If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294252310022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.498881,"lon":-113.410098,"icon":""}]} |
Location: 02/10-23-029-25W4/2 | |
Location Alias: 02/10-23-29-25 W4M | |
Location Alias 2: 02/10-23-029-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 25 | |
Section: 23 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 SWALWELL 10-23-29-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0334971 | |
License Date: 2005-07-21 | |
License Status: Issued | |
Spud Date: 2005-07-25 | |
Final Drill Date: 2005-07-29 | |
Well Total Depth: 1515.00 m | |
Surface Hole Latitude: 51.498881 | |
Surface Hole Longitude: -113.410098 |
Date | Event |
---|---|
2005-07-21 | Obtained License |
2005-07-26 | Surface Casing Operation Performed |
2005-07-29 | Finished Drilling |
2005-07-29 | Well Mode changed to Drilled and Cased |
2005-07-30 | Production Casing Operation Performed |
2005-07-30 | Rig Released |
2005-08-05 | Well Log Performed |
2005-08-07 | Perforation Treatment Performed - Jet Perforation |
2005-08-09 | Perforation Treatment Performed - Fractured |
2017-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-06-08 | Plug Back Performed |
2017-06-30 | Perforation Treatment Performed - Jet Perforation |
2017-06-30 | Well Log Performed |
2017-07-19 | Perforation Treatment Performed - Fractured |
2017-08-04 | Well Began Production |
2017-08-04 | Well Fluid changed to Gas |
2017-08-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-07 | Perforation | 1451.00 | 1455.00 | 17 |
2017-06-30 | Perforation | 453.50 | 454.50 | 13 |
2017-06-30 | Perforation | 472.30 | 475.30 | 13 |
2017-06-30 | Perforation | 482.00 | 483.00 | 13 |
2017-06-30 | Perforation | 517.60 | 518.60 | 13 |
2017-06-30 | Perforation | 523.00 | 524.50 | 13 |
2017-06-30 | Perforation | 534.00 | 535.00 | 13 |
2017-06-30 | Perforation | 543.90 | 544.90 | 13 |
2017-06-30 | Perforation | 549.60 | 551.60 | 13 |
2017-06-30 | Perforation | 564.00 | 565.00 | 13 |
2017-06-30 | Perforation | 630.00 | 631.00 | 13 |
2005-08-09 | Fracture | 1451.00 | 1455.00 | 0 |
2017-07-19 | Fracture | 282.00 | 283.00 | 0 |
2017-07-19 | Fracture | 288.00 | 289.00 | 0 |
2017-07-19 | Fracture | 399.50 | 400.50 | 0 |
2017-07-19 | Fracture | 405.00 | 406.00 | 0 |
2017-07-19 | Fracture | 415.00 | 417.00 | 0 |
2017-07-19 | Fracture | 426.00 | 427.00 | 0 |
2017-07-19 | Fracture | 453.50 | 454.50 | 0 |
2017-07-19 | Fracture | 472.30 | 475.30 | 0 |
2017-07-19 | Fracture | 482.00 | 483.00 | 0 |
2017-07-19 | Fracture | 517.60 | 518.60 | 0 |
2017-06-08 | Packing Device Capped w/Cement | 1434.80 | 1442.80 | 0 |
2017-07-19 | Fracture | 523.00 | 524.50 | 0 |
2017-07-19 | Fracture | 534.00 | 535.00 | 0 |
2017-07-19 | Fracture | 543.90 | 544.90 | 0 |
2017-07-19 | Fracture | 549.60 | 551.60 | 0 |
2017-07-19 | Fracture | 564.00 | 565.00 | 0 |
2017-06-30 | Perforation | 282.00 | 283.00 | 13 |
2017-06-30 | Perforation | 288.00 | 289.00 | 13 |
2017-06-30 | Perforation | 399.50 | 400.50 | 13 |
2017-06-30 | Perforation | 405.00 | 406.00 | 13 |
2017-06-30 | Perforation | 415.00 | 417.00 | 13 |
2017-06-30 | Perforation | 426.00 | 427.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 3557 | 0.0 | 0.0 | 0.0 |
2018 | 7278 | 0.0 | 0.0 | 0.0 |
2019 | 8674 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-07-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]