If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304253113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.61899,"lon":-113.515651,"icon":""}]} |
Location: 00/13-31-030-25W4/0 | |
Location Alias: 00/13-31-30-25 W4M | |
Location Alias 2: 00/13-31-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 31 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 13-31-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422648 | |
License Date: 2010-08-13 | |
License Status: Issued | |
Spud Date: 2010-10-14 | |
Final Drill Date: 2010-10-21 | |
Well Total Depth: 973.00 m | |
Surface Hole Latitude: 51.618990 | |
Surface Hole Longitude: -113.515651 |
Date | Event |
---|---|
2010-08-13 | Obtained License |
2010-10-14 | Surface Casing Operation Performed |
2010-10-21 | Finished Drilling |
2010-10-21 | Production Casing Operation Performed |
2010-10-21 | Rig Released |
2010-10-21 | Well Mode changed to Drilled and Cased |
2010-10-23 | Well Log Performed |
2010-11-06 | Perforation Treatment Performed - Jet Perforation |
2010-11-08 | Perforation Treatment Performed - Fractured |
2010-11-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-11 | Well Mode changed to Testing |
2011-01-05 | Well Began Production |
2011-01-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-06 | Perforation | 517.20 | 518.20 | 13 |
2010-11-06 | Perforation | 364.40 | 365.40 | 13 |
2010-11-06 | Perforation | 450.20 | 451.20 | 13 |
2010-11-06 | Perforation | 455.50 | 457.00 | 13 |
2010-11-06 | Perforation | 468.80 | 469.30 | 13 |
2010-11-06 | Perforation | 470.00 | 471.50 | 13 |
2010-11-06 | Perforation | 386.00 | 386.50 | 13 |
2010-11-06 | Perforation | 465.90 | 466.40 | 13 |
2010-11-06 | Perforation | 667.00 | 668.00 | 13 |
2010-11-06 | Perforation | 613.60 | 614.60 | 13 |
2010-11-06 | Perforation | 612.00 | 612.50 | 13 |
2010-11-06 | Perforation | 532.80 | 533.30 | 13 |
2010-11-06 | Perforation | 622.90 | 623.90 | 13 |
2010-11-06 | Perforation | 636.90 | 637.40 | 13 |
2010-11-06 | Perforation | 628.30 | 628.80 | 13 |
2010-11-06 | Perforation | 624.70 | 625.20 | 13 |
2010-11-06 | Perforation | 583.40 | 583.90 | 13 |
2010-11-06 | Perforation | 588.00 | 589.00 | 13 |
2010-11-06 | Perforation | 580.00 | 580.50 | 13 |
2010-11-06 | Perforation | 581.70 | 583.20 | 13 |
2010-11-06 | Perforation | 608.30 | 609.30 | 13 |
2010-11-06 | Perforation | 611.00 | 611.50 | 13 |
2010-11-06 | Perforation | 472.40 | 472.90 | 13 |
2010-11-06 | Perforation | 597.00 | 599.50 | 13 |
2010-11-08 | Fracture | 450.20 | 457.00 | 0 |
2010-11-08 | Fracture | 357.80 | 386.50 | 0 |
2010-11-08 | Fracture | 622.90 | 625.20 | 0 |
2010-11-08 | Fracture | 636.90 | 637.40 | 0 |
2010-11-08 | Fracture | 465.90 | 614.60 | 0 |
2010-11-06 | Perforation | 473.80 | 474.30 | 13 |
2010-11-06 | Perforation | 568.60 | 569.10 | 13 |
2010-11-06 | Perforation | 570.90 | 571.90 | 13 |
2010-11-06 | Perforation | 536.40 | 536.90 | 13 |
2010-11-06 | Perforation | 537.90 | 538.40 | 13 |
2010-11-06 | Perforation | 357.80 | 358.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8650 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]