If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254260315000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.102854,"lon":-113.550448,"icon":""}]} |
Location: 00/15-03-025-26W4/0 | |
Location Alias: 00/15-03-25-26 W4M | |
Location Alias 2: 00/15-03-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 03 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 15-3-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420948 | |
License Date: 2010-06-04 | |
License Status: Issued | |
Spud Date: 2010-10-21 | |
Final Drill Date: 2010-10-22 | |
Well Total Depth: 1248.00 m | |
Surface Hole Latitude: 51.102854 | |
Surface Hole Longitude: -113.550448 |
Date | Event |
---|---|
2010-06-04 | Obtained License |
2010-10-21 | Direction Drilling Operation Performed - Deviate |
2010-10-21 | Surface Casing Operation Performed |
2010-10-22 | Finished Drilling |
2010-10-22 | Production Casing Operation Performed |
2010-10-22 | Rig Released |
2010-10-22 | Well Mode changed to Drilled and Cased |
2010-10-29 | Well Log Performed |
2010-12-01 | Perforation Treatment Performed - Jet Perforation |
2011-01-03 | Perforation Treatment Performed - Jet Perforation |
2011-01-28 | Perforation Treatment Performed - Fractured |
2011-02-05 | Well Began Production |
2011-02-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-05 | Well Mode changed to Flowing |
2016-06-06 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-21 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-01 | Perforation | 731.50 | 733.50 | 13 |
2011-01-03 | Perforation | 680.40 | 682.40 | 13 |
2011-01-03 | Perforation | 669.20 | 669.70 | 13 |
2011-01-03 | Perforation | 650.10 | 650.60 | 13 |
2011-01-03 | Perforation | 653.90 | 654.40 | 13 |
2011-01-03 | Perforation | 454.70 | 455.70 | 13 |
2011-01-03 | Perforation | 464.50 | 465.50 | 13 |
2011-01-03 | Perforation | 319.20 | 321.20 | 13 |
2011-01-03 | Perforation | 260.50 | 261.50 | 13 |
2011-01-03 | Perforation | 267.40 | 267.90 | 13 |
2011-01-03 | Perforation | 574.50 | 575.00 | 13 |
2010-12-01 | Perforation | 914.50 | 916.50 | 13 |
2011-01-03 | Perforation | 623.00 | 623.50 | 13 |
2011-01-03 | Perforation | 556.40 | 556.90 | 13 |
2011-01-03 | Perforation | 481.00 | 481.50 | 13 |
2011-01-03 | Perforation | 498.60 | 499.10 | 13 |
2011-01-03 | Perforation | 689.10 | 689.60 | 13 |
2011-01-03 | Perforation | 335.00 | 337.00 | 13 |
2011-01-03 | Perforation | 1050.00 | 1051.50 | 13 |
2011-01-03 | Perforation | 839.10 | 840.10 | 13 |
2011-01-03 | Perforation | 343.00 | 345.00 | 13 |
2011-01-03 | Perforation | 942.00 | 944.00 | 13 |
2010-12-01 | Perforation | 1208.00 | 1210.00 | 13 |
2011-01-03 | Perforation | 929.50 | 931.50 | 13 |
2011-01-03 | Perforation | 525.00 | 527.00 | 13 |
2011-01-03 | Perforation | 837.40 | 837.90 | 13 |
2011-01-03 | Perforation | 773.00 | 774.00 | 13 |
2011-01-03 | Perforation | 756.60 | 759.60 | 13 |
2011-01-03 | Perforation | 780.20 | 781.20 | 13 |
2011-01-03 | Perforation | 785.30 | 786.30 | 13 |
2011-01-03 | Perforation | 791.50 | 792.00 | 13 |
2011-01-03 | Perforation | 830.80 | 831.30 | 13 |
2011-01-03 | Perforation | 696.30 | 699.30 | 13 |
2011-01-03 | Perforation | 645.20 | 646.20 | 13 |
2011-01-28 | Fracture | 319.20 | 321.20 | 0 |
2011-01-28 | Fracture | 556.40 | 699.30 | 0 |
2011-01-28 | Fracture | 454.70 | 499.10 | 0 |
2011-01-28 | Fracture | 830.80 | 840.10 | 0 |
2011-01-28 | Fracture | 756.60 | 792.00 | 0 |
2011-01-28 | Fracture | 525.00 | 527.00 | 0 |
2011-01-28 | Fracture | 335.00 | 345.00 | 0 |
2011-01-28 | Fracture | 731.50 | 733.50 | 0 |
2011-01-28 | Fracture | 1050.00 | 1051.50 | 0 |
2011-01-28 | Fracture | 914.50 | 944.00 | 0 |
2011-01-03 | Perforation | 648.00 | 648.50 | 13 |
2011-01-03 | Perforation | 640.80 | 641.80 | 13 |
2011-01-03 | Perforation | 625.80 | 626.30 | 13 |
2011-01-03 | Perforation | 627.10 | 627.60 | 13 |
2011-01-03 | Perforation | 675.20 | 675.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7867 | 0.0 | 0.0 | 0.0 |
2012 | 8686 | 0.0 | 0.0 | 0.0 |
2013 | 8599 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-06-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]