If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254262204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.142981,"lon":-113.562225,"icon":""}]} |
Location: 00/04-22-025-26W4/0 | |
Location Alias: 00/04-22-25-26 W4M | |
Location Alias 2: 00/04-22-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 4-22-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0396953 | |
License Date: 2008-05-28 | |
License Status: Amended | |
Spud Date: 2009-01-26 | |
Final Drill Date: 2009-01-27 | |
Well Total Depth: 1017.00 m | |
Surface Hole Latitude: 51.142981 | |
Surface Hole Longitude: -113.562225 |
Date | Event |
---|---|
2008-05-28 | Obtained License |
2009-01-26 | Surface Casing Operation Performed |
2009-01-27 | Direction Drilling Operation Performed - Deviate |
2009-01-27 | Finished Drilling |
2009-01-27 | Production Casing Operation Performed |
2009-01-27 | Rig Released |
2009-01-27 | Well Mode changed to Drilled and Cased |
2009-02-07 | Well Log Performed |
2009-02-27 | Perforation Treatment Performed - Jet Perforation |
2009-03-10 | Perforation Treatment Performed - Jet Perforation |
2009-09-02 | Perforation Treatment Performed - Jet Perforation |
2009-09-11 | Perforation Treatment Performed - Fractured |
2009-10-08 | Well Began Production |
2009-10-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-10-08 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-27 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-27 | Perforation | 944.50 | 946.00 | 13 |
2009-09-02 | Perforation | 578.60 | 579.10 | 13 |
2009-09-02 | Perforation | 563.10 | 563.60 | 13 |
2009-09-02 | Perforation | 543.20 | 545.20 | 13 |
2009-09-02 | Perforation | 538.60 | 540.60 | 13 |
2009-09-02 | Perforation | 524.10 | 525.10 | 13 |
2009-09-02 | Perforation | 518.10 | 518.60 | 13 |
2009-09-02 | Perforation | 500.30 | 501.30 | 13 |
2009-09-02 | Perforation | 494.10 | 494.60 | 13 |
2009-09-02 | Perforation | 485.60 | 486.10 | 13 |
2009-09-02 | Perforation | 481.50 | 482.00 | 13 |
2009-03-10 | Perforation | 821.50 | 823.50 | 13 |
2009-09-02 | Perforation | 477.00 | 477.50 | 13 |
2009-09-02 | Perforation | 473.80 | 474.30 | 13 |
2009-09-02 | Perforation | 469.50 | 470.00 | 13 |
2009-09-02 | Perforation | 452.00 | 452.50 | 13 |
2009-09-02 | Perforation | 355.80 | 356.80 | 13 |
2009-09-02 | Perforation | 333.50 | 334.00 | 13 |
2009-09-02 | Perforation | 224.40 | 226.40 | 13 |
2009-09-11 | Fracture | 224.40 | 658.10 | 0 |
2009-09-02 | Perforation | 657.60 | 658.10 | 13 |
2009-09-02 | Perforation | 652.30 | 653.30 | 13 |
2009-09-02 | Perforation | 617.20 | 617.70 | 13 |
2009-09-02 | Perforation | 613.90 | 614.90 | 13 |
2009-09-02 | Perforation | 611.10 | 612.10 | 13 |
2009-09-02 | Perforation | 602.40 | 602.90 | 13 |
2009-09-02 | Perforation | 586.10 | 588.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 2040 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 8704 | 0.0 | 0.0 | 0.0 |
2013 | 8600 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]