If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0254260302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.102854,"lon":-113.550734,"icon":""}]} |
Location: 00/02-03-025-26W4/0 | |
Location Alias: 00/02-03-25-26 W4M | |
Location Alias 2: 00/02-03-025-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 025 | |
Meridian: 4 | |
Range: 26 | |
Section: 03 | |
County/Municipality: Wheatland County | |
Well Name: EMBER ENTICE 2-3-25-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420947 | |
License Date: 2010-06-04 | |
License Status: Issued | |
Spud Date: 2010-10-20 | |
Final Drill Date: 2010-10-21 | |
Well Total Depth: 1188.00 m | |
Surface Hole Latitude: 51.102854 | |
Surface Hole Longitude: -113.550734 |
Date | Event |
---|---|
2010-06-04 | Obtained License |
2010-10-20 | Direction Drilling Operation Performed - Deviate |
2010-10-20 | Surface Casing Operation Performed |
2010-10-21 | Finished Drilling |
2010-10-21 | Production Casing Operation Performed |
2010-10-21 | Rig Released |
2010-10-21 | Well Mode changed to Drilled and Cased |
2010-10-24 | Well Log Performed |
2010-12-01 | Perforation Treatment Performed - Jet Perforation |
2011-01-25 | Perforation Treatment Performed - Fractured |
2011-02-08 | Perforation Treatment Performed - Jet Perforation |
2011-02-20 | Perforation Treatment Performed - Fractured |
2011-03-07 | Well Began Production |
2011-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-20 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-01 | Perforation | 1156.00 | 1159.00 | 13 |
2011-02-08 | Perforation | 634.30 | 634.80 | 13 |
2011-02-08 | Perforation | 655.10 | 655.60 | 13 |
2011-02-08 | Perforation | 729.10 | 731.10 | 13 |
2011-02-08 | Perforation | 756.80 | 757.80 | 13 |
2011-02-08 | Perforation | 763.00 | 763.50 | 13 |
2011-02-08 | Perforation | 752.70 | 753.70 | 13 |
2011-02-08 | Perforation | 731.90 | 732.40 | 13 |
2011-02-08 | Perforation | 746.00 | 747.00 | 13 |
2011-02-08 | Perforation | 322.90 | 323.40 | 13 |
2011-02-08 | Perforation | 458.00 | 458.50 | 13 |
2010-12-01 | Perforation | 1147.00 | 1149.00 | 13 |
2011-02-08 | Perforation | 319.90 | 320.40 | 13 |
2011-02-08 | Perforation | 286.40 | 287.40 | 13 |
2011-02-08 | Perforation | 316.40 | 316.90 | 13 |
2011-02-08 | Perforation | 468.00 | 469.00 | 13 |
2011-02-08 | Perforation | 625.70 | 626.70 | 13 |
2011-02-08 | Perforation | 628.00 | 628.50 | 13 |
2011-02-08 | Perforation | 621.30 | 622.30 | 13 |
2011-02-08 | Perforation | 480.00 | 480.50 | 13 |
2011-02-08 | Perforation | 608.30 | 609.80 | 13 |
2011-02-08 | Perforation | 452.00 | 454.00 | 13 |
2010-12-01 | Perforation | 488.00 | 491.00 | 13 |
2011-02-08 | Perforation | 473.00 | 475.00 | 13 |
2011-02-08 | Perforation | 410.00 | 412.00 | 13 |
2011-02-08 | Perforation | 341.00 | 344.00 | 13 |
2011-02-08 | Perforation | 348.00 | 350.00 | 13 |
2011-02-08 | Perforation | 505.00 | 507.00 | 13 |
2011-02-08 | Perforation | 651.00 | 652.00 | 13 |
2011-02-08 | Perforation | 705.00 | 708.00 | 13 |
2011-02-08 | Perforation | 579.00 | 581.00 | 13 |
2011-02-08 | Perforation | 543.00 | 544.00 | 13 |
2011-02-08 | Perforation | 568.00 | 569.00 | 13 |
2011-01-25 | Fracture | 1156.00 | 1159.00 | 0 |
2011-02-08 | Perforation | 809.20 | 809.70 | 13 |
2011-02-08 | Perforation | 806.40 | 806.90 | 13 |
2011-02-08 | Perforation | 798.70 | 799.20 | 13 |
2011-02-08 | Perforation | 314.00 | 316.00 | 13 |
2011-02-08 | Perforation | 326.00 | 328.00 | 13 |
2011-02-20 | Fracture | 655.10 | 701.00 | 0 |
2011-02-20 | Fracture | 729.10 | 763.50 | 0 |
2011-02-20 | Fracture | 608.30 | 634.80 | 0 |
2011-02-20 | Fracture | 286.40 | 287.40 | 0 |
2011-02-20 | Fracture | 316.40 | 323.40 | 0 |
2011-01-25 | Fracture | 1147.00 | 1149.00 | 0 |
2011-02-20 | Fracture | 458.00 | 469.00 | 0 |
2011-02-20 | Fracture | 798.70 | 809.70 | 0 |
2011-02-20 | Fracture | 326.00 | 454.00 | 0 |
2011-02-20 | Fracture | 473.00 | 475.00 | 0 |
2011-02-20 | Fracture | 505.00 | 581.00 | 0 |
2011-02-20 | Fracture | 651.00 | 652.00 | 0 |
2011-02-20 | Fracture | 705.00 | 708.00 | 0 |
2011-02-20 | Fracture | 314.00 | 316.00 | 0 |
2011-01-25 | Fracture | 488.00 | 491.00 | 0 |
2011-02-08 | Perforation | 675.60 | 679.60 | 13 |
2011-02-08 | Perforation | 700.50 | 701.00 | 13 |
2011-02-08 | Perforation | 660.10 | 662.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7189 | 0.0 | 0.0 | 0.0 |
2012 | 8714 | 0.0 | 0.0 | 0.0 |
2013 | 8598 | 0.0 | 0.0 | 0.0 |
2014 | 8593 | 0.0 | 0.0 | 0.0 |
2015 | 8677 | 0.0 | 0.0 | 0.0 |
2016 | 8702 | 0.0 | 0.0 | 0.0 |
2017 | 8673 | 0.0 | 0.0 | 0.0 |
2018 | 8717 | 0.0 | 0.0 | 0.0 |
2019 | 8487 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]