X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0264261909000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0264261909000
 
| Well ID: 0264261909000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.23613199999999779, -113.61339299999997365 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.236132, -113.613393 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/09-19-026-26W4/0
 
| Location: 00/09-19-026-26W4/0
 
|-
 
|-
| Well Name: ECA ECOG ARDEN 9-19-26-26
+
| Location Alias: 00/09-19-26-26 W4M
 +
|-
 +
| Location Alias 2: 00/09-19-026-26 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 026
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 19
 +
|-
 +
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 +
|-
 +
| Well Name: EMBER ENTICE 9-19-26-26
 +
|-
 +
| Operator Name: [[Ember Resources Inc.]]
 +
|-
 +
| License Number: 0404549
 
|-
 
|-
 
| License Date: 2008-11-24
 
| License Date: 2008-11-24
 
|-
 
|-
| Final Drilling Date: 2008-12-20
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2008-12-18
 +
|-
 +
| Final Drill Date: 2008-12-20
 +
|-
 +
| Well Total Depth: 793.00 m
 +
|-
 +
| Surface Hole Latitude: 51.236132
 +
|-
 +
| Surface Hole Longitude: -113.613393
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-11-24
 +
| Obtained License
 +
|-
 +
| 2008-12-18
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2008-12-20
 +
| Finished Drilling
 +
|-
 +
| 2008-12-20
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2008-12-21
 +
| Production Casing Operation Performed
 +
|-
 +
| 2008-12-21
 +
| Rig Released
 +
|-
 +
| 2008-12-21
 +
| Well Log Performed
 +
|-
 +
| 2009-01-04
 +
| Well Log Performed
 +
|-
 +
| 2009-03-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2009-03-14
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2009-03-19
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2009-03-19
 +
| Well Mode changed to Testing
 
|-
 
|-
| Total Depth: 793.0m
+
| 2009-03-24
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Fluid Type: Coalbed Methane-Coals and Oth
+
| 2009-06-12
 +
| Perforation Treatment Performed - Fractured
 
|-
 
|-
| Status: Flowing
+
| 2009-08-15
 +
| Well Began Production
 
|-
 
|-
| Well Type: Not Applicable
+
| 2009-08-15
 +
| Well Fluid changed to Coalbed Methane-Coals and Other
 
|-
 
|-
| Configuration: Vertical
+
| 2009-08-15
 +
| Well Mode changed to Flowing
 
|-
 
|-
| Latitude: 51.23613199999999779
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Longitude: -113.61339299999997365
+
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
|}-->
  
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2009-03-09
 +
| Perforation
 +
| style="text-align: right;" | 755.00
 +
| style="text-align: right;" | 758.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 630.90
 +
| style="text-align: right;" | 631.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 621.90
 +
| style="text-align: right;" | 622.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 608.50
 +
| style="text-align: right;" | 609.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 600.90
 +
| style="text-align: right;" | 601.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 594.40
 +
| style="text-align: right;" | 595.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 567.10
 +
| style="text-align: right;" | 567.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 560.00
 +
| style="text-align: right;" | 561.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 544.40
 +
| style="text-align: right;" | 544.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 518.50
 +
| style="text-align: right;" | 519.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 512.70
 +
| style="text-align: right;" | 513.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-09
 +
| Perforation
 +
| style="text-align: right;" | 481.50
 +
| style="text-align: right;" | 484.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 508.80
 +
| style="text-align: right;" | 509.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 507.40
 +
| style="text-align: right;" | 507.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 503.00
 +
| style="text-align: right;" | 503.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 491.80
 +
| style="text-align: right;" | 492.30
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 388.90
 +
| style="text-align: right;" | 389.40
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 384.30
 +
| style="text-align: right;" | 384.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 371.20
 +
| style="text-align: right;" | 371.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 369.10
 +
| style="text-align: right;" | 369.60
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 361.50
 +
| style="text-align: right;" | 362.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 611.00
 +
| style="text-align: right;" | 614.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-09
 +
| Perforation
 +
| style="text-align: right;" | 208.00
 +
| style="text-align: right;" | 211.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-06-12
 +
| Fracture
 +
| style="text-align: right;" | 361.50
 +
| style="text-align: right;" | 671.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-06-12
 +
| Fracture
 +
| style="text-align: right;" | 611.00
 +
| style="text-align: right;" | 614.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-03-14
 +
| Fracture
 +
| style="text-align: right;" | 481.50
 +
| style="text-align: right;" | 484.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-03-14
 +
| Fracture
 +
| style="text-align: right;" | 208.00
 +
| style="text-align: right;" | 211.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 670.50
 +
| style="text-align: right;" | 671.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 649.80
 +
| style="text-align: right;" | 650.80
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 643.20
 +
| style="text-align: right;" | 643.70
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2009-03-24
 +
| Perforation
 +
| style="text-align: right;" | 634.50
 +
| style="text-align: right;" | 635.00
 +
| style="text-align: right;" | 13
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 3408
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8582
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 7460
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 4597
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8551
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8555
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8700
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8369
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8375
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8193
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8339
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2148
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 12:04, 29 January 2021

