X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0255013408000

Well Details

Well ID: 0255013408000
Loading map...
Location: 00/08-34-025-01W5/0
Location Alias: 00/08-34-25-01 W5M
Location Alias 2: 00/08-34-025-01 W5/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 5
Range: 01
Section: 34
County/Municipality: Calgary
Well Name: FINA CROSSFIELD 8-34-25-1
Operator Name: Crescendo Oil & Gas Ltd.
License Number: 0011877
License Date: 1956-07-18
License Status: RecExempt
Spud Date: 1956-07-19
Final Drill Date: 1956-09-24
Well Total Depth: 2795.60 m
Surface Hole Latitude: 51.174249
Surface Hole Longitude: -114.051061

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-18 Obtained License
1956-08-14 Drill Stem Test Performed
1956-08-20 Drill Stem Test Performed
1956-08-24 Drill Stem Test Performed
1956-09-15 Drill Stem Test Performed
1956-09-17 Drill Stem Test Performed
1956-09-22 Drill Stem Test Performed
1956-09-24 Finished Drilling
1956-09-24 Well Mode changed to Drilled and Cased
1956-09-27 Production Casing Operation Performed
1956-10-01 Perforation Treatment Performed - Bullet Perforation
1956-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-14 Perforation Treatment Performed - Cement Plug
1957-01-16 Perforation Treatment Performed - Bullet Perforation
1957-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-22 Perforation Treatment Performed - Cement Plug
1957-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-01-23 Perforation Treatment Performed - Bullet Perforation
1957-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-29 Perforation Treatment Performed - Fractured
1957-02-08 Well Began Production
1957-02-08 Well Fluid changed to Crude Oil
1957-02-08 Well Mode changed to Flowing
1963-08-27 Well Fluid changed to Crude Oil
1963-08-27 Well Mode changed to Pumping
1985-12-31 Well Fluid changed to Crude Oil
1985-12-31 Well Mode changed to Suspended
1990-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-09 Plug Back Performed
1990-08-09 Well Abandoned
1990-08-09 Well Fluid changed to Crude Oil
1990-08-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-10-01 Bullet Perforation 2746.60 2754.80 13
1957-01-23 Bullet Perforation 1801.40 1804.40 0
1957-01-28 Acid Treatment 1801.40 1804.40 0
1957-01-29 Fracture 1801.40 1804.40 0
1990-08-09 Packing Device Capped w/Cement 1769.80 1777.80 0
1956-10-01 Bullet Perforation 2757.80 2767.00 13
1956-10-08 Acid Treatment 2746.60 2767.00 0
1956-10-15 Acid Treatment 2746.60 2767.00 0
1957-01-14 Cement Plug 2739.20 2740.20 0
1957-01-16 Bullet Perforation 2319.80 2323.50 13
1957-01-19 Acid Treatment 2319.80 2323.50 0
1957-01-22 Cement Plug 2264.70 2331.70 0
1957-01-23 Packing Device Capped w/Cement 1813.60 1813.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 144 0.0 0.0 0.0
1969 768 0.0 0.0 0.0
1970 568 0.0 0.0 0.0
1971 776 0.0 0.0 0.0
1972 808 0.0 0.0 0.0
1973 832 0.0 0.0 0.0
1974 812 0.0 0.0 0.0
1975 832 0.0 0.0 0.0
1976 1776 0.0 0.0 0.0
1977 2128 0.0 0.0 0.0
1978 2304 0.0 0.0 0.0
1979 1524 0.0 0.0 0.0
1980 2102 0.0 0.0 0.0
1981 1074 0.0 0.0 0.0
1982 24 0.0 0.0 0.0

For data sources see[5]

References