X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0254260413000

Well Details

Well ID: 0254260413000
Loading map...
Location: 00/13-04-025-26W4/0
Location Alias: 00/13-04-25-26 W4M
Location Alias 2: 00/13-04-025-26 W4/00
Country: Canada
Province: Alberta
Township: 025
Meridian: 4
Range: 26
Section: 04
County/Municipality: Wheatland County
Well Name: EMBER ENTICE 13-4-25-26
Operator Name: Ember Resources Inc.
License Number: 0412400
License Date: 2009-09-17
License Status: Issued
Spud Date: 2009-11-23
Final Drill Date: 2009-11-25
Well Total Depth: 1128.00 m
Surface Hole Latitude: 51.105970
Surface Hole Longitude: -113.581173

For data sources see[1][2]

Well History

Date Event
2009-09-17 Obtained License
2009-11-23 Direction Drilling Operation Performed - Deviate
2009-11-24 Surface Casing Operation Performed
2009-11-25 Finished Drilling
2009-11-25 Production Casing Operation Performed
2009-11-25 Rig Released
2009-11-25 Well Mode changed to Drilled and Cased
2009-11-30 Well Log Performed
2010-02-01 Perforation Treatment Performed - Jet Perforation
2010-02-08 Perforation Treatment Performed - Fractured
2010-02-12 Well Fluid changed to Gas
2010-02-12 Well Mode changed to Testing
2010-02-23 Perforation Treatment Performed - Jet Perforation
2010-03-30 Well Structure changed to Commingled
2010-05-25 Perforation Treatment Performed - Fractured
2010-08-20 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-23 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-01 Perforation 665.00 670.00 13
2010-02-23 Perforation 691.10 693.10 13
2010-02-23 Perforation 690.40 690.90 13
2010-02-23 Perforation 656.10 656.60 13
2010-02-23 Perforation 633.00 637.00 13
2010-02-23 Perforation 620.60 621.60 13
2010-02-23 Perforation 614.90 615.40 13
2010-02-23 Perforation 593.80 594.30 13
2010-02-23 Perforation 587.90 588.40 13
2010-02-23 Perforation 586.20 586.70 13
2010-02-23 Perforation 581.40 581.90 13
2010-02-08 Fracture 665.00 670.00 0
2010-02-23 Perforation 568.70 569.70 13
2010-02-23 Perforation 454.80 455.30 13
2010-02-23 Perforation 440.30 440.80 13
2010-02-23 Perforation 435.60 436.10 13
2010-02-23 Perforation 282.80 283.30 13
2010-02-23 Perforation 637.30 638.30 13
2010-02-23 Perforation 488.00 490.00 13
2010-02-23 Perforation 245.00 248.00 13
2010-05-25 Fracture 282.80 763.00 0
2010-02-23 Perforation 761.00 763.00 13
2010-02-23 Perforation 757.60 758.10 13
2010-02-23 Perforation 754.90 755.40 13
2010-02-23 Perforation 719.30 719.80 13
2010-02-23 Perforation 713.30 713.80 13
2010-02-23 Perforation 709.60 710.60 13
2010-02-23 Perforation 703.00 703.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 28 0.0 0.0 0.0

For data sources see[6]

References