X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284261606000

Well Details

Well ID: 0284261606000
Loading map...
Location: 00/06-16-028-26W4/0
Location Alias: 00/06-16-28-26 W4M
Location Alias 2: 00/06-16-028-26 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 26
Section: 16
County/Municipality: Rocky View County
Well Name: CPC RESOURCES ENTICE 6-16-28-26
Operator Name: Lynx Energy ULC
License Number: 0290032
License Date: 2003-07-18
License Status: Issued
Spud Date: 2003-08-03
Final Drill Date: 2003-08-04
Well Total Depth: 1010.00 m
Surface Hole Latitude: 51.392629
Surface Hole Longitude: -113.603687

For data sources see[1][2]

Well History

Date Event
2003-07-18 Obtained License
2003-08-03 Surface Casing Operation Performed
2003-08-04 Finished Drilling
2003-08-04 Production Casing Operation Performed
2003-08-04 Rig Released
2003-08-04 Well Mode changed to Drilled and Cased
2003-08-11 Well Log Performed
2003-08-18 Perforation Treatment Performed - Jet Perforation
2003-08-19 Perforation Treatment Performed - Jet Perforation
2003-08-21 Perforation Treatment Performed - Jet Perforation
2003-08-24 Perforation Treatment Performed - Fractured
2003-09-03 Perforation Treatment Performed - Jet Perforation
2003-11-09 Perforation Treatment Performed - Fractured
2003-11-16 Well Began Production
2003-11-16 Well Fluid changed to Coalbed Methane-Coals and Other
2003-11-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-08-18 Perforation 953.50 954.50 7
2003-09-03 Perforation 625.00 626.00 7
2003-09-03 Perforation 616.50 617.50 7
2003-09-03 Perforation 602.00 603.00 7
2003-09-03 Perforation 596.00 599.00 7
2003-09-03 Perforation 591.00 592.00 7
2003-09-03 Perforation 583.60 585.30 7
2003-09-03 Perforation 569.00 570.00 7
2003-09-03 Perforation 560.00 562.00 7
2003-09-03 Perforation 560.00 562.00 7
2003-09-03 Perforation 538.00 540.00 7
2003-08-19 Perforation 924.00 925.00 7
2003-09-03 Perforation 512.00 513.00 7
2003-09-03 Perforation 504.00 505.00 7
2003-09-03 Perforation 500.00 503.00 7
2003-09-03 Perforation 493.50 495.50 7
2003-09-03 Perforation 485.50 487.50 7
2003-09-03 Perforation 448.00 449.00 7
2003-09-03 Perforation 384.20 386.20 7
2003-09-03 Perforation 374.00 376.00 7
2003-09-03 Perforation 363.00 364.00 7
2003-09-03 Perforation 354.00 355.00 7
2003-08-21 Perforation 831.00 832.00 7
2003-09-03 Perforation 324.00 326.00 7
2003-09-03 Perforation 298.00 301.00 7
2003-09-03 Perforation 268.00 271.00 7
2003-09-03 Perforation 255.00 257.00 7
2003-09-03 Perforation 247.00 249.00 7
2003-09-03 Perforation 220.50 221.50 7
2003-11-09 Fracture 221.00 711.00 0
2003-08-24 Fracture 831.00 832.00 0
2003-09-03 Perforation 709.00 711.00 7
2003-09-03 Perforation 654.00 655.00 7
2003-09-03 Perforation 645.00 647.00 7
2003-09-03 Perforation 636.00 637.00 7
2003-09-03 Perforation 633.00 634.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1104 0.0 0.0 0.0
2004 8741 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8753 0.0 0.0 0.0
2007 8748 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8605 0.0 0.0 0.0
2010 8731 0.0 0.0 0.0
2011 8632 0.0 0.0 0.0
2012 8732 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8604 0.0 0.0 0.0
2015 8747 0.0 0.0 0.0
2016 8744 0.0 0.0 0.0
2017 8648 0.0 0.0 0.0
2018 8563 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References