X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0274273008000"

m
m
 
Line 134: Line 134:
 
| style="text-align: right;" | 815.90
 
| style="text-align: right;" | 815.90
 
| style="text-align: right;" | 816.40
 
| style="text-align: right;" | 816.40
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 795.40
 
| style="text-align: right;" | 795.90
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 784.50
 
| style="text-align: right;" | 785.50
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 777.70
 
| style="text-align: right;" | 778.20
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 761.80
 
| style="text-align: right;" | 762.30
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 758.80
 
| style="text-align: right;" | 759.30
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 739.80
 
| style="text-align: right;" | 740.30
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 735.30
 
| style="text-align: right;" | 735.80
 
| style="text-align: right;" | 13
 
|-
 
| 2006-11-04
 
| Perforation
 
| style="text-align: right;" | 727.10
 
| style="text-align: right;" | 727.60
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
Line 242: Line 194:
 
| style="text-align: right;" | 449.10
 
| style="text-align: right;" | 449.10
 
| style="text-align: right;" | 449.60
 
| style="text-align: right;" | 449.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 795.40
 +
| style="text-align: right;" | 795.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
Line 273: Line 231:
 
| style="text-align: right;" | 816.40
 
| style="text-align: right;" | 816.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 784.50
 +
| style="text-align: right;" | 785.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 777.70
 +
| style="text-align: right;" | 778.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 761.80
 +
| style="text-align: right;" | 762.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 758.80
 +
| style="text-align: right;" | 759.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 739.80
 +
| style="text-align: right;" | 740.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 735.30
 +
| style="text-align: right;" | 735.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2006-11-04
 +
| Perforation
 +
| style="text-align: right;" | 727.10
 +
| style="text-align: right;" | 727.60
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
|}
 
|}
Line 432: Line 432:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:13, 29 January 2021

Well Details

Well ID: 0274273008000
Loading map...
Location: 00/08-30-027-27W4/0
Location Alias: 00/08-30-27-27 W4M
Location Alias 2: 00/08-30-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 30
County/Municipality: Rocky View County
Well Name: EMBER CROSS 8-30-27-27
Operator Name: Ember Resources Inc.
License Number: 0339829
License Date: 2005-10-12
License Status: Issued
Spud Date: 2006-05-21
Final Drill Date: 2006-05-23
Well Total Depth: 953.00 m
Surface Hole Latitude: 51.333756
Surface Hole Longitude: -113.779617

For data sources see[1][2]

Well History

Date Event
2005-10-12 Obtained License
2006-05-21 Surface Casing Operation Performed
2006-05-23 Finished Drilling
2006-05-23 Production Casing Operation Performed
2006-05-23 Rig Released
2006-05-23 Well Mode changed to Drilled and Cased
2006-05-26 Well Log Performed
2006-11-04 Perforation Treatment Performed - Jet Perforation
2006-11-15 Perforation Treatment Performed - Fractured
2006-12-01 Well Began Production
2006-12-01 Well Fluid changed to Coalbed Methane-Coals Only
2006-12-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-11-04 Perforation 815.90 816.40 13
2006-11-04 Perforation 725.90 726.40 13
2006-11-04 Perforation 710.40 711.40 13
2006-11-04 Perforation 700.30 700.80 13
2006-11-04 Perforation 698.60 699.10 13
2006-11-04 Perforation 641.30 641.80 13
2006-11-04 Perforation 633.60 634.10 13
2006-11-04 Perforation 488.50 489.00 13
2006-11-04 Perforation 484.40 484.90 13
2006-11-04 Perforation 473.10 473.60 13
2006-11-04 Perforation 449.10 449.60 13
2006-11-04 Perforation 795.40 795.90 13
2006-11-04 Perforation 422.40 422.90 13
2006-11-04 Perforation 375.50 376.00 13
2006-11-04 Perforation 370.80 371.30 13
2006-11-04 Perforation 368.70 369.20 13
2006-11-15 Fracture 368.70 816.40 0
2006-11-04 Perforation 784.50 785.50 13
2006-11-04 Perforation 777.70 778.20 13
2006-11-04 Perforation 761.80 762.30 13
2006-11-04 Perforation 758.80 759.30 13
2006-11-04 Perforation 739.80 740.30 13
2006-11-04 Perforation 735.30 735.80 13
2006-11-04 Perforation 727.10 727.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 744 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8743 0.0 0.0 0.0
2011 8742 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8740 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References