If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274242714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.341501,"lon":-113.301264,"icon":""}]} |
Location: 00/14-27-027-24W4/0 | |
Location Alias: 00/14-27-27-24 W4M | |
Location Alias 2: 00/14-27-027-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 24 | |
Section: 27 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 14-27-27-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0325260 | |
License Date: 2005-01-28 | |
License Status: Issued | |
Spud Date: 2005-02-09 | |
Final Drill Date: 2005-02-17 | |
Well Total Depth: 634.00 m | |
Surface Hole Latitude: 51.341501 | |
Surface Hole Longitude: -113.301264 |
Date | Event |
---|---|
2005-01-28 | Obtained License |
2005-02-09 | Surface Casing Operation Performed |
2005-02-17 | Finished Drilling |
2005-02-17 | Production Casing Operation Performed |
2005-02-17 | Rig Released |
2005-02-17 | Well Mode changed to Drilled and Cased |
2005-02-18 | Well Log Performed |
2005-03-02 | Well Log Performed |
2005-03-18 | Perforation Treatment Performed - Jet Perforation |
2005-04-21 | Perforation Treatment Performed - Fractured |
2005-04-26 | Well Fluid changed to Gas |
2005-04-26 | Well Mode changed to Testing |
2005-05-24 | Perforation Treatment Performed - Jet Perforation |
2005-05-30 | Perforation Treatment Performed - Fractured |
2005-12-09 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-03-18 | Perforation | 438.00 | 442.00 | 14 |
2005-05-24 | Perforation | 477.70 | 478.20 | 13 |
2005-05-24 | Perforation | 469.30 | 469.80 | 13 |
2005-05-24 | Perforation | 462.00 | 462.50 | 13 |
2005-05-24 | Perforation | 461.20 | 461.70 | 13 |
2005-05-24 | Perforation | 454.10 | 454.60 | 13 |
2005-05-24 | Perforation | 410.60 | 411.10 | 13 |
2005-05-24 | Perforation | 407.60 | 408.10 | 13 |
2005-05-24 | Perforation | 404.00 | 404.50 | 13 |
2005-05-24 | Perforation | 398.90 | 399.40 | 13 |
2005-05-24 | Perforation | 392.80 | 393.30 | 13 |
2005-04-21 | Fracture | 438.00 | 442.00 | 0 |
2005-05-24 | Perforation | 389.80 | 390.30 | 13 |
2005-05-24 | Perforation | 374.70 | 375.20 | 13 |
2005-05-24 | Perforation | 373.40 | 373.90 | 13 |
2005-05-24 | Perforation | 371.20 | 371.70 | 13 |
2005-05-24 | Perforation | 365.10 | 365.60 | 13 |
2005-05-24 | Perforation | 357.70 | 358.20 | 13 |
2005-05-24 | Perforation | 350.70 | 351.20 | 13 |
2005-05-24 | Perforation | 347.40 | 347.90 | 13 |
2005-05-24 | Perforation | 343.00 | 343.50 | 13 |
2005-05-24 | Perforation | 340.40 | 340.90 | 13 |
2005-05-24 | Perforation | 534.30 | 534.80 | 13 |
2005-05-24 | Perforation | 332.80 | 333.30 | 13 |
2005-05-24 | Perforation | 316.70 | 317.20 | 13 |
2005-05-24 | Perforation | 298.30 | 298.80 | 13 |
2005-05-24 | Perforation | 295.50 | 296.00 | 13 |
2005-05-24 | Perforation | 287.70 | 288.20 | 13 |
2005-05-24 | Perforation | 249.40 | 249.90 | 13 |
2005-05-24 | Perforation | 239.70 | 240.20 | 13 |
2005-05-24 | Perforation | 228.10 | 228.60 | 13 |
2005-05-30 | Fracture | 228.10 | 534.80 | 0 |
2005-05-24 | Perforation | 524.50 | 525.00 | 13 |
2005-05-24 | Perforation | 523.10 | 523.60 | 13 |
2005-05-24 | Perforation | 522.30 | 522.80 | 13 |
2005-05-24 | Perforation | 490.90 | 491.40 | 13 |
2005-05-24 | Perforation | 489.50 | 490.00 | 13 |
2005-05-24 | Perforation | 483.40 | 483.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]