Well Details

Well ID: 0264261909000
Loading map...
Location: 00/09-19-026-26W4/0
Location Alias: 00/09-19-26-26 W4M
Location Alias 2: 00/09-19-026-26 W4/00
Country: Canada
Province: Alberta
Township: 026
Meridian: 4
Range: 26
Section: 19
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-19-26-26
Operator Name: Ember Resources Inc.
License Number: 0404549
License Date: 2008-11-24
License Status: Issued
Spud Date: 2008-12-18
Final Drill Date: 2008-12-20
Well Total Depth: 793.00 m
Surface Hole Latitude: 51.236132
Surface Hole Longitude: -113.613393

For data sources see[1][2]

Well History

Date Event
2008-11-24 Obtained License
2008-12-18 Surface Casing Operation Performed
2008-12-20 Finished Drilling
2008-12-20 Well Mode changed to Drilled and Cased
2008-12-21 Production Casing Operation Performed
2008-12-21 Rig Released
2008-12-21 Well Log Performed
2009-01-04 Well Log Performed
2009-03-09 Perforation Treatment Performed - Jet Perforation
2009-03-14 Perforation Treatment Performed - Fractured
2009-03-19 Well Fluid changed to Gas
2009-03-19 Well Mode changed to Testing
2009-03-24 Perforation Treatment Performed - Jet Perforation
2009-06-12 Perforation Treatment Performed - Fractured
2009-08-15 Well Began Production
2009-08-15 Well Fluid changed to Coalbed Methane-Coals and Other
2009-08-15 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-09 Perforation 755.00 758.00 13
2009-03-24 Perforation 630.90 631.40 13
2009-03-24 Perforation 621.90 622.40 13
2009-03-24 Perforation 608.50 609.00 13
2009-03-24 Perforation 600.90 601.40 13
2009-03-24 Perforation 594.40 595.40 13
2009-03-24 Perforation 567.10 567.60 13
2009-03-24 Perforation 560.00 561.00 13
2009-03-24 Perforation 544.40 544.90 13
2009-03-24 Perforation 518.50 519.00 13
2009-03-24 Perforation 512.70 513.20 13
2009-03-09 Perforation 481.50 484.50 13
2009-03-24 Perforation 508.80 509.30 13
2009-03-24 Perforation 507.40 507.90 13
2009-03-24 Perforation 503.00 503.50 13
2009-03-24 Perforation 491.80 492.30 13
2009-03-24 Perforation 388.90 389.40 13
2009-03-24 Perforation 384.30 384.80 13
2009-03-24 Perforation 371.20 371.70 13
2009-03-24 Perforation 369.10 369.60 13
2009-03-24 Perforation 361.50 362.00 13
2009-03-24 Perforation 611.00 614.00 13
2009-03-09 Perforation 208.00 211.00 13
2009-06-12 Fracture 361.50 671.50 0
2009-06-12 Fracture 611.00 614.00 0
2009-03-14 Fracture 481.50 484.50 0
2009-03-14 Fracture 208.00 211.00 0
2009-03-24 Perforation 670.50 671.50 13
2009-03-24 Perforation 649.80 650.80 13
2009-03-24 Perforation 643.20 643.70 13
2009-03-24 Perforation 634.50 635.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 3408 0.0 0.0 0.0
2010 8582 0.0 0.0 0.0
2011 7460 0.0 0.0 0.0
2012 4597 0.0 0.0 0.0
2013 8551 0.0 0.0 0.0
2014 8555 0.0 0.0 0.0
2015 8700 0.0 0.0 0.0
2016 8369 0.0 0.0 0.0
2017 8375 0.0 0.0 0.0
2018 8193 0.0 0.0 0.0
2019 8339 0.0 0.0 0.0
2020 2148 0.0 0.0 0.0

For data sources see[5]

References