 465.30 | 465.80 | 13 |
2011-01-17 | Perforation | 460.60 | 461.60 | 13 |
2011-01-17 | Perforation | 536.00 | 536.50 | 13 |
2011-01-17 | Perforation | 627.50 | 628.00 | 13 |
2011-01-17 | Perforation | 623.40 | 623.90 | 13 |
2011-01-17 | Perforation | 622.40 | 622.90 | 13 |
2011-01-17 | Perforation | 478.60 | 479.10 | 13 |
2011-01-17 | Perforation | 628.90 | 629.40 | 13 |
2011-01-17 | Perforation | 923.00 | 924.00 | 13 |
2011-01-17 | Perforation | 877.80 | 878.80 | 13 |
2011-01-17 | Perforation | 633.70 | 634.70 | 13 |
2011-01-17 | Perforation | 562.70 | 563.70 | 13 |
2011-01-17 | Perforation | 594.10 | 595.10 | 13 |
2011-01-17 | Perforation | 589.80 | 591.30 | 13 |
2011-01-17 | Perforation | 578.10 | 579.10 | 13 |
2011-01-17 | Perforation | 603.40 | 604.40 | 13 |
2011-01-17 | Perforation | 612.80 | 613.30 | 13 |
2011-01-17 | Perforation | 473.60 | 474.10 | 13 |
2011-01-17 | Perforation | 607.60 | 608.10 | 13 |
2011-02-24 | Fracture | 362.00 | 502.50 | 0 |
2011-02-24 | Fracture | 622.40 | 634.70 | 0 |
2011-02-24 | Fracture | 460.60 | 613.30 | 0 |
2011-01-17 | Perforation | 514.40 | 514.90 | 13 |
2011-01-17 | Perforation | 529.60 | 532.60 | 13 |
2011-01-17 | Perforation | 522.60 | 523.10 | 13 |
2011-01-17 | Perforation | 517.10 | 518.10 | 13 |
2011-01-17 | Perforation | 469.10 | 470.60 | 13 |
2011-01-17 | Perforation | 497.60 | 499.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7259 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8758 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]